SOUTH CENTRAL RAILWAY
SECUNDERABAD DIVISION
SECUNDERABAD
STALLING REPORT 24-05-2025
Date of Incident 24-05-2025 Loco-1/Type/Base: 31257 WAG9 GMO
Incident type STALLING Loco-2/Type/Base:
Train No BPCL/BTPN Load 52/52/3924 Gradient 1 in 100
Section KZJ-SNF Location KZJ-PQL
Detention 25" Punctuality Loss .
Repercussion .
Cause of Incident .
Reason STALLING
Reported to DIVISION
Locomotive Details LP ALP
Loco1 Loco2 Name P.NAGARAJU ANJANEYULU A
31257 Designation/HQRS LPG/SNF1201 ALP/SNF3252
WAG9 GMO Gradation / Ph No. B/918790993226 -/9063331505
DOB 06-02-1977 18-08-1996
TOH DONE 28/03/2025
DOA 08-06-2006 18-04-2022
IA DUE 27/06/2025 ITI
EQ B.Tech
DOP 09-06-2014 25-04-2023
PME DUE 03-01-2026 25-04-2027
GSR DUE 17-01-2026 25-07-2025
TECH DUE - D/E 16-06-26/26-11-25 25-06-25/-
Last Monitoring Date
LI Name B.R.PAWAR S.V.M.KRISHNA
Chronological order of occurance:
W/O banker memo given
01:10 Train started from R1 KZJ yard
01:20 LP informed that train stopped at Km No 323/1 due to continuous wheel slip due to drizzling weather
01:25 Started to back the train after taking P.N no-85 from RRI/KZJ
01:51 Fouling cleared to R1
Conclusion:
Responsibility:
SOUTH CENTRAL RAILWAY
SECUNDERABAD DIVISION
SECUNDERABAD
LOCO TROUBLE REPORT 24-05-2025
Date of Incident 24-05-2025 Loco-1/Type/Base: 31442 WAG9 LGD
Incident type LOCO TROUBLE Loco-2/Type/Base:
Train No 07256 Load 24 COACHES Gradient 1 in 150
Section KZJ-BPQ Location PPZ-MCI
Detention 58" Punctuality Loss 07075
Repercussion .
Cause of Incident .
Reason LOCO TROUBLE
Reported to DIVISION
Locomotive Details LP ALP
Loco1 Loco2 Name B.SOMAIAH NEERAJ KUMAR
31442 Designation/HQRS LPG/KZJ2855 SALP/KZJ3192
WAG9 LGD Gradation / Ph No. B/918790992532 -/919963143962
DOB 13-05-1978 18-08-1993
IC DONE 28/04/2025
DOA 16-05-2000 21-01-2016
IA DUE 27/07/2025 ITI
EQ ITI
DOP 14-12-2015 28-06-2023
PME DUE 08-05-27 24-02-28
GSR DUE 18-12-27 09-09-2026
TECH DUE - D/E 23-04-28 27-04-27
Last Monitoring Date
LI Name M RAJENDER D.POCHAIAH
Chronological order of occurance:
03:23 PPZ departure.
03:34 After passing neutral section smell observed in from machine room near SR1, mean while message external earth fault in
converter-1,DJ tripped
Train stopped at KM no:261/2 due to DJ not holding
Made CE OFF/ON, traction bogie-1 isolated, trouble rectified
03:40 Train departure from spot with 3 TM's, due to 1 IN 150 raising gradient and heavy rain extra time taken
04:08 MCI main line arrived.
Planned RE from MCI loop line by cancelled tr no:ADB
RE no:31423/DDU
04:20 RE made EOT.
04:38 Train departure from spot
Found in loco no:31442/LGD water leakage from loco roof at carridor and both cabs
Conclusion:
UUO REPORTED IN ASSET AND BULLETIN
Responsibility:
SOUTH CENTRAL RAILWAY
SECUNDERABAD DIVISION
SECUNDERABAD
WHEEL SLIPPINGREPORT 24-05-2025
Date of Incident 24-05-2025 Loco-1/Type/Base: 32990 WAG9 CNB
Incident type WHEEL SLIPPING Loco-2/Type/Base:
Train No NTPG Load 59/59/5255 Gradient RAINY
Section BZA-DKJ Location PPY-DKJ
Detention 30" Punctuality Loss .
Repercussion 20625, 12739, 12578, 20809
Cause of Incident .
Reason Others
Reported to DIVISION
Locomotive Details LP ALP
Loco1 Loco2 Name K.DURGA NARAYANA CH NAGA SURESH
32990 Designation/HQRS LPG/GALA1263 SALP/GALA1675
WAG9 CNB Gradation / Ph No. B/918790992234 -/916309921796
DOB 20-05-1975 15-06-1994
IB DONE 25/03/2025
DOA 11-08-2004 09-03-2021
IC DUE 23/06/2025 ITI
EQ B.Tech
DOP 12-07-2012 29-06-2023
PME DUE 07-06-26 25-07-27
GSR DUE 17-09-2025 05-06-27
TECH DUE - D/E 03-11-25 04-05-27
Last Monitoring Date
LI Name POLURI BALA KRISHNA N.MoshePOLURI BALA K
Chronological order of occurance:
03:31 Train left from PPY L/L
T.No - 6/72 without banker
03:44 LP informed that train stopped at Km No 464/17 due to continuous wheel slip since rain
03:54 Started to back the train after taking P.N No 60 from Dy.SS/PPY
04:14 PPY M/L fouling cleared
Conclusion:
Responsibility:
SOUTH CENTRAL RAILWAY
SECUNDERABAD DIVISION
SECUNDERABAD
REPORT
CARRIAGE AND WA 24-05-2025
Date of Incident 24-05-2025 Loco-1/Type/Base: 30475 WAP7 RPM
Incident type CARRIAGE AND WAGON Loco-2/Type/Base:
Train No 17648 Load . Gradient .
