JFA BINA GEMILANG SDN BHD
METHOD STATEMENT FOR PAINTING WORKS
 Doc. No.:JFA-MS-ST-02         Revision No. : 00   Date issued :01.08.2011   Page 1 of 3
1.0      PURPOSE
         The purpose is to define and establish the method for painting works
2.0      SCOPE
         To provide clear instruction for construction of all painting.
3.0      REFERENCES
         Contract’s Specification
4.0      DEFINITION
         - Nil -
5.0      RESPONSIBILITIES
         5.1       Project Manager
                          Ensure that method statement comply with client’s requirements.
                          Ensure method statement is agreed and accepted by consultant
      submitted.
                       Monitor implementation of this method statement and ensure the works are
                        carried out in accordance to the respective specification.
                       Co-ordination of testing with Consultant.
7.0      SAFETY CONDITIONS
         Refer to Safety Manual.
8.0      ACTIVITY PROCESS FOR PAINTING WORKS
DELIVERY, STORAGE AND HANDLING
     a) Deliver the material in manufacturer’s original packing with label indicating
        information for identifying the item
     b) Material will be stored in a tightly covered container in well ventilated area
SURFACE PREPARATION
    1. Cementitious Materials:
           i.    General: Prepare surface to be painted. Remove efflorescence, chalk,
                 dust, dirt, grease, oils, and release agents. Roughen as required to
                 remove glaze
                         JFA BINA GEMILANG SDN BHD
                  METHOD STATEMENT FOR PAINTING WORKS
 Doc. No.:JFA-MS-ST-02       Revision No. : 00   Date issued :01.08.2011     Page 2 of 3
                 ii.     Determine moisture content of surface by performing appropriate test.
                         Do not paint surface where moisture content exceeds that permitted in
                         manufacturer's printed directions
                 iii.    Clean shutter oil from concrete surface by using Sigma Paint cleaner/ \
                         Degreaser, a sample will be carried out for approval purpose.
       2. Metal Material :
                    i.  Touch up bare area and shop applied prime coats that have been
                        damaged. Wire brush, clean with solvents recommended by the
                        paint manufacturer, and touch up with the same primer as the shop
                        coat
                   ii.  Clean non-galvanized ferrous metal surface mechanically by using
                        cup wire brush or sand blasting to remove foreign substances
                        before priming
                  iii.  Galzanised metal: clean galvanized surface to ensure that surface
                        is free of oil and surface contaminants.
MATERIAL PREPARATION : carefully mix and prepare paint materials in accordance with
manufacturer’s direction.
                  i.  Maintain container used in mixing and application of paint in a clean
                      condition, free of foreign material and residue
                 ii.  Stir material before application to produce a mixture of uniform density ,
                      stir as required during application. Do not stir surface film into material.
                      Remove film and if necessary, strain material before using
                iii.  Use only thinners approved by the paint manufacture, and only within
                      recommendated limits
REMOVE HARDWARE, HARDWARE ACCESSORIES, LIGHTING FIXTURES, etc. THAT ARE NOT TO BE
PAINTED OR PROVIDE SURFACE APPLIED PROTECTION AS REQUIRED
INSTALLATION
   A. GENERAL: Installation system in accordance with manufacturer’s instructions,
      submittals, applicable industry standard
      Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions
      detrimental to formation of a durable paint film
   B. COATINGS
      GENERAL
          a) Minimum coating thickness: Apply material at not less than the manufacturer’s
             recommended spreading rate. Provide a total dry film thickness of the entire
             system as recommended by the manufacture
          b) First coat will be applied to surface that have been cleared, pretreated, or
             otherwise prepared for painting
          c) Apply paint to even and fine texture. Leave no evidence of rolling such as laps,
             irregularity in texture, skid marks, or other surface imperfections
                        JFA BINA GEMILANG SDN BHD
                METHOD STATEMENT FOR PAINTING WORKS
Doc. No.:JFA-MS-ST-02     Revision No. : 00   Date issued :01.08.2011    Page 3 of 3
          d) Do not apply succeeding coats until the previous coat has cured
          e) Sand between applications where sanding is required to produce an even
             smooth surface
          f) Apply additional coat where undercoats stains or other conditions show in final
             coats
      PRIME COATS
         a) In case of non-primed material, apply prime coat
         b) Recoat primed and sealed surface where evidence of suction sport, unsealed
            areas appears other defect due to insufficient sealing
      FINISH COATS
         a) Provide finish coats that area compatible with primers
         b) Pigmented finishes. Completely cover to provide smooth surface of uniform
            finish, colour, appearance and coverage
      PAINTING
         a) Match approved sample for colour, fixture and coverage. Remove finish or
            prepaint work not in compliance with requirements
         b) External coating around permanent or built in fixtures, convector colour, covers
            for finned tube radiation, grilles and similar component to maintain system
            integrity and provide desired protection
         c) Paint colour, surface treatment, and finishes are indicated in finishing schedule
         d) Paint surfaces behind moveable equipment and furniture same as similar
            exposed surface
         e) Paint surfaces behind permanently fixed equipment or furniture with prime coat
            only before final installation of equipment
         f) Paint interior surfaces of ducts and other items, where visible through registers
            or grilles, with a flat, nonspecular black paint
         g) Match approved sample for colour, texture and coverage
         h) Paint back side of access panels and removable of hinged covers to match
            exposed surface
      CLEANING
        a) At the end for each work day, remove unused materials, debris and containers
           from the project site
        b) Upon completion of painting, clean glass and paint spattered surface. Remove
           spattered paint by washing and scraping, using care not to scratch or damage
           adjacent finished surfaces
        c) Protect work of other trades, whether to be painted or not, against damage by
           painting. Correct damage by cleaning, repairing or replacing and repainting