0% found this document useful (0 votes)
60 views17 pages

Low Cost 2 Bed Roomed House

Notes

Uploaded by

everrson zvoushe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views17 pages

Low Cost 2 Bed Roomed House

Notes

Uploaded by

everrson zvoushe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

SUMMARY OF BILL OF QUANTITIES

CONSTRUCTION OF 2 BEDROOMED HOUSES FOR THE MINISTRY OF WATER AND HUMAN SETTLEMENT

BILL SERIES DESCRIPTION CONTRACT PREVIOUS CURRENT VALUE OF % CLAIMED


AMOUNT (USD) AMOUNTS (USD) AMOUNT(USD) WORKS (TO DATE)
1 Preliminary works 150 150 150 0%

2 Concreting 1341 1341 1341 0%

3 Brickworks 988 988 988 0%

4 Backfilling and Compaction 150 150 150 0%

5 Carpentry works 1317 1317 1317 0%

6 Plastering and Tiling 559 559 559 0%

7 Plumbing 340 340 340 0%

8 Electricals 340 340 340 0%

9 Painting 458 458 458 0%


10 Doors and Windows 696 696 696 0%

SUBTOTAL BILL ITEMS 6339,00 7353,24 7353,24 0%


ADD 16% VAT 1014,24
TOTAL CONTRACT SUM 7353,24
BILL OF QUANTITIES
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT
Date: 08/06/2025

EARTH WORKS (PROVISIONAL) 150


Site clearance, setting out, trenching

Clear the whole area, remove all rubbish, debris, vegetation and
shrubs not exceeding 200mm girth
Surplus material from excavations and/or stock piles on site to a dumping site to
be located by the contractor
BILL OF QUANTITIES
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT
Date: 08/06/2025

FOOTING
Description Unit Qty Unit Cost
¾ stones m 3
12 28
Cement 42.5R bags 12 12
Riversand m3 5 18
Termite poison litres 10 3
SUBTOTAL

SLAB CASTING
Concrete grade M15 (1:2:4)
Thickness of plastic membrane to be 200 microns
Cement 42.5R bags 18 12
Riversand m 3
6 18
¾ stones m3 5 28
Black plastic or plastic membrane rolls 1 50
SUBTOTAL

RING BEAM CASTING


Concrete mixing grade M15 (1:2:4)
Cement 42.5R bags 12 12
Riversand m3 1.5 18
¾ stones m3 2 28
SUBTOTAL

STEEL REINFORCEMENTS
Stirrups should be spaced 250mm from c/c
Design of ring beam as directed by Engineer on site

6m length Y16 deformed bars length 37 7


180 x 180 Y10 links ea 200 0.75
Tying wire kg 5 2
SUBTOTAL
Total Unit Cost
336
144
90
30
600

216
108
140
50
514

144
27
56
227

259
150
10
419
BILL OF QUANTITIES
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT
Date:08/06/2025

BRICKWORK
Description Unit Qty Unit Cost Total Unit Cost
Mortar mixing ratio 1:6
Hollow core block (390x190x190) each 2200 0.3 660
Pitsand m3
5 12 60
Cement 42.5R bags 15 12 180
Galvanised Hoop irons strips 10 0.5 5
115mm brickforce rolls 10 3 30
Impermo (waterproofing agent) kg 15 3 45
115mm damp proof course rolls 2 4 8
SUB TOTAL 988
BILL OF QUANTITIES
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT

BACKFILLING AND COMPACTION 150

All soil poisoning and insecticide to be applied under a ten year guarantee by an approved firm of specialist
Compaction density to be controlled using DCP apparatus to a maximum of 30mm/blow 93% MOD AASHTO compaction is to
Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
Earth filling obtained from the excavations and/or precribed stock piles on site compacted to 93% Mod AASHTO density
ASHTO compaction is to be achieved

AASHTO density
BILL OF QUANTITIES
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT
Date /08/06/2025

ROOFING
Description Unit Qty Unit Cost
114x38x6m length 25 9
76x38x6m length 21 7
3.6m AC fascia boards length 7 12
single truss hangers no 20 0.5
4 inch wire nails kg 8 3.5
IBR sheets (3.6 x 0.75m) no 27 12
safetop nails kg 4 6
Ac corner jointers no 8 1
Ac straight jointers no 5 1
2.4m rolltop ridges no 10 10
Steel cutting disc no 1 5
1 inch clout nails kg 1 3
SUBTOTAL

CEILING INSTALLATION
3.6m x 1200mm x 6.4mm Gyproc rhino-boards no 14 11
38 x38 x 6m timber length 30 3.5
1 inch concrete nails kg 1 4
fibre tap rolls 5 3
skimlite bags 5 12
4 x 35 mm drywall screws box 2 8
SUBTOTAL
Total unit cost
225
147
84
10
28
324
24
8
5
100
5
3
963

154
105
4
15
60
16
354
BILL OF QUANTITIES
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT
Date /08/06/2025

PLASTERING
Description Unit Qty Unit Cost Total Unit Cost
12mm plaster thickness outside and 20mm inside
Cement bags 8 12 96
Pitsand m3 7 12 91
airboxes pairs 7 1 7
SUBTOTAL 194

