0% found this document useful (0 votes)
10 views4 pages

Testing of Equipments

The document details equipment testing conducted by M. T. Anatoly Lamekhov, including various systems such as fire detection, fuel oil, engine maneuvering, and safety equipment, with all tests yielding satisfactory results. Specific tests were performed on emergency systems, gas detection, electrical supply, navigational equipment, and galley appliances, confirming their operational readiness. The report indicates compliance with safety regulations and operational standards across multiple equipment categories.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views4 pages

Testing of Equipments

The document details equipment testing conducted by M. T. Anatoly Lamekhov, including various systems such as fire detection, fuel oil, engine maneuvering, and safety equipment, with all tests yielding satisfactory results. Specific tests were performed on emergency systems, gas detection, electrical supply, navigational equipment, and galley appliances, confirming their operational readiness. The report indicates compliance with safety regulations and operational standards across multiple equipment categories.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

M. T.

ANATOLY LAMEKHOV

EQUIPMENT TESTING DETAILS


SR.NO ITEM Date REMARKS
A Testing of various Equipment
Testing of ships fire detection system – ensure there are no delays between activation and the bells all detector tested, no abnormality , found in good
1 sounding 6/8/2024
working condition

2 Confirm the automatic door release mechanisms operational on fire doors where fitted 6/8/2024 door release mechanism found working satisfactory
Carry out an emergency muster and a boat muster – statutory requirement within 24 hours of taking
3 over.
tested, system found operational , generating
Run the emergency fire pump, charge one hose and prove system operational
4 7/8/2024 pressure of 15 bar, one charged hose throughput
tested, found satisfactory
5 Run the accommodation at-will hoses and prove good if applicable 7/8/2024 found satisfactory
Check that the main engine room fixed fire extinguishing system is on automatic and ready to release
6 whether it be CO2

7 (Gas Vessels) Check the fixed Dry Powder stations on deck are ready to go
8 Check the local firefighting capability for generators etc. is in operational readiness in auto.
9 Confirm location of the bilge injection valve and label accordingly
Run the emergency generator on auto start and confirm it takes load emergency DG tested manully on battery and
10 9/8/2024 hydraulic start, auto start and onload test carried out,
found in good working condition

B Fuel Oil System:


Is the system functioning normally and maintaining fuel temperature within normal range 6/8/2024
11
Is system pressure maintained within normal range during engine operation and stand still conditions
12
13 LO Pressure Satisfactory
14 FW Cooling Systems Satisfactory
15 Main engine air compressors operational and satisfactory
16 Main engine air start system leak free
17 Main engine control air system leak free

C Engine Manoeuvring System Satisfactory


18 Commissioning letter received confirming NCR/MCR conditions 6/8/2024 recdeived and posted in ECR / Wheel house
19 Stern tube system oil levels normal and sealing arrangement leak free 6/8/2024 confirmed oil level normal
20 M/E Alarms & Trips tested and working satisfactorily
21 Aux blowers operating normally
Control air compressors satisfactory (Check cut in/out frequency) 6/8/2024
control air compressor in use and running
22 satisfactory
23 Turning Gear interlock function test
24 First Start Arrangement satisfactory
25 Test all starting arrangements for Emergency genset

D Nitrogen Plant and N2 compressors


26 Verify operation of N2 compressor in auto
27 N2 gas leakage alarm

E Inert Gas Generator


28 Verify IGG full auto operation. To confirm O2% is in 4-4.5% Range
29 Verify Drying plant full auto operation
30 Test CSW no flow trip – IGG
31 Test High O2 recirculation valve operational
32 Confirm operation of O2 content monitor
33 Confirm operation of dew point meter – Drying plant
34 Confirm adequate calibration gas available on board
35 Emergency stop trip tested

F Gas Detection system


Gas Detection systemConfirm GAS detection system activates alarms with no delay
Test fuel gas master valve trip for GAS detected
36

