0% found this document useful (0 votes)
99 views6 pages

IPC Format

IPC Format

Uploaded by

ubed.ullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
99 views6 pages

IPC Format

IPC Format

Uploaded by

ubed.ullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Page 2 of 7

Client / Owner : Pakistan Defence Officers Housing Authority, Karachi. LOA Date : DD:MM:YYYY
Consultant : MM Pakistan (Pvt) Ltd. Time For Completion: XX Months
Contractor : XYZ Pvt Limited Date of Completion: DD:MM:YYYY
Name of
: ABC DHAC City (Package - XX) Contract Amount: XXX,XXX,XXX,XXX
Project
CA - No. : XXX

Retention Money Clause


Interim Payment Certificate (IPC) No: XX

RECOVERY OF RETENTION MONEY BOND

Recovery

Total Workdone of 05% Retention Money Total Retention Money Page


Sr. No. IPC No. Balance Retention Remarks
this IPC of Cumulative work Recovered due till this No
Money
done of this IPC IPC
(Rs.)
(Rs.) (Rs.)

05% RETENTION As Per CA Amount

Recoveries

1 001

Bal Retention -

QS (CONTRACTOR) QS (CONSULTANT)
Submitted by: Deductions Checked Verified by:
Page 3 of 7
Client / Owner : Pakistan Defence Officers Housing Authority, Karachi. LOA Date : DD:MM:YYYY
Consultant : MM Pakistan (Pvt) Ltd. Time For Completion: XX Months
Contractor : XYZ Pvt Limited Date of Completion: DD:MM:YYYY
Name of Project : ABC DHAC City (Package - XX) Contract Amount: XXX,XXX,XXX,XXX
CA - No. : XXX

Interim Payment Certificate (IPC) No: XX


RECOVERY OF MOBILIZATION ADVANCE

Recovery
Recovery of Mobilization Balance
Total Workdone Mobilization Advance Mobilization
Sr. No. IPC No. Remarks Page No
of this IPC Advance on Recovered till this Advance to be
Cumulative work of IPC Recovered
this IPC (Rs.)
MAX 15% MOBILIZATION ADVANCE
Recoveries
1 001

Bal Mobilization Adv -

Q.S.(Contractor) Q.S.(Consultant)
(Submitted By) Deductions (Submitted By)
Page 4 of 7

Client / Owner : Pakistan Defence Officers Housing Authority, Karachi. LOA Date : DD:MM:YYYY
Consultant : MM Pakistan (Pvt) Ltd. Time For Completion: XX Months
Contractor : XYZ Pvt Limited Date of Completion: DD:MM:YYYY
Name of Project : ABC DHAC City (Package - XX) Contract Amount: XXX,XXX,XXX,XXX
CA - No. : XXX Interim Payment Certificate (IPC) No: XX
MAIN SUMMARY

Workdone upto last Workdone of this Page


Bill No. Description Contract Amount Total workdone IPC %age
IPC IPC No.

1 ROAD WORKS - -

2 SEWERGE SYSTEM - -

3 WATER SUPPLY SYSTEM - -

4 SPECIAL STRUCTURES - -

EMPLOYER / ENGINEER'S
5 - -
FACILITIES

TOTAL COST - - - -

Q.S.(Contractor) Q.S.(Consultant)
(Submitted By) (Submitted By)
Page 5 of 7

Client / Owner : Pakistan Defence Officers Housing Authority, Karachi. LOA Date : DD:MM:YYYY
Consultant : MM Pakistan (Pvt) Ltd. Time For Completion: XX Months
Contractor : XYZ Pvt Limited Date of Completion: DD:MM:YYYY
Name of Project : ABC DHAC City (Package - XX) Contract Amount: XXX,XXX,XXX,XXX
CA - No. : XXX Interim Payment Certificate (IPC) No: XX
GENERAL SUMMARY ROAD NETWORK

Workdone upto last


Contract Amount Workdone of this IPC Total workdone IPC Page
Bill No. Description IPC %age
Rs. Rs. Rs. No,
Rs.

1 Road Network

1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.8

1.9

TOTAL (ROAD NETWORK) - - - -

Q.S.(Contractor) Q.S.(Consultant)
(Submitted By) (Submitted By)
Page 6 of 7

Client / Owner : Pakistan Defence Officers Housing Authority, Karachi. LOA Date : DD:MM:YYYY
Consultant : MM Pakistan (Pvt) Ltd. Time For Completion: XX Months
Contractor : XYZ Pvt Limited Date of Completion: DD:MM:YYYY
Name of Project : ABC DHAC City (Package - XX) Contract Amount: XXX,XXX,XXX,XXX
CA - No. : XXX Interim Payment Certificate (IPC) No: XX
ABSTRACT SHEET ROAD NETWORK

A - Road & Streets

As per CA/ BOQ last Paid This Bill To Date


BOQ Ref: / Page
Particulars Unit Remarks %age
Sr. No. Rate Amount Amount Amount Amount #
Quantity Quantity Quantity Quantity
(Rs) (Rs) (Rs.) (Rs.) (Rs.)

8,888,888.00 9,999,999,999

Total Amount = - 9,999,999,999 (9,999,999,999) -

QS(CONTRACTOR) QS(CONSULTANT)
Submitted by Checked Certified By
Page 7 of 7

Client / Owner : Pakistan Defence Officers Housing Authority, Karachi. LOA Date : DD:MM:YYYY
Consultant : MM Pakistan (Pvt) Ltd. Time For Completion: XX Months
Contractor : XYZ Pvt Limited Date of Completion: DD:MM:YYYY
Name of Project : ABC DHAC City (Package - XX) Contract Amount: XXX,XXX,XXX,XXX
CA - No. : XXX Interim Payment Certificate (IPC) No: XX
MEASUREMENT SHEET
BOQ Ref: No

Name of Item

Inspection Length Width Height Quantity


Description No IPC Remarks
Request No
(Ft) (Ft) (Ft) Rft or Sft or Cft

Total Quantity = 0.000


Last Paid Quantity = -
This IPC Quantity = 0.000

Q.S.(CONTRACTOR) QS(CONSULTANT)
(Submitted By) Checked Certified By