The document outlines the general notes and requirements for fire safety compliance in a construction project, emphasizing adherence to the Fire Code of the Philippines and relevant regulations. It specifies the responsibilities of the contractor, including securing permits and using approved materials and equipment. Additionally, it details operational sequences for fire safety systems, including alarms and sprinkler installations, in accordance with NFPA standards.

Uploaded by

lagmanadrian13
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views1 page

2 Unit M-1

The document outlines the general notes and requirements for fire safety compliance in a construction project, emphasizing adherence to the Fire Code of the Philippines and relevant regulations. It specifies the responsibilities of the contractor, including securing permits and using approved materials and equipment. Additionally, it details operational sequences for fire safety systems, including alarms and sprinkler installations, in accordance with NFPA standards.

Uploaded by

lagmanadrian13
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES:

1. ALL WORKS HEREIN SHALL COMPLY WITH THE LATEST PROVISION OF THE LATEST
EDITION OF THE FIRE CODE OF THE PHILIPPINES AND REGULATIONS WITH THE RULES
AND REGULATIONS OF THE NATIONAL AND LOCAL AUTHORITIES CONCERNED IN THE 30.00 MTS. 30.00 MTS.
ENFORCEMENT OF THE FIRE CODE LAW.
2. ALL WORK SHALL BE DONE UNDER THE IMMEDIATE SUPERVISION OF THE DULY QUALIFIED 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
AND COMPETENT MECHANICAL ENGINEER.
3. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE NEW UL/FM & NFPA APPROVED
FEP FEP
TYPE FOR LOCATION AND PURPOSES.
4. THE FIRE EXTINGUISHER SHALL BE FOR ALL PURPOSED FIRE USE AS MANUFACTURED BY
COMPETENT SUPPLIER. UL/FM APPROVED.

6.67
S S S S S S S S S S
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL GOVERNMENT AND MICC CABLE
DC CLIP
LOCAL CONSTRUCTION PERMITS AND ALL REQUIRED FEES. MICC GLAND
6. ALL PIPES ARE IN MILLIMETERS AND ALL DIMENSION ARE IN METERS UNLESS OTHERWISE PVC SHROUD
SPECIFIED. TERMINATION BOX
OPENING WITH SLEEVES
7. ALL EQUIPMENTS, FIRE PUMP AND ACCESSORIES SHALL BE UL/FM AND NFPA 20

6.67
APPROVED. S S S S S S S S S S
FIRE ALARM PANEL
8. COORDINATE THE DRAWINGS WITH OTHER RELATED DRAWINGS AND SPECIFICATION. THE
ENGINEER SHALL BE NOTIFIED IMMEDIATELY ANY DISCREPANCIES FOUND HEREIN.
9. WORKMANSHIP. THE WORK THROUGHOUT SHALL BE EXECUTED IN THE BEST AND MOST
THROUGH MANNER KNOW TO TRADE AND TO THE SATISFACTION OF THE OWNER OR G.I SHEET COVER
ENGINEER IN CHARGE.

6.67
ELECTRICAL CABLE S S S S S S S S S S
NOTES: CABLE SUPPORT

40.00 MTS.
1. EACH CHECK MARK ( √ ) CORRESPOND TO AN ANNUNCIATOR LIGHT IN THE BUILDING FIRE
ALARM CONTROL PANEL (FACP)
2. SENSORS. FLOW SWITCHES LOW WATER LEVEL SENSORS, SUPERVISORY SWITCHES, FOR
ZONE ACTIVATION SHALL BE INCLUDED IN THE CONTRACT WIRING FROM THESE DEVICES PVC DUCT

6.67
S S S S S S S S S S
TO THE SPRINKLER ANNUNCIATOR PANEL SHALL BE DONE BY ELECTRICAL CONTRACTOR
COORDINATE INSTALLATION WITH THR AFFECTIVE TRADE CONTRACTOR.
3. OPENING OF THE SPRINKLER HEAD OR INSPECTION TEST VALUE SHALL CAUSE THE
OPERATION OF THE FLOW SWITCH WHICH SHALL ACTIVATE THE ANNUNCIATOR LIGHT FOR
THE SPRINKLER ZONE INVOLVED AND SHALL CAUSE THE OPERATION OF THE BUILDING
FIRE ALARM (FIRE ALARM CONDITION)

6.67
S S S S S S S S S S
4. CLOSING OF THE NORMALLY OPEN SUPERVISED VALVED OF THE SPRINKLER SYSTEM
SHALL CAUSE THE SUPERVISORY SWITCH TO OPERATE A TROUBLE ALARM IN THE 2L 1.5 FP 200 CABLE
BUILDING FIRE ALARM SYSTEM (TROUBLE ALARM CONDITION) FROM ALL LOOPS.

