The document outlines detailed structural plans and designs for various components of a raw mill facility, including plant layouts, foundation details, and elevation drawings. It includes specifications for materials, levels, and reinforcement details for structures such as columns, beams, and silos. Each section provides comprehensive information necessary for construction and engineering purposes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views3 pages

Civil Dhar

The document outlines detailed structural plans and designs for various components of a raw mill facility, including plant layouts, foundation details, and elevation drawings. It includes specifications for materials, levels, and reinforcement details for structures such as columns, beams, and silos. Each section provides comprehensive information necessary for construction and engineering purposes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Sl.

No Name of Structure Description


1 PLANT LAYOUT PLANT LAYOUT FOR LINE-2
LAYOUT AND DETAIL OF LIME STONE STACKER FOUNDATION
2 LS STACKER RECLAIMER PLAN AT +0.345M LVL
WALL ELEVATION DETAILS AND SECTION
LAYOUT OF EXCAVATION
COLUMN AND FOUNDATION PLAN AT EL.(-)4.990M LVL.(B.O.C.)
RCC DESIGN AND DETAILS OF COLUMN AND FOUNDATION
AT EL.(-)4.990M LVL.(B.O.C.)
LAYOUT OF PLINTH BEAMS AT EL.(-)0.200M LVL.(T.O.C.)
RCC DESIGN AND DETAILS OF PLINTH BEAMS AT EL.(-)0.200M LVL.(T.O.C.)
RCC DETAIL OF COLUMN IN ELEVATION
RCC DETAIL OF COLUMN IN ELEVATION
LAYOUT OF FLOOR BEAMS AND SLAB AT +5.00M LVL
GA OF INSERT PLATE
3 RAW MILL HOPPER RCC DETAIL AT FLOOR BEAM AT +5.00M LVL
RCC DETAIL AT FLOOR BEAM AT +5.00M LVL
LYOUT OF FLOOR BEAM SLAB IP AND OPENING AT +8.00M LVL (CANCELLED)
RCC DET OF FLOOR BEAMS AT +8.00M LVL (CANCELLED)
RCC DET OF FLOOR BEAMS AT +8.00M LVL (CANCELLED)
LAYOUT OF FLOOR BEAMS IP AND OPENING AT +8.00M LVL
RCC DETAILS OF FLOOR BEAMS AT +8.00M LVL
RCC DETAILS OF FLOOR BEAMS AT +8.00M LVL
LAYOUT OF FLOOR BEAMS, INSERT PLATE &
OPENING AT EL. (+)15.800M.LVL (TOC)
LAYOUT OF FLOOR BEAM, INSERT PLATE & OPENING AT EL.+17.400M LVL. TOC
LAYOUT OF EXCAVATION
LAYOUT OF EXCAVATION
FOUNDATION PLAN AT EL.(-)5.000M LVL.(B.O.C.)
RCC DESIGN AND DETAIL OF FOUNDATION
PLAN AND RCC DESIGN FOR COLUMN AND FOUNDATION AT EL. (-) 6.050 M LVL. (B.O.C.) (U.N.O.)
PLAN AT +0.400M. LVL. FOR FOUNDATION
REINFORCEMENT DETAITS FOR FOUNDATION
LAYOUT AND RCC DETAIL OF PLINTH BEAM AT -0.200M LVL
4 RAW MILL BUILDING RCC DETAIL OF COLUMN IN ELEVATION
RCC DETAILS OF COLUMN IN ELEVATION
LAYOUT AND DETAIL OF FLOOR BEAM SLAB IPAND OPENING AT +8.00M LVL
RCC DESIGN AND DETAIL OF FLOOR BEAM AND SLAB AT +8.00M LVL
GENERAL ARRANGEMENT OF INSRT PLATE
LAYOUT AND RCC DET OF FLOOR BEAMS SLAB IP AND OPENING AT +11.400M LVL
RC DET AND FLOOR BEAMS AT +11.400M LVL
PLAN AND RCC DET OF PIT FOR BUCKET ELEVATOR 362BE1
LAYOUT AND DETAILS OF FLOOR BEAMS, SLAB, INSERT PLATE & OPENING AT EL.(+)14.500 M LVL. (T.O.C.)
