Revised estimate of Panchayat Sarkar Bhawan main building for balance
Name of Work :-
                                                           work on current rate Pnchayat-Saraki,Block- Adhoura. (Kaimur), Bihar.
                                                                                                                                         Plinth Ht. of Main Buil         1.5
                                                                    PANCHAYAT SARKAR BHAWAN(Open FDN)
                                                                                                        Work done Amount      Balanced work to be done on currentrate       Revised Amount
     SOR
                                                                            As per Estimate                as per M.B.                     01.01.2022                          Estimate
Sl. Refere                Item of Works                   Unit                                                                                                                                      Remark
      nce                                                         Gross                                                        Gross                                    Quintity      Amount
                                                                                                                    Amount
                                                                 Quintity       Rate          Amount   Quintity               Quintity      Rate           Amount       (9+12)        (9+12)
1     2                            3                       4      5.000        6.000           7.00     8.00          9         10           11              12           13            14           15
           Surface dressing of the ground
           including removing vegetation and
1                                                         sqm     0.00         11.27           0.00         0.00     0.00      0.00        13.55             0.00              0.00          0.00
           inequilities not exceeding 15 cm deep
           do do with all comp job
            Earth work in excavation in foundation
           trenches or drains(not exceeding 1.5 m in
2          width or 10 sqm on plan) including             cum    437.55       319.60     139840.98        393.90 125890.44     43.65       360.70         15744.56         437.55      141635.00
           dressing of sides and ramming of bottoms,
           lift upto 1.5 m . Including getting out the
           excavated soil and disposal of surplus
           Filling available excavated earth (excluding
           rock) in trenches, plinth, sides of
           foundations etc. in layers not exceeding 20    cum    218.77       103.30      22598.94        196.99   20349.07    21.78       123.90          2698.54         218.77       23047.61
           cm indepth: consolidating each deposited
3          layer by ramming and watering lead
            Supplying and Filling in plinth with local
           sand and under floors including, watering,     cum    701.13       238.60     167289.62         24.62   5874.33    676.51       287.30        194361.32         701.13      200235.66
           ramming consolidating and dressing
4 2..28
           complete
            Brick work with bricks of class
           designation 100A in foundations and            cum      228        4799.20 1094217.60          161.80 776510.56    66.20       4819.90        319077.38         228.00     1095587.94
           plinth in : Cement mortar 1:6 (1 cement: 6
 5
           coarse sand )
            Brick work with bricks of class
           designation 100A in foundations and
           plinth in : Cement mortar 1:6 (1 cement: 6
   6.1.14A
           coarse sand )
           Extra for Brick work in superstructure
    6.3A above plinth level upto floor V                  cum    288.15       5501.40 1585228.41          191.19 1051812.67    96.96      5662.10        548997.22         288.15     1600809.88
 7 6.18.4 Half brick masonry with bricks of class
   a       designation 100A in foundations and
           plinth in : Cement mortar 1:4 (1 cement: 4
           coarse send)
    6.20a Extra for half Brick masonry in
           superstructure above pinth level upto floor    sqm     47.17       671.50      31674.66          0.00     0.00      47.17       599.30         28268.98          47.17       28268.98
           V level.
 8 6.21A Extra for providing and placing in position
           2 Nos, 6 mm dia , MS bars at every third       cum     47.17         0.00           0.00         0.00     0.00      47.17        0.00             0.00           47.17            0.00
           course of half brick masonry (with F. P. S.
           bricks)
           CEMENT CONRETE WORK
 9 4.1.3 Providing and laying in position cement
           concrete of specified grade exluding the       cum     122.9       4151.40    510207.06         21.47   89130.56   101.43      3998.10        405527.28         122.90      494657.84
           cost of centring and shuttering-all work
                                                                                                               Page 1 of 6
                                                                                                     Work done Amount      Balanced work to be done on currentrate       Revised Amount
     SOR
                                                                         As per Estimate                as per M.B.                     01.01.2022                          Estimate
Sl. Refere               Item of Works                 Unit                                                                                                                                    Remark
      nce                                                      Gross                                                        Gross                                    Quintity      Amount
                                                                                                                 Amount
                                                              Quintity       Rate          Amount   Quintity               Quintity      Rate           Amount       (9+12)        (9+12)
1    2                         3                        4      5.000        6.000           7.00     8.00          9         10           11              12           13            14         15
10 5.1.2 Providing and laying in position specified
         grade of reinforced cement concrete
         excluding the cost of                         cum     83.99       4902.30    411744.18         83.99 411744.18     0.00       4688.10            0.00           83.99     411744.18
         centring,shuttering,finishing and
         reinforcement-All work puto plinth level.