5. FIRE PUMP RUNNING CONDITION OF THE FIRE PUMP CONTROL PANEL SHALL CAUSE THE
OPERATION OF THE BUILDING FIRE ALARM SYSTEM (FIRE ALARM CONDITION)
SLAB.

FACP

FACP
6.67
6. ACTIVATION OF THE LOW WATER LEVEL SWITCH IN THE STORAGE TANK SHALL CAUSE A S S S S S S S S S S
TROUBLE ALARM CONDITION IN THE SYSTEM.
7. INSTALLATION OF THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH THE NFPA 13 FAB MCP MCP FAB
STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEM.
8. INSTALLATION OF FIRE PUMP SHALL BE IN ACCORDANCE WITH NFPA 20 STANDARD FOR FACP PANEL.
INSTALLATION OF FIRE PUMPS.
9. INSTALLATION OF FIRE PUMP SHALL BE IN ACCORDANCE WITH THE NFPA 20 406 HOSE
VALVES SHALL BE PRESSURE REDUCING TYPE OR SHALL BE PROVIDED WITH PRESSURE WALL.
TYPICAL
RESISTING DISC.
FIRE DETECTION AND ALARM SYSTEM LAYOUT
SCALE 1:200MTS
10. NON-COMBUSTIBLE CEILING SHALL BE USED. THIS CEILING WILL BE USED IN THIS F.F.L
PROJECT NOTIFY THE CONSULTANT IF SOME TENANTS WILL BE COMBUSTIBLE CEILINGS
WILL BE ALLOWED. SURFACE TYPE
SEQUENCE OPERATION: 25mm GI. CONDUIT BOX FIXED TO
SOFFIT WITH BRASS SCREWS AND
CONCRETE SLAB

1. WHEN THE SYSTEM PRESSURE AT THE MAIN DISCHARGE OF LINE DECREASE DUE TO RAWL PLUG
LEAKAGES IN THE PIPING SYSTEM, THE JOCKEY PUMP(JP-1) WILL AUTOMATICALLY START
TO MAINTAIN THE PRESSURE IN THE SYSTEM IN ACCORDANCE WITH THE FOLLOWING SET
POINTS.
PLATE BOX PIPE CONNECTOR
1.1. CUT - IN 90 PSI TYPICAL INSTALLATION OF FIRE OCTAGONAL - 100 MM IRON FLEXIBLE
1.2. CUT - OUT 120 PSI
2. A FURTHER DECREASE IN THE SYSTEM PRESSURE DUE TO THE ACTIVATION OF ONE OR ALARM CONTROL PANEL MICC/PVC CABLE
SCALE 1:50MTS COMPRESSION GLAND SUSPENDED CEILING
MORE SPRINKLER HEADS FIRE HOSE CABINET WILL CAUSE THE FIRE PUMP (FP-1) TO
GLAND SHROUD
START AUTOMATICALLY IN ACCORDANCE WITH THE FOLLOWING SET POINTS FLEXIBLE IRON PIPE
DETECTOR BASE WITH PVC SHEATH
2.1. CUT - IN 60 PSI MICC/PVC CABLE FIXED
DETECTOR TO SLAB BY ONE HOLE SMOKE DETECTOR
2.2. CUT -OUT MANUAL PVC COVERED CLIP 1"x6"
BRASS R/HD SCREW
3. AN ELECTRICALLY OPERATED AUDIBLE ALARM SHALL BE ACTIVATED WHEN ANY OF THE & PLASTIC PLUG

FOLLOWING CONDITIONS EXIST. AUTOMATICALLY IN ACCORDANCE WITH THE FOLLOWING


SET POINTS.
3.1. FIRE PUMP IS RUNNING SMOKE DETECTOR DETAILS TYPICAL INSTALLATION OF SMOKE DETECTOR
SCALE NTS SCALE NTS
3.2. FIRE PUMP CONTROLLER MAIN SWITCH IS DEACTIVATED OR MANUAL POSITION
3.3. POWER FAILURE
3.4. LOW WATER LEVEL IN THE STORAGE TANK

MECHANICAL ENGINEER: PROJECT TITLE: OWNER: SHEET CONTENTS REVISIONS PROJECT NO. SHEET NO.
MECHANICAL GENERAL NOTES
SMOKE DETECTOR DETAILS
FIRE ALARM DETAILS
PROPOSED 2 UNITS WAREHOUSE PHILIPPINE BAISHITONG FDAS LAYOUT
INCORPORATED LEGENDS M-1 M-2
REG. NO.: PTR: CHECKED BY:
LOCATION: F. VIOLA HIWAY, BRGY. MARONQUILLO, SAN RAFAEL, BULACAN SIGNATURE:
VALIDITY: PLACE ISSUED: FDAS