0% found this document useful (0 votes)
11 views1 page

3 Flooring Layout - Level 2

Uploaded by

lihixe5828
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

3 Flooring Layout - Level 2

Uploaded by

lihixe5828
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Plant 13 Annex, Near Godrej One,

Pirojshanagar, Vikhroli East,


Mumbai, Maharashtra - 400079

CLIENT : Godrej Interio

PMC : GODREJ INTERIO - INTERIORS

ARCH / CONSULTANT :
GODREJ INTERIO - INTERIORS
DESIGN TEAM

PROJECT NAME :

6360
2_02
Rungta Sons Pvt. Ltd.
17320
Terrace_accessible
110 m² Chaibasa, Jharkhand

500
Second Floor
500

ST

2_01
Open space office
389 m²
Flooring Layout

GENERAL NOTES :

Flooring Schedule

Michel Angelo FF01


Natural Stone

Mitshubishi Grey FF02

12900
Natural Stone

Rosso Lavante -
Red Natural Stone

Vinyl Textile FF03b


37060
500mm X 500mm

Wood Paraquet FF06


150 x 2200 mm

500
500

ST

Anti Skid Tile FF04


2400 x 1200 mm

1360
2_27 Cool Tile
600X 600mm
Distribution 2_05 ST
153 m² Distribution 2_06

1680

1580
3 m² WC Chamber
4 m² Access Floor
1750

1830
1870
ST 2710

ST ST Granite Floor - Mid-landing


2700 1870 2400

1200
DB Shutter

1460
Ladies Toi. Granite Floor - Tread
1970
13 14 15 16 17 18 19 20 21 22 23 24
1540

HUB ROOM Granite Floor - Riser


2_25 ST
2030 13 14 15 16 17 18 19 20 21 22 23 24 Granite Floor - Skirting
Emergency stairs 1760 2700

8610
21 m² 2330
1750
12 11 10 9 8 7 6 5 4 3 2 1 2_22
Emergency exit 2_30

3060
12 11 10 9 8 7 6 5 4 3 2 1
11 m² Stair LobbyUP
23 m² G.Toilet
1_33
ST
cleaning room
2550 3 m² ST ST
6550
2090

2_26 2_21 2_04


1 2 3 4 5 6 7 8 9 10 11 12
Technical
3050

Print Room Elevator Lobby 0 29-11-2024 Flooring Layout

1660
15 m² 8 m² 27 m²
2_32 Lounge 33 m² 2_08 Rev Date Description
1650 4380
Emergency stairs
ST 21 m²
ST 24 23 22 21 20 19 18 17 16 15 14 13
11700

3340 3320 3330 2270 Project No :


2_19 2_09
7650

Cabin Pantry Drawing No :


1160 GB/03/FLR LAY

3480
2_20 8 m²
3230

3230

3230

11 m² ST
Storage 2_28
Phone Project Stage : EXECUTION
2380

7 m² Open space office 3610


Booth 2430
22 m²
5030

2_17 2_18 Cabin Drawn By : SAYALI


Chamber ST 11 m² ST ST ST DB Shutter
18 m² Checked By : DEOYANI
2_11
1700

1680
Open space office
81 m² DISCLAIMER :

7080
ST
The drawings are the copyright works of Godrej & Boyce Mfg. Co. Ltd. Godrej
ST ST ST ST ST 2_12 & Boyce Mfg. Co. Ltd. reserves all rights whatsoever in the drawings. Godrej
2_15 2_14 12 m² 2_13 12 m² & Boyce Mfg. Co. Ltd. asserts its right over the drawings that has been
12 m² Cabin
Cabin 12 m² conceived by the client of its efforts and also views reproduction of the
Cabin Cabin
4880 3300 3300 3300 3300 18460 drawings, as is or by making cosmetic and other changes, as a violation of its
copyright.
No part of the drawings shall be copied or reproduced without the written
3450
3350

3350

3350

3350

3350

approval of Godrej & Boyce Mfg. Co. ltd.


On site accuracy ±5mm.
Non-confirmity with any information should be immediately reported. In case
Chamber of any discripancy in the drawing, please contact the chief architect
2_16 18 m² immediately.

Date : 29/11/2024 Flooring Layout


Scale : NTS
Second Floor

North : Revision No.

R0