0% found this document useful (0 votes)
16 views1 page

Jäœehl G ®KHD¡ FHF Èäbl : Ä F LZ Uój

The document is a payment receipt from TANGEDCO for services rendered, detailing charges totaling 267.00. It includes information such as the CIN and GST numbers, HSN and SAC codes, and states that electrical energy and distribution services are exempt from GST. The payment was processed on 11/03/2025 at 15:15:47.

Uploaded by

Vctw Ece
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views1 page

Jäœehl G ®KHD¡ FHF Èäbl : Ä F LZ Uój

The document is a payment receipt from TANGEDCO for services rendered, detailing charges totaling 267.00. It includes information such as the CIN and GST numbers, HSN and SAC codes, and states that electrical energy and distribution services are exempt from GST. The payment was processed on 11/03/2025 at 15:15:47.

Uploaded by

Vctw Ece
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

jäœehL g»®khd¡ fHf« èäbl£

(Ïizajstê ä‹ f£lz« Kiw)


ä‹ f£lz« uÓJ

bga® : N.ARUMUGAN & SUBRAMANIYAN


ä‹. Ï. v©: 05407033655 f£lz Kiw : TANGEDCO PAYMENT PORTAL
ÏuÓJ v© : PGCCAN724647148 ehŸ : 11/03/2025 15:15:47

t.v© f£lz« étu« bjhif (%.)


1 23100-CC Charges 136.00
2 62250-BPSC 1.02
3 61902-R.C Charges** 130.00
4 62948-Rounding Off -0.02
bkh¤j« 267.00
bjhif (vG¤jhš) %. Two hundred Sixty Seven only

Ïju étu§fŸ :
1.TANGEDCO CIN No. : U40109TN2009SGC073746 * ÏJ fââæš cUth¡f¥g£l Mtz«

2.TANGEDCO GST No. : 33AADCT4784E1ZC jå x¥òif njitæšiy

3.HSN CODE : 27160000 * ÏJ t§» x¤ÂirΡF c£g£lJ

4.SAC CODE : 996912


5.ELECTRICAL ENERGY & DISTRIBUTION
SERVICES ARE EXEMPTED UNDER GST

You might also like