TILING
400x400 porcerlain tile boxes 29 9 261
Porcelain adhesive bags 40 2 80
Light grey grout bags 5 2 10
12 mm edge strips length 4 3 12
2mm Tile spacers packets 1 2 2
SUBTOTAL 365
BILL OF QUANTITIES
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT
Date /08/06/2025

PLUMBING
Description Unit Qty Unit Cost Total Unit Cost
sink mixer tap no 1 20 20
Shower cubicle no 1 100 100
Basin mixer tap no 1 20 20
threaded seal tap no 2 0.5 1
110mm pvc underground sewer pipe no 2 13 26
110mm x 45 deg pvc rodding eye no 1 4 4
110mm x 45 deg pvc bend no 1 4 4
110mm pvc ie T no 1 4 4
110mm pvc two way vent valve no 1 3 3
110mm x 135 deg pvc Y junction no 1 4 4
110mm pvc gully hooper head no 1 4 4
110mm pvc gully P trap no 1 5 5
110mm pvc proplastic inspection pipe no 1 5 5
500ml pvc prodorite solvent cement no 1 5 5
50mm pvc waste pipe no 1 10 10
Double bowl kitchen sink no 1 35 35
Wash hand basin no 1 25 25
chasing combs no 5 1 5
Fusion bolts / Basin bolts no 4 1 4
12mm masonry drill bit no 3 5 15
50mm PVC plain elbow no 1 1 1
complete close couple toilet suite no 1 40 40
SUBTOTAL 340
BILL OF QUANTITIES
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT

Date /08/06/2025
ELECTRICAL
Description Unit Qty unit Cost Total Unit cost
8 way distribution box no 1 10 10
19mm pvc conduits no 15 1.5 45
19mm pvc coupling no 20 0.1 2
19mm pvc nipples no 20 0.1 2
20mm steel saddles no 15 0.1 1.5
solvent cement no 1 8 8
clout nails kg 1 3 3
6 pvc flush boxes no 8 1.5 22.5
3 inch pvc flush boxes no 6 2 12
pvc round boxes no 4 0.4 10
4 x 30mm chipboard screws box 1 10 10
230 PS40 masonry disc no 1 5 5
chasing combs no 3 0.5 5
6mm single core red cable m 5 2 10
6mm single core black cable m 5 2 10
4mm earthwire m 5 2 10
2.5mm single core cable red m 50 19 19
2.5mm single core cable black m 50 19 19
2.5mm single core cable earth m 50 19 19
1.5mm single core cable red m 50 17.5 17.5
1.5mm single core cable black m 50 17.5 17.5
1.5mm single core earth wire m 50 17.5 17.5
13 Amp double sockets outlets no 3 4 12
15amp double socket outlets no 1 4 4
1 gang 2 way switches no 5 1.5 11
2 gang 2 way switches no 3 1.5 4.5
30amp single pole mcb no 1 3.5 3.5
20amp single pole mcb no 1 4 4
5amp single pole mcb no 2 3.5 7
6 inch spherical fittings no 4 5 15
Insulation tape red no 2 0.5 1.5
Insulation tape black no 2 0.5 1.5
SUBTOTAL 339.5
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT

Date /08/06/2025
PAINTING
NB. Wall paints can be shop tinted or on site tinted to suit client’s preferred colours
All walls quoted on 2 PVA coats of paint

Interior walls (PVA washable finish)


Description Unit Qty Unit Cost Total Unit Cost
PVA white satin sheen washable paint 20litre 1 60 60
Pinkwood primer paint 20litres 1 35 35
Universal undercoat paint 20litre 1 50 50
High gloss white paint 5litres 1 35 35
Turpentine 5litres 1 12 12
Ceiling white 20litres 1 40 40
Mutton cloth roll kg 1 5 5
Crack filler kg 1 4 4
40 gauge sandpaper sheets sheets 1 4 4
Metal primer green paint litres 1 18 18
Hand brushes
100mm no 2 4 8
75mm no 2 4 8
50mm no 2 4 8
30mm no 2 4 8
hamilton rollers no 4 4 16
extension poles no 1 2 2
SUBTOTAL 313

Exterior walls

PVA white super acrylic paint 20litre 1 50 50


universal undercoat paint 5litres 1 20 20
high gloss white paint 5litres 1 35 35
PVA roof and stoep black 20litres 1 40 40
SUBTOTAL 145
BILL OF QUANTITIES
Project Name:BOTSWANA HOUSING DEVELOPMENT PROJECT
Client Name: MINISTRY OF WATER & HUMAN SETTLEMENT
Date /08/06/2025

ALUMINIUM IMITATION WINDOWS


Description Unit Qty Unit cost Total Unit cost
4mm clear Float on all windows

1500x1200 ea 6 60 360
900 x 600 ea 1 45 45
115mm door frames ea 4 25.00 100.00
Inside doors ea 3 27.00 81.00
External door ea 1 50.00 50.00
3 lever union lockset with cylinder ea 6 10.00 60.00
TOTAL 696