Harion Municipality
Office Of The Excutive Municipal Harion, Sarlahi
                                                                                         Cost Estimate
Name of work :Om Sidhartha Gumba Sauchalaya                                                                                                     FY 2075/076
Name of place : Harion municipality, ward-06                                                                                                    Date:-
     Item                                                                     Length      Breadth     Height
 S.N
      No               Description of item                             No     (meter)     (meter)     (meter)     Quantity   Unit       Rate Amount               Remarks.
                        CIVIL WORKS
                   Clearing the site of all the unuseful materials
 1       1.0                                                            1        -            -          -            1.00    L.S.     650.00            650.00
                   from site after completing the works.
 2                 E/W in excavation
                                                              toilet
                                                          longwall      2      4.60         0.60         0.90         4.97
                                                         shortwall      2      1.09         0.60         0.90         1.18
                                                     partition wall     2      1.09         0.30         0.30         0.20
                                                       septic tank      1      3.50         2.30         2.40        19.32
         2.0                                                                                        Total E/W =      25.67   M3        346.08           8883.88
 3                 Brick Soling
                                                              toilet
                                                          longwall      2      4.60                      0.60         5.52
                                                         shortwall      2      1.09                      0.60         1.31
                                                     partition wall     2      1.09                      0.30         0.65
                                                       septic tank      1      3.50                      2.30         8.05
         3.0                                                                          Total Brick soling work =      15.53   M2        500.96           7779.84
 4                 1:2:4 P.C.C.
                                                              toilet
                                                          longwall      2      4.60          0.60        0.08         0.41
                                                         shortwall      2      1.09          0.60        0.08         0.10
                                                     partition wall     2      1.09          0.30        0.08         0.05
                                                       septic tank      1      3.50          2.30        0.08         0.60
         4.0                                                                          Total 1:2:4 P.C.C. work =       1.16   M3      13371.90          15511.41
     5             Brick Masonary Work in 1:6 C/S Mortar
                                                        toilet
                                                     longwall           2      4.60         0.60        0.30          1.66
                                                                        2      4.60         0.45        0.30          1.24
                                                                        2      4.60         0.30        0.25          0.69
                                                                        2      4.60         0.23        2.70          5.71
                                                         shortwall      2      1.09         0.60        0.30          0.39
                                                                        2      1.09         0.45        0.30          0.29
                                                                        2      1.09         0.30        0.25          0.16
                                                                        2      1.09         0.23        2.70          1.35
                                                     partition wall     2      1.09         0.30        0.30          0.20
                                                                        2      1.09         0.13        2.70          0.74
                                                        septic tank
                                                          longwall      2      3.50         0.13        2.40          2.10
                                                         shortwall      2      2.30         0.13        2.40          1.38
               5                                                                            Total Brick Work=        15.91   M3      10813.94         172049.73
    6           1:1.5:3 P.C.C. for R.C.C. work -
                                                     toilet slab   1       4.10       2.90        0.10        1.19
                                             septic tank cover     1       3.50       2.30        0.08        0.60
         6.0                                                              Total P.C.C. for R.C.C. work =      1.79   M3   13371.90   23935.71
    7           Steel reinforcement for R.C.C. work
         7.0                                                   Total R.C.C. Work 1% of P.C.C. of R.C.C=     140.52   kg      96.30   13532.61
    8           Form work
                                                     toilet slab   1       4.10        -        2.90         11.89
                                                   side of slab    2       4.10        -        0.10          0.82
                                                                   2       2.90        -        0.10          0.58
                                             septic tank cover     1       3.50       -         2.30          8.05
                                            side of septic tank    2       3.50                 0.08          0.53
                                                                   2       2.30                 0.08          0.35
         8.0                                                                         Total Form Work=        22.22   M2     293.48    6521.23
    9           12.5mm Cement plaster (1:4) on wall
                                                          toilet
                                                    inside wall    4       1.09        -         2.70        11.77
                                                                   2       3.89        -         2.70        21.01
                                                   outside wall    2       4.60        -         2.70        24.84
                                                                   2       1.55        -         2.70         8.37
                                                        ceiling    1       5.20        -         2.15        11.18
                                                          floor    1       3.89                  1.09         4.24
                                                    septic tank
                                                    inside wall    2       2.69        -         9.00        48.42
                                                                   2       1.84        -         9.00        33.12
                                                         cover     1       3.15        -         2.30         7.25
                                                          floor    1       2.69        -         1.84         4.95
                                                     deduction
                                                    ventilation    3       0.30                   0.30       -0.27
                                                              D    3       0.75                   1.80       -4.05
         9.0                                                                               total plaster=   170.83   M2     264.54   45191.17
`
    10          Punning work
                                                          toilet
                                                          floor    1       3.89                  1.09         4.24
                                                    septic tank
                                                    inside wall    2       2.69        -         9.00        48.42
                                                                   2       1.84        -         9.00        33.12
                                                          floor    1       2.69        -         1.84         4.95
         10.0                                                                              Total Punning     90.73   M2     234.55   21280.99
 11              Two coat distemer paint
                                                        toilet
                                                  inside wall       4         1.09    -          2.70                11.77
                                                                    2         3.89    -          2.70                21.01
                                                 outside wall       2         4.60    -          2.70                24.84
                                                                    2         1.55    -          2.70                 8.37
                                                      ceiling       1         5.20    -          2.15                11.18
          11.0                                                                               Total Paint =           77.17       M2         116.83     9015.81
 12              Chaukath Works
                                                         door       2         4.80   0.08        0.08                 0.06
                                                                    2         0.60   0.08        0.08                 0.01
          12.0                                                                                   Total =              0.06       M2      177912.00    11528.70
 13
                 0.50 mm Colour C.G.I. sheet door covering.
                                                                    2         0.75                1.95                2.93
          13.0                                                                              Total Paint =             2.93       M2        1125.13     3296.64
 14       14.0 580 mm orissa pan with low level cistern             3                                                 2.00       No.       3000.00     6000.00
               3/4'' dia PPR pipe,Gate Valve and necessary
 15       15.0                                                      1
               fittings.                                                                                             1.00        Job       8000.00     8000.00
               water tank 5000 litre                                2                                             5000.00        litre
                                                                          Total                                                                      353177.72
                                                    Amount contributed by Municipality                                                               300000.00
                                                  Amount contributed by User's community                                                             53177.72
पेश गर्                                                          जाच गर्ने सहि:                             प्ाहाण गर्ने सहि :                                   स्वनकण गर्ने सहि: