0% found this document useful (0 votes)
26 views18 pages

Annexure - 7 (Sp.19)

The document contains various formats for conducting inventory and condition surveys for bridges, culverts, roads, and pavements. It includes detailed sections for recording structural details, condition assessments, and recommendations for repairs or rehabilitation. Additionally, it provides formats for traffic volume counts, origin-destination surveys, and speed and delay studies.

Uploaded by

durgaprasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views18 pages

Annexure - 7 (Sp.19)

The document contains various formats for conducting inventory and condition surveys for bridges, culverts, roads, and pavements. It includes detailed sections for recording structural details, condition assessments, and recommendations for repairs or rehabilitation. Additionally, it provides formats for traffic volume counts, origin-destination surveys, and speed and delay studies.

Uploaded by

durgaprasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Sl. No.

Structure No.
Name of River Bridge
Chainage (Km) Project Name:
Skew/Normal
Type
Span Arrangement
Total Length of Bridge (C/C Exp Joints)(m)
Flow Direction

Width of Bridge (Inner to Inner Face of


Railing of Parapet) (m)

Total Width (Outer to Outer Face of Slab)


(m)

Type
Super
Structure

Condition
Type
Crash
Barrier

Condition
Railing/
Parapet/

Type

Condition
Bearings

Type
Joints

Condition
Expansion

Type
Inventory and Condition Survey for Bridges
SURVEY AND INVESTIGATIONS FORMATS

Height from GL (m)

Condition
FORMAT FOR INVENTORY AND CONDITION SURVEY OF BRIDGES

Type

Condition
Substructure Foundation

Type
Size
Return/

Condition
Wing Walls

Bed Protection
Observations
Repair/Rehabilitation Measures
Remarks
General Condition
Recommendations
Stru No.

Project Name:

Location (Km)

Type

Span Arrangement

Length (m)

Total width (O/O


Parapet) (m)

Horizontal Vent
width(m)

Opening Height (m)

Slab Thickness (m)


Structure Details

Abutment details

Road Level from


Bed (m)

Flow direction

Details
Inventory and Condition Survey for Culverts

Wing Wall/
Return Wall

Condition
FORMAT FOR INVENTORY AND CONDITION SURVEY OF SLAB/BOX CULVERTS

Pitching

Details
Parapet

Condition

Bed Protection

Remarks

Repair/Rehabilitation
measures

Observations

General Condition

Recommendation
SI. No.

Structure No
Project Name:

Chainage (Km)

Type

Size (m)

Total Width (Outer


to Outer
Parapet/Head wall)
(m)

Flow direction

Road Level from


Bed level (m)

Head Wall Type

Length (m)

Thickness
Head Wall

Length (m)
Thickness (m)
Parapet

Height (m)

Bed Protection &


Revetment works

General Condition
FORMAT FOR INVENTORY AND CONDITION SURVEY OF HUME PIPE CULVERTS

and Observation

Remarks

Repair/
Rehabilitation
measures

Recommendations
FORMAT FOR ROAD AND PAVEMENT CONDITION SURVEY
Project Name:
Carriageway (Single/Dual) Lanes 2 3 4 N/A Side (Left/Right)
Stretch (Km) Pavement Condition Embankment Condition Drainage Condition

Cracking Edge
Rut
Ravelling fretting Pot hole General Slope Height Connectivity Stagnation Culvert
From To Narrow Wide Depth Failures
% (length in (%) Condition Erosion (m) E/NE/D E/NE E/D
Type (<3mm) (>3mm) (mm)
m)
% %
FORMAT FOR ROAD CONDITION SURVEY
Project Name:
Carriageway (Single/Dual) LANES 2 3 4 N/A Side (Left/Right)
Stretch (km) Paved Shoulder Condition Earthen Shoulder Condition
Cracking
Narrow Wide Edge fretting Pot hole Rut Depth Edge Drop Material Loss/
From To Cracking Raveling Condition
(<3mm) (>3mm) (length in m) (%) (mm) (cm) Corrugations
Type %
% %
FORMAT FOR ROAD AND PAVEMENT INVENTORY
Date: Name of the Road: Direction: Weather:

Earthwork Type Carriage way Width


Chainage (km) Land Use Shoulder Road Side Drain
C/L/F (m) Width of
Surfacing Soil Type
Terrain Median Left Right LHS RHS
Type & Colour
From To Left Right Left Right LHS RHS (m) Width Width
Type Type Type Condition Type Condition
(m) (m)
FORMAT FOR CLASSIFIED VOLUME COUNT SURVEY OF PASSENGER TRAFFIC (1 HR.-15 MINS SLOTS)
Name of the Road: Direction: Survey Day:
Location: Date of Survey: Day:
PASSENGER TRAFFIC NON- MOTORISED TRAFFIC
Time Bus
Tata
Period 2W 3W Car/Jeep Car (Y.B) RTC Private Mini School Cycle Animal
Magic Cycle
Bus Bus Bus Bus Rickshaw Drawn

Sub Total

Sub Total

Sub Total

Sub Total
Grand
Total
FORMAT FOR CLASSIFIED VOLUME COUNT SURVEY OF GOODS TRAFFIC (1 HR-15 MINS. SLOTS)
Name of the Road: Direction: Survey Day:
Location: Date of Survey: Day:
GOODS TRAFFIC GOVT EXEMPTED
TRUCKS
Time Tractor
Heavy/ Tempo/ Mini LCV 3W
Period Multi Tractor with Cars Mini Bus Trucks
2 Axle 3 Axle Earth LCV (Tata ACE) Goods
Axle Trailer
Moving

