0% found this document useful (0 votes)
11 views1 page

Time Sheet of April'2025

The document is a time sheet for Khalilur Rahman, a Pavement Design Engineer at EPTISA Servicios de Ingenieria S.L., detailing work hours and activities for April 2025. The majority of the time was spent preparing spreadsheets for traffic counts and analyzing geometric and structural designs for the Climate Smart Rural Transport project. The sheet includes holidays and leave days, confirming the accuracy of reported working hours.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

Time Sheet of April'2025

The document is a time sheet for Khalilur Rahman, a Pavement Design Engineer at EPTISA Servicios de Ingenieria S.L., detailing work hours and activities for April 2025. The majority of the time was spent preparing spreadsheets for traffic counts and analyzing geometric and structural designs for the Climate Smart Rural Transport project. The sheet includes holidays and leave days, confirming the accuracy of reported working hours.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Feasibility Study and Preparation for Sustainable and Integrated Rural Transport Project (SIRTP)

renamed as Climate Smart Rural Transport (CSmaRT)


under Program for Supporting Rural Bridges (SupRB)
Time Sheet

April, 2025 Name: Khalilur Rahman

Company: EPTISA Servicios de Ingenieria S.L. Designation: Pavement Design Engineer

Off -
Date Day Hours Brief description of activities during working hour
Station
1 Tue EID UL FITR HOLYDAY

2 Wed EID UL FITR HOLYDAY

3 Thu EID UL FITR HOLYDAY

4 Fri WEEKLY HOLYDAY

5 Sat WEEKLY HOLYDAY


Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
6 Sun 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
7 Mon 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
8 Tue 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
9 Wed 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
10 Thu 8.0 Dhaka and structural Design for the pavement.
11 Fri WEEKLY HOLYDAY

12 Sat WEEKLY HOLYDAY


Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
13 Sun 8.0 Dhaka and structural Design for the pavement.
14 Mon GOVT. HOLYDAY
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
15 Tue 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
16 Wed 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
17 Thu 8.0 Dhaka and structural Design for the pavement.
18 Fri 8.0 WEEKLY HOLYDAY

19 Sat 8.0 WEEKLY HOLYDAY

20 Sun LEAVE

21 Mon LEAVE

22 Tue LEAVE
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
23 Wed 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
24 Thu 8.0 Dhaka and structural Design for the pavement.
25 Fri 8.0 WEEKLY HOLYDAY

26 Sat 8.0 WEEKLY HOLYDAY


Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
27 Sun 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
28 Mon 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
29 Tue 8.0 Dhaka and structural Design for the pavement.
Preparation of spreadsheet for Traffic count, CVD, PCU, EASL calculation and analysing Geometric
30 Wed 8.0 Dhaka and structural Design for the pavement.
I hereby certify that, the job mentioned above is true and complete statement of my working hours for this month.

Signature Approved by

You might also like