11 5.2.2 Reinforced cement concrete work in wall
         (any thickness),including attached
                                                       cum     42.87       5723.30    245357.87         26.70 152812.11     16.17      5670.00         91683.90          42.87     244496.01
         pilasters, buttresses, plinth and string
         courses, fillets, columns, pillars, piers,
12 5.3 abutments,     posts and
         Reinforced cement     conrete work in
        +  beams,suspended floors,roofs having slope
      5.33 upto 15, landings,balconiec,                cum     15.72       5455.90     85766.75          5.95   32462.61    9.77       5335.90         52131.74          15.72      84594.35
       (B) shelves,chajjas, lintels, bands, plain
           window sills, staircases and spiral stair
           cases upto floor five level excludingthe
13     5.3 Reinforced cement conrete work in
        +  beams,suspended floors,roofs having slope
      5.33 upto 15, landings,balconiec,                sqm     88.9        5455.90    485029.51          0.00     0.00      88.90      5335.90        474361.51          88.90     474361.51
       (B) shelves,chajjas, lintels, bands, plain
           window sills, staircases and spiral stair
14   5.3   Reinforced cement conrete work in
     +     beams,suspended floors,roofs having slope
     5.33 upto 15, landings,balconiec,                 cum     13.44       5455.90     73327.30          0.00     0.00      13.44      5335.90         71714.50          13.44      71714.50
     (B)   shelves,chajjas, lintels, bands, plain
           window sills, staircases and spiral stair
           cases upto floor five level excludingthe
15   5.3   Reinforced cement conrete work in
     +     beams,suspended floors,roofs having slope
     5.33 upto 15, landings,balconiec,                 cum     7.32        5455.90     39937.19          0.00     0.00      7.32       5335.90         39058.79             7.32    39058.79
     (B)   shelves,chajjas, lintels, bands, plain
           window sills, staircases and spiral stair
16   5.3   Reinforced cement conrete work in
     +     beams,suspended floors,roofs having slope
     5.33 upto 15, landings,balconiec,
     (B)   shelves,chajjas, lintels, bands, plain
           window sills, staircases and spiral stair   cum     3.67        5455.90     20023.15          0.00     0.00      3.67       5335.90         19582.75             3.67    19582.75
           cases upto floor five level excludingthe
           cost of 1 cement:1.5 coarse sand:3 graded
           stone aggregate 20 mm nominal
17    5.22 size).Chhaja
           Computation of Steel
             8mm                                       kg      9452         77.40     731584.80      3918.63 303301.96     5533.37      94.50         522903.47       9452.00      826205.43
             10mm                                      kg      6215         76.70     476690.50      3021.85 231775.90     3193.15      92.60         295685.69       6215.00      527461.59
             12mm                                      kg      7250         75.20     545200.00      2723.40 204799.68     4526.60      90.80         411015.28       7250.00      615814.96
             16mm                                      kg     1933.21       76.00     146923.96          0.00     0.00     1933.21      91.70         177275.36       1933.21      177275.36
         Centering and Shuttering
18 5.9.1 Centring and shuttering including
         strutting,propping etc.and removal or form     cum   165.74       186.30      30877.36        144.75   26966.93    20.99       211.60          4441.48         165.74      31408.41
         work for Foundations,footings, bases
         Columns
19 5.9.3                                                sqm
    Centering and shuttering in Suspended floors, Landings    531.03       362.60     192551.48          0.00     0.00     531.03       437.50        232325.63         531.03     232325.63
                                                                                                            Page 2 of 6
                                                                                                                Work done Amount      Balanced work to be done on currentrate       Revised Amount
         SOR
                                                                                    As per Estimate                as per M.B.                     01.01.2022                          Estimate
    Sl. Refere                Item of Works                    Unit                                                                                                                                         Remark
          nce                                                            Gross                                                         Gross                                    Quintity      Amount
                                                                                                                            Amount
                                                                        Quintity        Rate          Amount   Quintity               Quintity      Rate           Amount       (9+12)        (9+12)
    1     2                         3                           4         5.000        6.000           7.00     8.00          9         10           11              12           13            14           15
             PL Band & GL Band
    20 5.9.5 Centering and shuttering in Plinth beam,
                                                              sqm        425.14       335.30     142549.44         99.48   33355.64   325.66       404.70        131794.60         425.14     165150.25
             major Lintel, Roof Beam
    21 5.9.6 Centering and shuttering for stiffners           sqm        395.76       425.80     168514.61        271.96 115800.57    123.80       494.40         61206.72         395.76     177007.29
    22 5.9.7 Centering and shuttering in Stair waist slab     sqm         42.77       384.70      16453.62          0.00     0.00      42.77       439.90         18814.52          42.77      18814.52