Section PRLI STATION Location PRLI STATION
Detention . Punctuality Loss .
Repercussion .
Cause of Incident .
Reason Others
Reported to DIVISION
Locomotive Details LP ALP
Loco1 Loco2 Name SANDEEP KUMAR SINH .
30475 Designation/HQRS LPG/PRLI1157
WAP7 RPM Gradation / Ph No. C/916309921794
DOB 22-08-1990
IOH DONE 07/04/2025
DOA 10-11-2016
IA DUE 06/07/2025 EQ ITI
DOP 28-10-2023
PME DUE 24-10-28
GSR DUE 26-04-28
TECH DUE - D/E 10-12-25
Last Monitoring Date
LI Name B.RATNA RAJU
Chronological order of occurance:
10:11 17648 Exp arrived on PF-3
10:21 Shunter TOC (due to shunter engaged in 16594)
10:45 While making EOT cab-2 T/S coupling handle struck up
10:48 - 10:58 Later C&W staff attended
11:00 Made EOT
11:09 Train departured from the spot
Conclusion:
Responsibility:
SOUTH CENTRAL RAILWAY
SECUNDERABAD DIVISION
SECUNDERABAD
MAN RUN OVER REPORT 24-05-2025
Date of Incident 24-05-2025 Loco-1/Type/Base: 401006,12,14
Incident type MAN RUN OVER Loco-2/Type/Base:
Train No 47234 Load . Gradient .
Section SNF-SC Location HSJ-SC
Detention . Punctuality Loss .
Repercussion .
Cause of Incident .
Reason Others
Reported to DIVISION
Locomotive Details LP ALP
Loco1 Loco2 Name M.SHIVALKAR .
401006,12,14 Designation/HQRS LPG/SC1742
Gradation / Ph No. A/919346901639
DOB 01-07-1975
DOA 27-06-2000
EQ DME
DOP 06-05-2008
PME DUE 05-04-2025
GSR DUE 02-04-2024
TECH DUE - D/E 25-06-24/01-12-15
Last Monitoring Date
LI Name Sk.Abdullah
Chronological order of occurance:
11:16 Train departured from HSJ
11:20 A male tresspasser runover at Km No 191/14-16
Body struckup under front wheel (left side)
12:28 After RPF & GRP removed the body train left the spot
Conclusion:
Responsibility:
SOUTH CENTRAL RAILWAY
SECUNDERABAD DIVISION
SECUNDERABAD
LOCO TROUBLE REPORT 24-05-2025
Date of Incident 24-05-2025 Loco-1/Type/Base: 37803 WAP7 KJM
Incident type LOCO TROUBLE Loco-2/Type/Base:
Train No 12251 Load 22 Coaches Gradient .
Section KZJ-BPQ Location PTKP
Detention 102" Punctuality Loss
Repercussion NIL
Cause of Incident
Reason LOCO TROUBLE
Reported to DIVISION
Locomotive Details LP ALP
Loco1 Loco2 Name G.HARIBABU NARAYAN DAS
37803 Designation/HQRS LPM/SC1913 SALP/SC2930
WAP7 KJM Gradation / Ph No. A/918790992979 -/918790992593
DOB 10-06-1970 03-04-1995
IA 10-05-2025
DOA 13-05-1996 09-10-2019
IB 27-07-2025 DIPLOMA
EQ DIPLOMA
DOP 22-06-2017 29-06-2019
PME DUE 11-12-25 19-04-2027
GSR DUE 12-09-27 02-09-2025
TECH DUE - D/E 03-11-25 08-02-26/-
Last Monitoring Date
LI Name PEDAPUDI NAGESWAR D.UPENDER
Chronological order of occurance:
14:46 LP informed while approaching PTKP OCR-78 acted cleared section PTKP on coasting
After arrival PTKP checked no abnormality in loco
and resetted the OCR-78. but After 504 node UBA showing zero '0' and message
" Communication Link Fail", tried by CE OFF & ON ,BA OFF /ON but not rectified
Tried by Isolating Bogie I & II but not rectified
Tried from rear cab but not rectified
14:51 RE asked
15:20 RE-32071/BSL PDPL departure
15:55 RE arrived PTKP Loop-line
16:10 EOT
16:20 Ready
16:28 Departure
CE OFF & ON, BA OFF & ON but not rectified.
As per ADEE Shri.Abdin sir instructions 127/126 knobs operated but not rectified
As per KJM shed loco failed.
Conclusion:
UUO REPORTED IN ASSET AND BULLETIN
Responsibility: