Bill
Bill
kiosk payment
RESIDENTIAL
MR.ASHISH LALJI GADA BILL DATE METER STATUS CYCLE NUMBER TYPE OF SUPPLY
DHAKU SHETH CHL CEASER RD LAXMAN SAWANT 03-May-2025 Active 14 SINGLE PHASE
ROAD AMBOLIPADA ANDHERI (WEST) MUMBAI
400058 TARIFF CONNECTION DATE SANCTIONED LOAD (kW) BILL NUMBER
Mobile : 98********62 LT I (B) Prior to Aug-2011 1.19 101266530417
Email :
BILL DISTRIBUTION NO. BILLING STATUS PRESENT READING DATE PREVIOUS READING DATE
PAN :
Andheri/Andheri/ Regular 30-Apr-2025 01-Apr-2025
GST : 14/102/016/016/002
"This bill for power supply cannot be treated or utilised as proof that the premises for which the power supply has been granted is an authorised structure nor
CA NO:150887200 Bill Month Units Consumed Current Month Bill Net Other Charges Previous Outstanding
ID
Apr-25 263 r2797.32 r31.75 r4147.25
r6970.00 A
NP
Bill Period: 02-Apr-2025 - 30-Apr-2025 Previous Units : 249
U
LL
Due Date: 24-May-2025
l
Round sum payable by discount date 10-May-2025: Amt r6950.00 Discount r23.52
Round sum payable after due date 24-May-2025 : Amt r7010.00 DPC r34.97 B I
previous balance is payable immediately
CONSUMPTION TREND Current year Previous year MAJOR BILL COMPONENTS (Rounded off amt)
308 PPCA 0
NET OTHER 31
231
FIXED 135
WHEELING 770
77
ENERGY 1,446
249
302
259
263
243
262
104
307
166
149
233
165
163
193
219
153
152
213
175
117
64
83
61
71
Whatsapp Us on : 9594519122
For power interruption complaint or restoration status
1. Missed Call on 9594519122 from your Registered Mobile No
2. SMS POWER <9 digit account no.> to 9594519122" from your
Registered Mobile No
Join us on:
IMPORTANT MESSAGE
l New Tariff rates are effective from 01.04.2025,as per MERC order dated 28.03.2025 in Case No. 211 of
2024.
l As per Honorable MERC approval dated 15 January 2025,Fuel adjustment charge(FAC) is being levied in
current month. For any query, kindly connect at our Toll free number:19122 or visit
https://www.adanielectricity.com/faqs for details.
l Please note that all important communication related to your account are being sent on 98******62
registered with us. In case of any change, do inform us immediately to avoid any inconvenience and
enjoy our uninterrupted services
l Tentative meter reading date for your MAY-25 bill is 30/05/2025
l In view of MERC order in case no. 325 of 2019, cash payment limit towards electricity bills is fixed at
Rs.5,000/- per account per month. For payment of amount greater than Rs.5,000 please use
convenient digital channels / online / cheque modes
1-1
CONSOLIDATED STAMP DUTY PAID BY ORDER NO. LOA/ENF-2/CSD/09/2025 Validity Period Dt. 17/01/2025 to Dt. 31/03/2026 / OW 292 DT. 17 /01/2025, GRN NO MH013961974202425E, DT D1/A1/B1/S1/R1 E.&O.E.
HOW YOUR BILL WAS CALCULATED
f. Adjustments 0.00 Address: Adani Electricity, Devidas Lane, Off SVP Road, Near Devidas
(B) Net other charges in current bill (Sum of a to f) 31.75 Lane Telephone Exchange, Borivali West, Mumbai 400 103
Your security deposit (SD) with us r 438.73 Address: Adani Corporate House, Shantigram, Near Vaishno Devi Circle,
S. G. Highway, Khodiyar Ahmedabad, Gujarat, India-382421
Your unpaid security deposit (SD) r 1940.00
CIN: U74999GJ2008PLC107256
PAN: AADCD0086F
As per Electricity Supply Code, you can also opt for your own meter (adhering to BIS standars)
GSTIN: 27AADCD0086F1ZW
YOUR TARIFF STRUCTURE (EFFECTIVE FROM 01.04.2025 ) r
0 - 100 90.00 3.45 2.93 0.00 l For digital mode of payment, get discount of 0.25% of the monthly bill
(excluding taxes and duties), subject to a cap of Rs.500
101 - 300 135.00 6.70 2.93 0.00
l Power thefts are not just a loss to us but a loss to the society.
301 - 500 135.00 8.10 2.93 0.00 "Be a responsible citizen, to report theft, call on 19122". Kindly note
that theft of electricity in any manner attracts penal action
>500 160.00 9.05 2.93 0.00
under the Electricity Act, 2003
Above fixed charges are for single phase connections. Fixed charge of Rs.160 per month will be levied on residential l As per MERC, Interest on Security Deposit is at the bank rate declared
consumers availing 3 phase supply. Additional Fixed Charge of Rs. 250 per 10 kW load or part thereof above 10kW
load shall be payable.,Temporary supply consumers shall pay 1.5 times the Fixed Charges applicable for this category. by RBI as on 1st April of the financial year. For FY 2025-26. it is 6.50%
l Electricity Duty as per Govt. of Maharashtra Notification No. ELD.
Bill Days Base Days Total Units 1st Slab 2nd Slab 3rd Slab 4th Slab
2016/CR[1]252/Energy-1 of 21.10-2016 ELD-2020/CR-34/Energy-1 of
29 30 263 97 166 0 0
14.08.2020. Tax on Sale of Electricity as per Govt. of Maharashtra
Notification No. VVK-2018/CR[1]161/Energy-1 of 26-12-2018.
ADVANCE PAYMENT DETAILS (r) ADJUSTMENT/TCS DETAILS (r) l As per order dated 28.03.2025 in Case No. 211 of 2024,
Fuel Adjustment Charge (FAC) has been renamed to Power Purchase
Opening Balance Adjustments Closing Balance Discount Cost Adjustment (PPCA)
l For Cheque payments: Date of realization of cheque or 3 days from submission of cheque (whichever is earlier) shall be deemed to be the date of receipt of payment (subject to realization)
l cheque should be Account payee of local clearing and not post-dated l Mention A/C no and respective amount on back of cheque while making multiple bill payments by
single cheque
l Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.150887200