WPR 18

work pr 2

Uploaded by

nizam.papan1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Bumiraya Setia Sdn. Bhd.

(831391-W)
B8-2-3, Lorong Selangor, Pusat Bandar Melawati, 53100 Kuala Lumpur. Tel : 03-4162 7800/7900 Fax : 03-4162 7600 Mobile : 012-639 5484

WEEKLY PROGRESS REPORT


Project Title : Project Code : M219@25 / M228@25 Week No. : (2) 12/05/2025 - 18/05/2025
Retro Highland / Segambut
Project Start : Project End : Status as of :

Client : OVERALL STATUS SUMMARY - Physical (%)


Mitrajaya / Geoworks
Schedule : Actual on site : Ahead (+) / Delay (-) : Days

Weather Pipe Laying Works Status - Opencut / Pipe Jacking


No. Description of works / Location Contract (m) Complete (m) Percentage (%) In Progress

AM PM AM PM AM PM AM PM AM PM AM PM AM PM
Equipments / Machineries Remarks / Forecast

Date Date
Microtunnelling Machine Dump Truck
Manshield Equipment Backhoe
Excavator Welding Set
Excavator (Clamp Shell/ Long Arm) Air Compressor & Breaker
Mobile Crane/ Crawler Crane Spotlight / Floodlight
Vibro Hammer Machine Grouting /Concrete Pump
Generator Set Others
Water Pump Others

Progress on Site Team : Jacking / Pit / Manshield / Manhole / CCTV / Safety / others : _______________________________ Comments
EMP. NO. M580
MUHAMMAD
NAME
FELNIZAM
POSITION SSS
Time Time Time Time Time Time Time Time Time Time Time Time Time Time
DATE OT OT OT OT OT OT OT Work Description
(IN) (OUT) (IN) (OUT) (IN) (OUT) (IN) (OUT) (IN) (OUT) (IN) (OUT) (IN) (OUT)

12/05/25 0830 1700 - -Carry out workplace inspection. -Monitor manshield pipe jacking setting, hot work, hacking, lifting, etc. -Ensure compliance of PPE at jobsite at Geoworks, Segambut.

13/05/25 0830 1700 - -Apply daily confined space PTW. -Apply weekly excavation and hotwork PTW. -Carry out workplace inspection. -Monitor manshield pipe jacking, hot work, hacking, lifting, etc. -Ensure compliance of PPE at jobsite.

14/05/25 0830 1700 - -Apply daily confined space PTW. -Carry out workplace inspection. -Monitor manshield pipe jacking, hot work, hacking, lifting, etc. -Ensure compliance of PPE at jobsite.

15/05/25 0830 1700 - -Apply daily confined space PTW. -Monitor manshield pipe jacking, hot work, hacking, lifting, etc. -Ensure compliance of PPE at jobsite. -Attend Transportation SHC meeting at Melawati Office.

16/05/25 0830 1700 - -Apply daily confined space PTW. -Carry out workplace inspection. -Monitor manshield pipe jacking, lifting, hot work, hacking, etc. -Ensure compliance of PPE at jobsite.
-Apply daily confined space PTW. -Carry out workplace inspection. -Carry out machinery inspection, equipment inspection, fire extinguisher inspection, and oxy-acetylene set inspection. -Monitor manshield pipe jacking,
17/05/25 0830 1700 - lifting, hot work, hackling, etc.. -Ensure compliance of PPE at jobsite.
18/05/25 - - - -Public Holiday (Sunday)

TOTAL WD 6 DAYS Prepared by Verified by Approved by

TOTAL OT -
TOTAL SUN -
- FELNIZAM MUHAMMAD AZIM LIM CHEE SENG
TOTAL PH

-Apply daily confined space PTW. -Monitor manshield pipe jacking, lifting, hot work, hacking, etc. -Ensure compliance of PPE at jobsite.