COLUMN AND FOUNDATION PLAN AT EL. (-) 6.050M LVL. (B.O.C.)
RCC DESIGN AND DETAILS OF COLUMN AND FOUNDATION ATEL. (-) 6.050M LVL. (B.O.C.)
RCC DETAIL OF COLUMN IN ELEVATION SHEET 1 OF 4
RCC DETAIL OF COLUMN IN ELEVATION SHEET 2 OF 4
LYOUT AND RC DETAIL OF PLINTH BEAM AT -0.200M LVL
RCC DESIGN AND DETAIL FOR PLINTH BEAM AT -0.200 LVL
RCC DETAIL OF COLUMN IN ELEVATION SHEET 3 OF 4
RCC DETAIL OF COLUMN IN ELEVATION SHEET 4 OF 4
GENERAL ARRANGEMENT OF INSERT PLATE
5 RAW MILL CYCLONE BUILDING
PLAN AND RC DETAIL OF FOUNDATION OF RM FAN 362FN1 AT -2.00M LVL
RCC DET OF FOUNDATION FOR RAW MILL FAN AT -2.00M LVL
PLAN AND RC DETIL OF FOUNDATION FOR DA FAN 422FN 3 AT -1.500M LVL
PLAN AND RCC DETAIL OF FOUNDATION FOR DUCT SUPPORT 362DU4- 6.050M LVL AND PEDESTAL FOR DUCT SUPPORT
422DU2 AND WATER TANK +0.00M LVL
LAYOUT AND RC DET OF FLOOR BEAMS SLAB IP AND OPENING AT +6.00M LVL
LAYOUT OF FLOOR BEAMS AND INSERT PLAT AT +9.00M LVL
FOUNDATION PLAN AND RCC DETAILS AT PLAN - 6.050 M LVL
LAYOUT AND RCC DETAILS OF FLOOR BEAMS, SLAB, INSERT PLATE & OPENING AT EL.(+)15.000 M LVL. (T.O.C.)
EXCAVATION PLAN
LAYOUT FOUNDATION AND COLUMN
FOUNDATION AND COLUMN DETAILS
LAYOYT AND RCC DETAIL OF PLINTH BEAM
6 RAW MILL BAG HOUSE RCC DETAILS OF PLINTH BEAM
RCC DETAILS OF PLINTH BEAM
LAYOUT OF CABLE TRANCH AND DETAILS
RCC PLAN AND DETAILS OF RAW MILL BAG HOUSE FAN FOUNDATION 422FN1
RCC PLAN AND DETAILS OF RAW MILL BAG HOUSE FAN FOUNDATION 422FN2
GENERAL ARRANGEMENT OF FOUNDATION LAYOUT AND CROSS SECTION WITH REINFORCEMENT DETAILS
LAYOUT AND RCC DETAILS OF OPENING IN SILO WALL AND CONE
RCC DETAILS OF OPENINGS IN SILO WALL AND CONE
RCC DETAILS OF SILO WALL AND CONE
LAYOUT AND RCC DETAILS OF OPENINGS IN SILO WALL AND CONE INSERT PLATE
7 BLENDING SILO
P.C.C PROFILE ABOVE RING BEAM AT EL+13.048M LVL
DETAILS OF PRESTRESSED CABLES IN THE SILO WALL ABOVE +10.162M. LVL
DETAILS OF PRESTRESSED RIBS & DEFLECTED CABLE PROFILE AROUND MANHOLE
UNFOLDED VIEW OF OPENINGS & INSERT PLATES (OUTER SIDE)
UNFOLDED VIEW OF OPENINGS & INSERT PLATES (INNER SIDE)
8 RAW MILL CYCLONE BUILDING
9 RAW MILL FEED BUILDING
10 RABH (RAW MILL BAG HOUSE)
HOT DUST BIN
EXCAVATION PLAN
FOUNDATION PLAN
REINFORCEMENT DETAILS OF FOUNDATIONS FOR F1, F2 & F3
REINFORCEMENT DETAILS OF FOUNDATIONS FOR F4, F5 & F6
REINFORCEMENT DETAILS OF FOUNDATIONS FOR F7, F8 & F9
REINFORCEMENT DETAILS OF COLUMN & FOUNDATION FOR C1, C2, C3, C4,C5 & C6 AND FOUNDATION DETAIL OF F10
PLAN & RCC DETAILS OF PASSENGER LIFT
RCC DETAILS OF COLUMN ELEVATION C1 ON GRID A-4 AND MIRROR ON GRID B-4
REINFORCEMENT DETAILS OF COLUMN ELEVATION C2 ON GRID A-3 AND MIRROR ON GRID A-2
RCC DETAILS OF COLUMN ELEVATION C2 ON GRID B-3 AND MIRROR ON GRID B-2
RCC DETAILS OF COLUMN ELEVATION C3 ON GRID A-1 AND MIRROR ON GRID B-1 AND DETAIL OF COLUMN ELEVATION
C5 AND C6
RCC DETAILS OF COLUMN ELEVATION C4 ON GRID A-1' AND ON GRID B-1'
PART PLAN & RCC DETAILS OF PLINTH BEAM AT (-)0.200M LVL (T.O.C.) (U.N.O.)