    23 5.9.19 Centering and shuttering in Chajja              sqm         58.31       468.40      27312.40          0.00     0.00      58.31       550.90         32122.98          58.31      32122.98
               DOORS AND WINDOWS
               providing & fixing Tiron frme for doors
    24 10.14.1
               windows & ventiltors of mills steel T
               section ,joints milterd & welded with 15x3       m         1166         85.60      99809.60          0.00     0.00     1166.00      110.40        128726.40       1166.00      128726.40
               mm lugs do ll complete
               Providing and fixing factory made uPVC
               door frame made of uPVC exturded
    25 9.143 sections of size 65mm X 55mm with wall
                   For toilet and Living Block latrine
                                                                m         25.05       448.10      11224.91          0.00     0.00      25.05       516.80         12945.84          25.05      12945.84
                          and bathroom doors
               35 mm thick factory made solid panel PVC
               Door shutter made out of single piece
    26 9.142.2 extruded solid PVC profiles 5mm
                                                              sqm         7.99        3429.00     27397.71          0.00     0.00      7.99       3865.70         30886.94             7.99    30886.94
  32(A)       swinging door for disabled person               sqm         1.92        3429.00      6583.68          0.00     0.00      1.92       3653.00          7013.76             1.92     7013.76
              Providing & fixing 1mm thick M.S Sheet
              door with frame of 40x40x6 mm do all            sqm         68.88       2721.10    187429.37          0.00     0.00      68.88      4279.90        294799.51          68.88     294799.51
    27 10.5.1 complete
    28 10.12 Steel glazed windows and ventilator              sqm         48.11       2973.30    143045.46          0.00     0.00      48.11      3038.90        146201.48          48.11     146201.48
    29 10.13B Extra for steel beading to support window glasscum          48.11       367.00      17656.37          0.00     0.00      48.11       396.70         19085.24          48.11      19085.24
               Steel work welded in built up
               sections/framed worK including cutting
               hoisting, rixing in position and applying a    kg        2679.45        88.80     237935.16          0.00     0.00     2679.45      114.60        307064.97       2679.45      307064.97
               priming coat of approved
               steel primer using structural steel, etc. as
    30 10.32.2
               required
    31 9.1.1 Providing second class teak wood railing        cum          0.16       95749.10     15319.86          0.00     0.00      0.16      125260.60        20041.70             0.16    20041.70
    32 10.18 cast iron box for ceiling fan                      nos         45        141.30      6358.50           0.00     0.00      45.00       165.40          7443.00          45.00       7443.00
              FLOORING WORK
    33 11.72One Brick Flat soling jionts filled with local sand sqm      992.77       277.50     275493.68        412.36 114429.90    580.41       283.30        164430.15         992.77     278860.05
              Providing designation 100A one brick on
    34 11.73 edge soling joint filled with local sand           sqm          0        439.80           0.00         0.00     0.00      0.00        287.30            0.00              0.00          0.00
              including
    35 11.3.1 Providing and laying Cement concrete flooring 1:2:4(1 cement:2
              coarse:sand:4 graded stone agregate) finished with a floating coat
              of neat cement including cement slurry, etc. but excluding the cost
              of nosing of steps etc. complete. 40 mm thick with 20 mm nominal
              size stone aggregate
                                                              sqm        404.62       282.60     114345.61          0.00     0.00     404.62       289.10        116975.64         404.62     116975.64
       11.26.1
over36
     20 mm (average ) thick base laid over and jointed with grey cement slurry mixed with pigment
                                                                                                                       Page 3 of 6
                                                                                                         Work done Amount     Balanced work to be done on currentrate       Revised Amount
     SOR
                                                                             As per Estimate                as per M.B.                    01.01.2022                          Estimate
Sl. Refere                 Item of Works                   Unit                                                                                                                                   Remark
      nce                                                          Gross                                                       Gross                                    Quintity     Amount
                                                                                                                     Amount
                                                                  Quintity       Rate          Amount   Quintity              Quintity      Rate           Amount       (9+12)       (9+12)
1     2                           3                         4      5.000        6.000           7.00     8.00          9        10           11              12           13            14         15
             to match the shade of the slab including
             rubbing and polishing complete
          25 mm thick                                      sqm    300.17       1119.60    336070.33          0.00     0.00    300.17      1252.70        376022.96         300.17     376022.96
          Kota stone skirting (upto 30 cm hieght)
   11.49 with cement mortar 1:3 (1 cement:3                sqm     39.24       1191.10     46738.76          0.00     0.00     39.24      1334.90         52381.48          39.24      52381.48
          coarse sand) finished with a floating coat
37        of neat cement. 18 mm thick.