G STEAM PLANT
37 Integrity of Steam system satisfactory (list defects) 6/8/2024 working satisfactory,
Integrity of Feed system satisfactory (list defects)
9/8/2024 found leaking feed pump , same seal changed by
38 yard , present status running normal without leak
39 Feed water regulators functioning normally
40 Water level indicators satisfactory 6/8/2024 working satisfactory, compared with local gauge
41 Control Equipment Satisfactory:
· Flame failure alarms and trips
· Low and High water level alarms and trips operating satisfactorily
· Burner operation satisfactory
· Integrity of Fuel system satisfactory (list defects)
· Manual fuel trips tested and satisfactory
· FO pump remote stops operating
· FD fan remote stops operating

42 FD Fans Operating Satisfactorily


43 Boiler casings free from gas leaks (list defects)
44 Test fire boiler in all operating modes

H DISTILLING PLANT
Plant working satisfactorily and producing rated output tried out F.W.G , production noted to be 30 mt/day
10/8/2024
45 each for NO.1 & No.2

46 Water meters operative 10/8/2024 flow meter working


47 Adequate distilled and fresh water reserves on board on sailing 10/8/2024 all F.W Tk full to its capacity

I HULL OPENINGS
48 All shipside valves opening and closing freely

J MOORING AND LIFTING EQUIPMENT


49 Windlass and attachments in good order – Raise / Lower anchors
50 Capstans in good working order
51 Deck winches in good working order
52 Engine room cranes operating satisfactorily
53 Stores cranes operating satisfactorily
54 Cargo hose davit/crane operating satisfactorily

K ELECTRICAL SUPPLY
55 Switchboard meters operating satisfactorily 9/8/2024 working in good condition
56 All AVRs operating
57 Reverse power trips operational and tested
58 Generators’ Overspeed trips operational and tested
59 Governor controls operational and tested
60 Alternators operating in parallel – operate satisfactorily
61 Power Management System fully operational
62 All alarms and trips tested and satisfactory – switchboard

L NAVIGATIONAL EQUIPMENT
63 All equipment’s and associated systems operating satisfactorily
Steering gear changeover, emergency arrangements, communications and alarms tested and
satisfactory, procedure in place.
64
65 Whistles and controls operating satisfactorily
66 Radar/ARPA/ECDIS fully operational – shadow diagrams posted
67 Gyro compasses satisfactory
68 Magnetic Compass satisfactory – Compass deviation card posted
69 Doppler / Electro-magnetic Satellite Log satisfactory
70 Echo Sounder satisfactory and both transducers operational
71 GPS receivers displaying correct position
72 DSAS unit switched on and CSO informed
73 GMDSS equipment satisfactory
74 Engine Order Recorder operating satisfactorily
75 VDR switched on at delivery and operational
76 AIS system switched on an operational
Miscellaneous Instruments operating satisfactorily, weather fax, rudder angle indicator, wind
anemometer, etc.
77
78 Check operation of ships PA system
79 Check operation of master clock
80 Check operation of bridge window wipers
81 VHF self-test

M MISCELLANEOUS
82 Incinerator operating satisfactorily 6/8/2024 incinerator tried out, working normal
Function test of Inert Gas System, inert gas to be vented to deck for 30 minutes with less than 5% O2
produced. This test to be run in conjunction with function test
83
84 Sewage treatment plant on line and operating satisfactorily 9/8/2024
Bilge system tested internally system operated Bilge tank to Bilge tank , found
7/8/2024
85 working normal
OWS – function test of 3-way valve and alarm proven. To be operated to Sea at First Suitable
opportunity Function test of 3 way valve and alarm tested.
10/8/2024
Operation test will be carried out after departure.
86
F.O & L.O purifier plant in operation and operating in required temperature range without problem MDO / MGO / L.O Purifier tested, found normal
9/8/2024
working
87
General cleanliness of machinery spaces, power plant and auxiliary machinery satisfactory all spares secured, no moving parts, cleanliness well
9/8/2024
88 maintained
89 Bilge Injection valve opened and closed
90 Gas Detection system on and operational, at least one sensor to be tested
91 Check all fixed dry power stations are ready for use
Bilge alarms:
Engine room All E/R Bilge High lvl alarms tried out, total 8 nos,
10/8/2024
92 found in good working condition
93 Forecastle
94 Purge air system for manifold blowing
95 Loading Computer, check ullages / soundings