RCC DETAILS OF PLINTH BEAM AT (-)0.200M LVL (T.O.C.) (U.N.O.)
PART PLAN & RCC DETAILS OF TIE BEAM AT +4.800M LVL (T.O.C.) (U.N.O.)
RCC DETAILS OF TIE BEAM AT +4.800M LVL (T.O.C.) (U.N.O.)
LAYOUT OF COLUMNS SHOWING IP LOCATION
LAYOUT OF FLOOR BEAM & SLAB AT EL.+11.600M LVL (TOC)
LAYOUT OF PEDESTAL, INSERT PLATE & OPENING AT EL.+11.600M LVL (TOC)
RCC DETAILS OF FLOOR BEAM AT EL.+11.600M LVL (TOC)
RCC DETAILS OF FLOOR BEAM AT EL.+11.600M LVL (TOC)
RCC DETAILS OF FLOOR BEAM AT EL.+11.600M LVL (TOC)
8 PRE HEATER RCC DETAILS OF FLOOR BEAM AT EL.+11.600M LVL (TOC)
RCC DETAILS OF FLOOR BEAM AT EL.+11.600M LVL (TOC)
PLAN FOR IP LOCATION WITH DETAILS AND SECTIONS OF PASSENGER LIFT
PLAN FOR EMERGENCY PLATFORM AND SECTIONS OF PASSENGER LIFT
RCC DETAIL OF FLOOR BEAM AT +11.600M LVL
LAYOUT OF FLOOR BEAM AND SLAB AT +37.800M LVL
LAYOUT OF IP OPENING AND PEDESTAL AT +37.800M LVL
RCC DETAIL OF FLOOR BEAM AT +37.800M LVL
RCC DETAIL OF FLOOR BEAM AT +37.800M LVL
RCC DETAIL OF FLOOR BEAM AT +37.800M LVL
RCC DETAIL OF FLOOR BEAM AT +37.800M LVL
RCC DETAIL OF FLOOR BEAM AT +37.800M LVL
PART PLAN AND RCC DETAIL OF TIE BEAM AT +24.500M LVL
PLAN AND RC DETAIL OF FOUNDATION FOR SUPPORT STRUCTURE OF DOWN COMMER DUCT
LAYOUT OF FLOOR BEAMS AND SLAB AT +63.800M LVL
LAYOUT OF INSERT PLATES , OPENINGS AND PEDESTAL AT +63.800M LVL
RCC DETAILS OF FLOOR BEAMS AT +63.800M LVL
RCC DETAILS OF FLOOR BEAMS AT +63.800M LVL
RCC DETAILS OF FLOOR BEAMS AT +63.800M LVL
RCC DETAILS OF FLOOR BEAMS AT +63.800M LVL
RCC DETAILS OF FLOOR BEAMS AT +63.800M LVL
GENERAL ARRANGEMENT OF FLOOR AT EL+11.600M LVL. & EL.+37.800M LVL. (TOC)
GENERAL ARRANGEMENT OF FLOOR AT EL+63.800M LVL. & EL.+78.800M LVL. (TOC)
GENERAL ARRANGEMENT OF FLOOR AT EL+93.800M LVL. & EL.+108.800M LVL. (TOC)
GENERAL ARRANGEMENT OF FLOOR AT EL+124.500M LVL. & EL.+140.900M LVL. (TOC)
EXCAVATION LAYOUT
FOUNDATION PLAN AND RC DETAIL OF FOOTING
LAYOUT AND MASS CONCRETE BELOW PH FAN
LAYOUT AND RC DETAIL OF PLINTH BEAM AND SECTION
LAYOUT AND DETAIL OF FLOOR BEAM AND SLAB AT +16.00M LVL
9 PHT BOILER RCC DET OF FLOOR BEAM AT +16.00M LVL
LAYOUT OF FLOOR BEAMS SLAB AND IP AT +21.500M LVL
RCC DET OF FLOOR BEAMS AT +21.500M LVL
RCC DET OF FLOOR BEAMS AT +21.500M LVL
RCC DETAILS OF COLUMN ELEVATION OF C1,C2 AND ELEVATION