38 11.6.1 Cement plaster skirting (upto 30 cm
          hieght) with cement mortar 1:3 (1                sqm     57.19       284.86      16291.14          0.00     0.00     57.19       304.15         17394.34          57.19      17394.34
          cement:3 coarse sand) finished with a
          floating coat of neat cement. 18 mm thick.
39 11.38 300 x 300 Ceramic glazed floor tiles in toilets   sqm     34.87       736.40      25678.27          0.00     0.00     34.87       686.80         23948.72          34.87      23948.72
40 11.38 Ceramic Glazed Tiles Skirting, Dado               sqm    113.28       736.40      83419.39          0.00     0.00    113.28       795.00         90057.60         113.28      90057.60
           PLASTER WORK
41 13.11.4 12 mm cement plaster 1:6 (outside surface)      sqm    1299.56      126.20     164004.47          0.00     0.00    1299.56      141.50        183887.74       1299.56      183887.74
42 13.12.4 15 mm cement plaster 1:6 (inside surface)       sqm    1584.36      145.50     230524.38          0.00     0.00    1584.36      162.80        257933.81       1584.36      257933.81
43 13.24.2 6 mm cement plaster 1:4 in ceiling              sqm    750.43       110.90      83222.69          0.00     0.00    750.43       125.60         94254.01         750.43      94254.01
44 13.11.1 12 mm plaster 1:3 with cement punning           sqm    421.02       192.20      80920.04          0.00     0.00    421.02       204.80         86224.90         421.02      86224.90
           Finishing Walls with water proofing
           cement paint of approved brand and
45 13.79.1 manufacture and of required shade to give       sqm    1299.56       68.30      88759.95          0.00     0.00    1299.56      81.20         105524.27       1299.56      105524.27
           an even shade New work (three or more
           coats)
           Apply one coat of cement primer of
46 13.78.1 approved brand and manufactur                   sqm    2334.79       31.00      72378.49          0.00     0.00    2334.79      38.60          90122.89       2334.79       90122.89
47 13.75 Dry distemper with                                cum    2334.79       58.70     137052.17          0.00     0.00    2334.79      70.50         164602.70       2334.79      164602.70
           Painting with ready mixed paint of
48 13.82.1 approved brand and manufacture in all           sqm    653.71        74.50      48701.40          0.00     0.00    653.71       83.50          54584.79         653.71      54584.79
           shades to give an even shade : New
           steel work (two or more coats)
           ROOFING WORK
   13.13. 20mm thick cement plaster in mix 1:3 with
   1       water proofing materials
      +
49                                                         sqm    321.69       227.30      73120.14          0.00     0.00    321.69       227.60         73216.64         321.69      73216.64
   13.36.
     5
50 10.5 Providing and fixing in position collapsible
          steel shutters with vertical channes
          20x10x2 mm and braced with flat iron
          diagonals 20x5 mm size with top and
          bottom rail of T-tron 40x40x6 mm with 40         sqm     19.38       5089.50     98634.51          0.00     0.00     19.38      6303.80        122167.64          19.38     122167.64
          mm dia steel pulleys complete with
          bots.nuts locking arrangement stoppers
          handies including applying a priming coat
          of approved steel primer.
