Internal Quality Audits: ISO Procedure

Uploaded by

anrhlavin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views4 pages

Internal Quality Audits: ISO Procedure

Uploaded by

anrhlavin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Company Name Internal Quality Audits

Division or Address Doc. No. Rev. No.


Division or Address Date: - Page 1 of x

ISO Procedure
Internal Quality Audits

Approved: __________________________________________________
title Name

Approved: ___________________________________________________
title Name

Approved: __________________________________________________
title Name

Approved: __________________________________________________
title Name

Approved: __________________________________________________
title Name

Change Record

Rev Date Responsible Description of Change


Person

A Name Initial Release

Distribution List

(list the departments that receive controlled copies)

Controlled Copy, Do Not Duplicate For Internal Use Only


Company Name Internal Quality Audits
Division or Address Doc. No. Rev. No.
Division or Address Date: - Page 2 of x

1. Purpose

• To ensure that the procedures in Quality Manual are being followed.

• To determine the effectiveness of the procedures in controlling the


quality of <COMPANY>’s products

• To identify the need to modify any of the above procedures.

2. Scope

All areas described in the ISO 9000 procedures, policies, and work instructions
affecting the quality of work are audited.

3. Responsibilities

<Job title>:

• initiates the audits and ensures they are conducted in an efficient manner.

• delegates the authority to carry out specific audits in accordance with this
procedure.

<Team> comprised <departments> are responsible for forming an internal audit


team to audit ISO 9000 compliance.

The cognizant area Manager responds to audit findings and corrective actions.

4. Procedure

4.1 The Audit Team

The audit team is composed of representatives from the following


departments: <departments>.

<Job title> selects auditors for the audits defined.

Auditors are selected from a function not directly involved in the audit.
Auditors have sufficient seniority in the company to reflect the
importance of the audit.

4.2 Training

Auditors are trained in auditing techniques and attend <training>. <Job


title> maintains <training record> in <location> for <length of time>.

Auditors are provided with auditing guidelines for completing the audit.

Controlled Copy, Do Not Duplicate For Internal Use Only


Company Name Internal Quality Audits
Division or Address Doc. No. Rev. No.
Division or Address Date: - Page 3 of x

4.3 Audit Plan

Initially ISO 9000 procedures are audited <frequency>. This frequency is


adjusted for <activities>. The maximum interval between audits is
<interval>.

<Job title> creates the audit schedule. The audit schedule defines:

• <attribute>

• <attribute>

• <attribute>

• <attribute>

4.4 Carry Out Audit

Departments are notified of an upcoming audit by <notification>.

<Job title> briefs auditors on procedures and audit scope prior to the
audit. Auditors study the procedures prior to the audit.

During the audit, auditors ensure that procedures are being followed and
record their findings onto <name of report>.

<Job title> reviews the audit findings. Audit findings are reviewed with
the staff responsible for the procedures audited.

4.5 Corrective Action

Upon review of the audit, if an audit finding is legitimate, the corrective


action system is followed.

<Job title> has the final say in cases where the legitimacy of an audit
finding cannot be resolved.

<Job title> completes the <name of form> to initiate the corrective


action. The <name of form> is stored in <location> for <length of time>.

<Job title> verifies successful implementation of the corrective action.


The corrective action must be completed within <timeframe>.

Follow-up audits by <job title> within <timeframe> verify that the


corrective actions are being maintained.

4.6 Closing an Audit

Controlled Copy, Do Not Duplicate For Internal Use Only


Company Name Internal Quality Audits
Division or Address Doc. No. Rev. No.
Division or Address Date: - Page 4 of x

Audits are closed upon <criteria>.

<Job title> prepares a final audit report. <Job title> approves the final
audit report prior to distribution. The final audit report is distributed to
<name of departments>.

To close the audit, <job title> prepares <name of report>.

<Job title> maintains an audit history file that includes <items>.

<Job title> maintains an audit log stored <location>. The audit log
includes <items>.

4.7 Review and Evaluation

<Team, departments, job title> reviews audit results for <criteria>.

5. Related Documentation

<Audit Plan>
<Audit report>
<Audit Log>

Management Responsibility
Corrective and Preventive Action
Quality Records

<list work instructions>

Controlled Copy, Do Not Duplicate For Internal Use Only

You might also like