LAYOUT OF COLUMN SHOWING IP LOCATION
EXCAVATION OF PIER-1, PIER-2 AND PIER-3
GENERAL ARRANGEMENT OF PIER-I, PIER-II AND PIER-III
GENERAL ARRANGEMENT OF PIER-I, PIER-II AND PIER-III
RCC DETAILS OF FOUNDATION LAYOUT & SECTION OF PIER-I, PIER-II AND PIER-III
RCC DETAILS OF FOUNDATION & SECTION OF PIER-I, PIER-II AND PIER-III
RCC DETAILS OF FOUNDATION & SECTION OF PIER-I, PIER-II AND PIER-III
GENERAL ARRANGEMENT & DETAILS OF PIER-III
GENERAL ARRANGEMENT & DETAILS OF PIER-II
10 KILN PIER GA AND DETAIL OF PIER1
SECTION OF PIER1
DETAIL OF PIER1
LAYOUT AND RC DETAILS OF STAIR CASE FOUNDATION FOR PIER-1
LAYOUT AND RC DETAIL OF STUB COLUMN PEDESTAL PLINTH BEAM TIE BEAMS AND GREAD SLAB

LAYOUT AND RC DETAIL OF PEDESTAL AND PLINTH BEAM,TIE BEAM AND GRAD SLAB FOR ROOM AT PIER 2 AND PIER 3
GENERAL ARRANGEMENT OF TAD SUPPORT-I, TAD SUPPORT-II, AND TAD SUPPORT-III
RCC DETAILS OF TAD SUPPORT-I, TAD SUPPORT-II AND TAD SUPPORT-III
EXCAVATION PLAN
FOOTING EXCAVATION SECTION
GA OF TUNNEL FOR COOLER BUILDING
TUNNEL FOR COOLER BUILDING PLAN AT EL.-5.400M T.O.C.
TUNNEL FOR COOLER BUILDING PLAN AT EL.-3.000M, EL.0.0 M T.O.C.
TUNNEL FOR COOLER BUILDING DETAILS AND SECTION
TUNNEL FOR COOLER BUILDING RCC DETAILS AND SECTION
TUNNEL FOR COOLER BUILDING RCC DETAIL AND SECTION
LAYOUT OF FOUNDATION PLAN AT
EL. (-)3.400M AND EL. (-)4.500M LVL. (B.O.C)
RC DETAILS OF COLUMN AND FOUNDATION
RC DETAILS OF COLUMN AND FOUNDATION
RC DETAILS OF COLUMN ELEVATION
RC DETAILS OF COLUMN ELEVATION
RC DETAILS OF COLUMN ELEVATION
RC DETAILS OF COLUMN ELEVATION
LAYOUT OF PLINTH BEAMS
11 COOLER BUILDING RC DETAILS OF PLINTH BEAMS
LAYOUT OF CABLE TRENCH
R.C.DETAILS OF CABLE TUNNEL AND TRENCH
LAYOUT OF COLUMN SHOWING IP LOCATION
COOLER FAN 1 TO 13 KAYOUT OF MASS CONCRITE BELOW CLINKER COOLER FAN
LAYPOUT AND BEAM INSERT PLATE AND PEDESTAL AT +11.00M LVL
RCC DETAIL OF FLOOR BEAM +110.00M LVL
RCC DETAIL OF FLOOR BEAM +110.00M LVL
HYDRAULIC ROOM LAYOUT OF PLINTH BEAM SALB AND RC DETAIL
RCC DETAIL OF FLOOR BEAM +110.00M LVL
LAYOUT OF BEAM INSERT PLATE AND PEDESTAL AT +21.500M LVL
TUNNEL FOR COOLER BUILDING BEAM LAYOUT PLAN AT +0.00M LVL
TUNNEL FOR COOLER BUILDING BEAM LAYOUT PLAN AT +0.00M LVL COOLER FIXING
TUNNEL FOR COOLER BUILDING INSET PLATE PLAN AT -5.400M LVL