Sub Total

Sub Total

Sub Total

Sub Total
Grand
Total
FORMAT FOR PASSENGER ORIGIN DESTINATION SURVEY ROADSIDE INTERVIEW
Name of Road: Direction: Towards Date of Survey:
Location: Survey Day: Day:
Origin Destination
Vehicle Vehicle Distance
S. No. Town/ District/ Town/ District/ Purpose Frequency
Type No. (Km)
Locality State Locality State
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Vehicle Type Purpose Frequency


1. Car 1. Work 6. Recreation 1. Daily - D
2. Bus 2. Education 7. Health 2. Weekly - W
3. Mini Bus 3. Business 8. Returns 3. Monthly - M
4. Tata Magic 4. Social 9.0thers 4. Yearly - Y
5.Shopping
FORMAT FOR GOODS ORIGIN DESTINATION SURVEY ROADSIDE INTERVIEW
Name of Road: Direction: Towards Day of Survey:
Location: Day: Sheet No.
Origin Destination
National
Vehicle Vehicle Commodity Distance
S. No. Town/ District/ Town/ District/ Frequency Permit
Type No. Type (Km)
Locality State Locality State (Yes/No)

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Vehicle Type Frequency


(1) LCV 1. Daily - D
(2) 2 Axle Truck 2. Weekly -W
(3) 3 Axle Truck 3. Monthly - M
(4) MAV 4. Yearly - Y
FORMAT FOR PASSENGER ORIGIN DESTINATION SURVEY - NUMBER PLATE SURVEY
Name of Road: Direction: Towards Day of Survey:
Location: Date of Survey: Page No.
Passenger Vehicles
S. No Time Car Car(Yellow Board) RTC Bus & PVT Bus Mini Bus TATA MAGIC Passenger
State No State No State No State No State No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
FORMAT FOR GOODS ORIGIN DESTINATION SURVEY - NUMBER PLATE SURVEY
Name of Road: Direction: Towards Survey Day:
Location: Day of Survey: Page No.
Goods Vehicle
S. No. Time 2 Axle Truck 3 Axle Truck LCV M Axle Mini LCV
State No State No State No State No State No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
SPEED AND DELAY STUDY FORM NO.1

FORM FOR RECORDING THE TIME AT VARIOUS CONTROL POINTS


Name of Road __________________________ From ___________ To _________________
From Km: _______________________________ To Km __________ No. of Trip _________

Date: ______________
Time: _____________

First Stop Watch Second Stop Watch


Distance
Control Journey Time Delay Time Cause of
SI. No.
Points Delay
Km M.
Min. Sec Min. Sec

Name and Signature _____________________ Name and Signature _____________________

of Enumerators __________________________ of Supervisors ___________________________


SPEED AND DELAY STUDY FORM NO.2

FORM FOR NO. OF VEHICLES OVERTAKING THE TEST VEHICLES


Name of Road ______________________________ From ___________ To ________________
From Km: ___________________________________ To Km __________ No. of Trip _______

Date: ____________
Time: ___________

FAST MOVING VEHICLES


Passenger Vehicles Goods Vehicles
Car/Jeep/Auto Tempo/ Trucks
Two Wheeler Mini Bus
New Old Bus LCV 2 Axle Multi Axle

Name and Signature ____________________ Name and Signature ___________________

of Enumerators _________________________ of Supervisors _________________________


SPEED AND DELAY STUDY FORM NO.3

FORM FOR NO. OF VEHICLES OVERTAKEN BY THE TEST VEHICLES


Name of Road _______________________________ From ___________ To ___________
From Km: ___________________________________ To Km __________ No. of Trip _______

Date: ____________
Time: ___________

FAST MOVING VEHICLES


Passenger Vehicles Goods Vehicles
Car/Jeep/Auto Two Trucks
Mini Bus
New Old Wheeler Bus Tempo/LCV 2 Axle Multi Axle

Name and Signature ____________________ Name and Signature ___________________

of Enumerators _________________________ of Supervisors _________________________


SPEED AND DELAY STUDY FORM NO. 4

FORM FOR NO. OF VEHICLES TRAVELLING IN THE OPPOSITE DIRECTION


Name of Road __________________________ From ___________ To _______________
From Km: _______________________________ To Km __________ No. of Trip _______

Date: ____________
Time: ___________

FAST MOVING VEHICLES

Passenger Vehicles Goods Vehicles


Car/Jeep/Auto Trucks
Two
Mini Bus Bus Tempo/ Multi
New Old Wheeler
LCV 2 Axle Axle

Name and Signature ____________________ Name and Signature ___________________

of Enumerators _________________________ of Supervisors _________________________


AXLE LOAD SURVEY

Section:
Location:
Direction:

Date & Time: ________________


Weather: ____________________

FAST MOVING VEHICLES

Axle Load (Tonnes)


Vehicle Commodity
Time Origin Destination 1st Axle 2nd Axle 3rd Axle 4th Axle 5th Axle 6th Axle Remarks
Type Type

Name and Signature ________________________________ Name and Signature _____________________________

of Enumerators _____________________________________ of Supervisors ___________________________________


ROUGHNESS MEASUREMENTS USING BUMP INTEGRATOR

Direction 1 Direction 2
Road
Condition
Road Condition
Wheel UI Bump Wheel (Type of UI Mean Value
Chainage Bump (Type of Surface
Revolution cm/km Reading Revolution Surface cm/km (A+B)/2
Km Reading BR Thickness,
WR A BR WR Thickness, B cm/km
Drainage, etc.)
Drainage
etc.)

You might also like