N GALLEY SAFETY EQUIPMENT


96 Co2 Extinguishing System for Galley Duct inspected and ready for use.
97 Wet Chemical Fire Extinguisher for Deep Frying Machine inspected and ready for use
98 Cold Chambers Alarm tested and temperature satisfactory
99 Portable Fire Extinguisher in place
100 Fire Blanket Fitted

O GALLEY ELECTRICAL APPLIANCES – FUNCTION TEST


101 Main Range 6/8/2024 checked, working in good condition
102 Baker’s Oven 6/8/2024 checked, working in good condition
103 Combination Oven 6/8/2024 checked, working in good condition
104 Dough Mixing Machine
105 Salamander Grill
106 Microwave Oven (Test Door Seal For Leakage) 6/8/2024 checked, working in good condition
107 Deep Frying Machine 6/8/2024 checked, working in good condition
108 Dish Washing Machine 6/8/2024 checked, working in good condition
109 Potato Peeling Machine
110 Waste Disposal Unit
111 Refrigerator 6/8/2024 checked, working in good condition
112 Deep Freeze Unit 6/8/2024 checked, working in good condition
113 Griddle Plate 6/8/2024 checked, working in good condition
114 Water Boilers 6/8/2024 checked, working in good condition
115 Galley Air Conditioning Unit (dedicated unit) 6/8/2024 checked, working in good condition
116 Supply Fans 6/8/2024 checked, working in good condition
117 Exhaust Fans 6/8/2024 checked, working in good condition

P GALLEY FITTINGS
118 Doors and Drawers on All Fitted Units Operate Correctly 6/8/2024 doors and drawer operation satisfactory
119 Anti-roll Bars on Main Range Fit Correctly 6/8/2024 anti roll bars checked , fit correctly
120 Scupper Covers Fit Correctly 6/8/2024 checked , fit correctly

Q ACCOMMODATION
121 All Fixed Fittings in Place
122 Sanitary Extraction Fan Effective 6/8/2024 extraction fan working and effective
123 Lifejacket
124 ELSA / EEBD Set

R LAUNDRY ROOMS
125 Washing Machines – Function Test 8/8/2024 checked, working normal
126 Drying Machines – Function Test 8/8/2024 checked, working normal
127 Hydro Extractor – Function Test
128 Lighting 8/8/2024 checked, working normal
129 Deck Covering
130 Room Heater (Drying Room) – (function test) 8/8/2024 checked, working normal
S SAFETY EQUIPMENT
131 Fire detection system proven and random heads tested – no delays on bells
132 Fire door magnet switches release on fire alarm activation
133 Emergency fire pump satisfactory in ballast condition
134 Fan dampers/flaps satisfactory
Fixed Fire Fighting Installations inspected / tested where appropriate and left enabled (including paint
locker), Keys placed in boxes next to cabinets, leaded seals intact
135
· CO2
· Dry powder
· Watermist

136 Lifeboat tested in-water


137 Rescue boat tested in-water
138 Local Procedure in place for lifeboat/rescue boat deployment
139 Fire Hydrants and Hoses satisfactory
140 All other fire-fighting and LSA equipment proved and deployed
141 Accommodation fire-fighting system satisfactory
142 Fire extinguishers satisfactory, including spares
143 Emergency stop switches tested satisfactory
144 Emergency shut off valves tested satisfactory
145 Fan interlocks proven
146 Padlocks to be removed from all safety gear stowage boxes
147 Rescue Boat fuel tank filled (Petrol & 2 stroke Oil supplied as applicable)
148 Lifeboat fuel level checked and air cylinders fully charged
149 EEBD cylinders fully charged
150 N2 purging system for tanks & risers ok (LPG)