TUNNEL FOR COOLER BUILDING SECTION
TUNNEL FOR COOLER BUILDING DETAI AND SECTION
RCC DETAIL OF FLOOR BEAM +21.500M LVL
RCC DETAIL OF FLOOR BEAM +21.500M LVL
EXCAVATION PLAN
LAYOUT OF FOUNDATION AND RC DETAILS
RCC DETAIL OF FOOTING AND PEDESTAL
COOLER ESP FAN LAYOUT OF MASS CONCRITE BELOW ESP FAN
LAYOUT AND RCC DETAIL OF ESP STACK
12 COOLER ESP
LAYOUT OF COLUMN SHOWING IP LOCATION
LAYOUT OF PLINTH BEAM AND RCC DETAILS
RCC DETAIL OF COLUMN ELEVATION
LAYOUT OF FLOOR BEAMS AT +9.500M LVL
RC DETAIL OF PEDESTAL AT +9.500M LVL
LAYOUT FOUNDATION AND RC DETAIL
AQC BOILER
LAYOUT AND RC DETAIL OF PLINTH BEAM
DBC FOUNDATION PLAN AND SECTION DETAILS OF TR1,TR2,TR3
TG BUILDING PLAN AT +0.00M LVL
TG BUILDING PLAN AT +4.00M LVL
13
TG BUILDING PLAN AT +9.500M LVL
TG BUILDING TG BUILDING PLAN AT +15.500M LVL SECTION 1 AND ELEVATION 1
TG BUILDING PLAN AT SECTION 2 AND ELEVATION 3 AND ELEVATION 4
LAYOUT AND DETAIL OF FOUNDATION
DETAIL OF FOUNDATION
FOUNDATION PLAN & SCHEMATIC SECTIONS
Excavation Plan and Sections
FOUNDATION PLAN SECTION & DETAIL OF WALL (CANCELLED)
PLAN AT ±0.000M.LVL. & DETAIL OF RCC TUNNEL (CANCELLED)
SECTIONAL DETAILS OF TUNNEL (CANCELLED)
DETAILS OF PRESTRESSING RIBS ALONG WITH SPECIFICATIONS FOR PRESTRESSING CABLES 12K13
DETAILS OF PRESTRESSED CABLES IN THE SILO WALL ABOVE +4.000M. LVL.
DETAILS OF REINFORCEMENT IN THE SILO WALL ABOVE +4.000M.LVL.
FOUNDATION PLAN, SECTION & DETAILS OF WALL
PLAN & DETAIL OF OPENING IN WALL FOR TUNNEL AT ±0.000M.LVL.
PLAN AT ±0.000M.LVL. & DETAIL OF RCC TUNNEL
SECTIONAL DETAIL OF TUNNEL (SHEET 1 OF 2)
SECTIONAL DETAIL OF TUNNEL (SHEET 2 OF 2)
OPENING & INSERT PLATE LOCATION PLAN AND OPEN OUT VIEW OF INSIDE FOR VERTICAL SHAFT WALL
14 CLINKER SILO EXTRA REINFORCEMENT AROUND DOZER ENTRY OPENING
CABLE ARRANGEMENT DETAILS AROUND DOZER ENTRY OPENING
G.A & RCC DETAILS OF DOZER ENTRY ROOM
PLAN & DETAILS OF BEAMS & SLAB AT +10.550M.LVL. FOR DOZER ENTRY ROOM
PLAN AT ±0.000M.LVL. AND LOCATION, DETAILS FOR INSERT PLATE
LONG SECTIONS FOR INSERT PLATE LOCATIONS IN TUNNELS
PLAN & DETAILS OF CENTRAL SHAFT
PLAN AND DETAILS AT +4.000M.LVL. (CANCELLED)
BEAM & SLAB DETAIL AND PLATE FIXING AROUND OPENING AT +4.000M.LVL. (CANCELLED)
PLAN AND DETAILS AT +4.000M.LVL.