                                                                                                                Page 4 of 6
                                                                                                              Work done Amount           Balanced work to be done on currentrate         Revised Amount
     SOR
                                                                                 As per Estimate                 as per M.B.                          01.01.2022                            Estimate
Sl. Refere                 Item of Works                    Unit                                                                                                                                                    Remark
      nce                                                              Gross                                                             Gross                                       Quintity         Amount
                                                                                                                            Amount
                                                                      Quintity       Rate          Amount    Quintity                   Quintity        Rate          Amount         (9+12)           (9+12)
1     2                            3                          4        5.000        6.000           7.00       8.00            9          10             11             12             13               14           15
           Providing & fixing 18 mm thick gang saw
51 8.2.2.1 cut,, mirrorpolished …. Do all complete at       sqm        4.58        3741.20     17134.70             0.00     0.00        4.58          4242.90       19432.48               4.58        19432.48
           all level granite of all colour & shade area
           of slab upto .5 sqm
           Construction of embankment with
52
 3.3+3.5(III)                                               cum          0         207.50           0.00            0.00     0.00        0.00          207.50           0.00                0.00             0.00
           approved material do all complete
                                                                                                                                                                                                    10915182.87
                                                            Total                   3815            280        356          238104        671.220
53           Carriage of Materials
             Bricks (7+1 km)                                                                                238104.00         %o          1221.59       290,865
             Stone Chips (11 Manpur to manpur RH+156train+
                                                                                                                             cum
             15bhabuaRH toBhabua)                                                                             280.16                      2264.50       634,422
             Coarse Sand (169+1KM)                                                                            356.45         cum          1704.97       607,735
             Local Sand (2+km)                                                                                671.22         cum           316.86       212,684
             Cement(5KM)                                                                                      190.75          MT               0.00            -
             steel(5KM)                                                                                       24.850          MT               0.00            -
                                                                                                                                                       1,745,706
53           Add different cost of materials
             Bricks                                                                                          238104           %o            79.00        18,810
             Cement                                                                                           3815           bags          -43.20       (164,808)
             Cement                                                                                                                        .           1,599,709                                        1,599,709
                                                                                                                                        Total Rs                                                   Rs.12514891.57
                                                                                                                                                                                                     12514892.00
                                                           S.O.R       w.e.f       1.1.2022
                                               Lead                                       Houlage with O.H & C.P           Loading/       CARRIAGE COST
Materials                                                                                                                  Unloading   Labour
                                                                                                                                                                     Add 2%
                                                                                                                           with O.H
                                                                                                                                                       with O.H     Seigniorage
                                                                                                                             &C.P
                                 Ls                          Lu         Lk           Hs             Hu         Hk                                     &C.P&GST        Charge
 STONE                                                                                                                       195.1
  CHIPS                          110                          0          1          11.20          13.50       27.2                        1           4075.61             2264.50
CORSE
                                                                                                                             195.1
 SAND                            69                           0          1          11.20          13.50       27.2                        1           1671.53             1704.97
 LOCAL                                                                                                                       195.1
  SAND                            2                           0          1          11.20          13.50       27.2                        1           310.65               316.86
CEMENT                            5                           0          0          11.20          13.50       27.2          402.0         1           462.58               471.83
                                                                                                                             402.0
 STEEL                            5                           0          0          11.20          13.50       27.2                        1           462.58               471.83
 BRIKS                            7                           0          1          11.20          13.50       27.2          617.3         1           1197.64             1221.59
                               Where,
                                 Ls=                      Lead on surface road       Hs =     Houlage on surface road
                                 Lu=                      Lead on unsurface road     Hu=      Houlage on unsurface road
                                                                                                                      Page 5 of 6
                                                                                                  Work done Amount      Balanced work to be done on currentrate       Revised Amount
     SOR
                                                                     As per Estimate                 as per M.B.                     01.01.2022                          Estimate
Sl. Refere             Item of Works               Unit                                                                                                                                 Remark
      nce                                                  Gross                                                         Gross                                    Quintity     Amount
                                                                                                               Amount
                                                          Quintity       Rate          Amount    Quintity               Quintity      Rate           Amount       (9+12)       (9+12)
1     2                     3                       4      5.000        6.000           7.00       8.00          9        10           11              12           13            14     15
                           Lk=                Lead on kuchcha road       Hk =    Houlage on kuchcha road
             RATE OF AS PER SOR OF BCD , DATED :                                                01.01.2022
                                                                                                          Page 6 of 6