BEAM & SLAB DETAIL AND PLATE FIXING AROUND OPENING AT +4.000M.LVL.
PLAN & DETAILS OF EXTERNAL TUNNELS
LOCATION OF IP PLATE FOR EXTRANAL TUNNEL
FLOOR PLAN AND DETAIL AT +53.00M LVL
OPENING AND OTHER DETAIL AT +53.00M LVL
FOUNDATION PLAN, SECTION & DETAIL OF WALL
PLAN AND DETAILS OF OPENING IN WALL
PLAN & DETAILS OF DECK SLAB AT +10.000M.LVL. AND R.C.C. DETAILS OF SILO WALL
EXTRACTION OPENING PLAN & DETAILS AT +10.000M.LVL.
PLAN SHOWING OPENINGS AND INSERT PLATES IN SILO WALL
15 REJECT SILO OUTSIDE UN-FOLDED VIEW FOR LOCATION OF OPENINGS & INSERT PLATES, DETAILS OF BRACKETS
INSIDE UN-FOLDED VIEW FOR LOCATION OF OPENINGS & INSERT PLATES
GENERAL ARRANGEMENT OF STEEL STAIRCASE
ROOF PLAN AT +20.900M AND OPENING DETAILS
PLAN AT +20.706M LVL & DET OF WALL CUT OUT FOR STEEL GIRDER
FOUNDATION PLAN AND DETAIL EXTERNAL STAIR CASE

17 CEMENT MILL HOPPER BUILDING

18 CEMENT MILL SUBSTAION


EXCAVATION PLAN
FOUNDATION PLAN AND DETAIL
PLAN AND DETAILS OF PLINTH BEAM AT -0.300M LVL
DETAIL OF RCC COLUMN
BEAM FLOOR PLANT AT +1.800M LVLAND DETAILS
FLOOR PLANT AT +5.00M LVL AND OPENING AND IP DETAILS
RCC BEAM DETAIL AT +5.00M LVL
16 CEMENT MILL HOPPER FLOOR PLAN AT +8.400M LVLWITH OPEING AND IP DETAILS
RCC BEAM DETAILS AT +8.400M LVL
COLUMN IP LAYOUT
FOUNDATION PLAN AND DETAILS FOR STAIR CASE
BEAM FLOOR PLAN AT +15.300M LVL AND DETAILS (CANCELLED
BEAM FLOOR PLAN AT +16.200M LVL AND DETAILS
SLAB AND BEAM DETAIL AT 15.300M LVL (CANCELLED)
FLOOR PLAN AT +18.600M LVL WITH OPENING AND IP DETAILS (CANCELLED)
EXCAVATION PLAN FOR MILL
FOUNDATION PLAN & SECTION FOR MILL
REINFORCEMENT DETAILS FOR MILL FOUNDATION
REINFORCEMENT DETAILS FOR MILL FOUNDATION
PLAN AT +0.400M.LVL. FOR MILL FOUNDATION (SHEET 1 OF 3)
PLAN AT +0.400M.LVL. FOR MILL FOUNDATION (SHEET 2 OF 3)
PLAN AT +0.400M.LVL. FOR MILL FOUNDATION (SHEET 3 OF 3)
EXCAVATION PLAN FOR CEMENT MILL REJECT BUILDING
FOUNDATION PLAN FOR CEMENT MILL REJECT BUILDING
PLINTH BEAM PLAN AND DETAILS
PLAN AND SECTION DETAIL OF BUCKET ELEVATOR 563BE1
17 CEMENT MILL BUILDING
DETAIL OF RCC COLUMN
FLOOR PLAN AT +8.00M LVL
RCC BEAM DETAIL AT +8.00M LVL
COLUMN LAYOUT SHOWING IP LOCATION
FLOOR PLAN AT +11.150M LVL (DRG CANCEL)
FLOR PLAN AT +11.150M LVL
RCC BEAM DETAIL AT +11.150M LVL
FLOOR PLAN AT +14.500M LVL
RCC BEAM DETAIL AT +14.500M LVL
FOUNDATION PLAN FOR STAIR CASE
FLOOR PLAN AT +20.00M LVL
EXCAVATION PLAN (CANCELED )
FOUNDATION PLAN FOR CEMENT BAG HOUSE (CANCELED )
PLINTH BEAM PLAN & DETAILS (CANCELED )
EXCAVATION PLAN
FOUNDATION PLAN FOR CEMENT MILL BAG HOUSE
18 CEMENT MILL BAG HOUSE
PLINTH BEAM PLAN DETAILS
DETAILS FOR FAN FOUNDATION (MILL FAN)
PLAN AT +5.00M LVL
COLUMN LAYOUT SHOWING IP LOCATION
FOUNDATION DETAR STACK 563SK1
19 HOT GAS DUCT
20 HAG
21 HOT AIR GENERATOR
EXCAVATION PLAN AND SECTION
SILO PROFILE DETAIL
ARRANGEMENT / LOCATION OF BUCKET ELAVATOR STRUCTURE BULK LOADING AND STAIR CASE
FOUNDATION PLAN SECTION AND DETAIL OF WALL (CANCELLED)
SECTIONS (CANCELLED)
22 CEMENT SILO
PLAN AND DETAIL OF BUCKET ELEVATOR FOUNDATION
PLAN AND DETAIL OF OPENING IN WALL
FOUNDATION PLAN SECTION AND DETAIL OF WALL
REINFORCEMENT ARRANGEMENT PLAN FOR FOUNDATION
SECTION
EXCAVATION PLAN AND SECTION
GENERAL ARRANGEMENT OF STEEL STAIR CASE
PLAN AT +2.400M AND +6.00M LVL
FOUNDATION PLAN, SECTIONS & DETAIL OF WALL
FOUNDATION PLAN, SECTIONS & DETAIL OF WALL
LOCATION OF INSERT PLATE AND OPEING IN WALL INSIDE UNFOLDED VIEW
23 FLY ASH SILO
LOCATION OF INSERT PLATE AND OPEING IN WALL OUTSIDE UNFOLDED VIEW
RAINFORCE DETAIL AROUND IN OPEING IN WALL
LOCATION OF IP DET OF OUTSIDE PLATFORM AT +12.775M LVL
LOCATION OF IP AND OPENING IN WALL OUTSIDE UNFOLDED VIEW
RCC DETAIL OF SILO WALL
FOUNDATION PLAN & DETAILS ETERNAL STAIRCASE
MC ROOM FOR PACKING PLANT PLAN , SECTION AND ELEVATION
SECTION AND ELEVATION
FOUNDATION PLAN LAYOUT AND DETAILS
PLINTH BEAM PLAN AND ITS DETAILS
COLUMN LAYOUT SHOWING INSERT PLATE LOCATION
ELEVATION AND DETAIL OF RCC COLUMN
FLOOR PLAN AND RCC BEAM DETILS AT 3.500M LVL
RCC BEAM DETAILS AT +3.500M LVL
RCC BEAM DETAILS AT +3.500M LVL
24 PACKING PLANT
MCC ROOM PLAN RCC BEAM AND SLAB DETAILS AT +8.500M LVL
MCC ROOM PLAN RCC BEAM DETAILS AT +8.500M LVL
MCC ROOM PLAN RCC BEAM AND SLAB DETAILS AT +12.100M LVL
FOUNDATION PLAN AND ITS RCC DETAIL
DETAIL OF RCC COLUMN
COLUMN IP LAYOUT PLAN
FLOOR PLAN AT +8.500M LVL AND RCC BEAM AND SLAB DETAIL (EXTENSION PART)
FLOOR PLAN AT +8.500M LVL FOR OPENING AND INSEERT PLATE AND BEAM DETAILS (EXTENSION PART)
RCC BEAM DETAIL AT +8.500M LVL (EXTENSION PART)
FOUNDATION PLAN LAYOUT AND DETAILS
DETAIL OF FOUNDATION
ELEVATION AND DETAILS OF RCC COLUMN
25 TRUCK LOADING BLDG-1
COLUMN LAYOUT SHOWING INSERT PLATE LOCATION
FLOOR PLAN AT +5.500M. LVL.
FLOOR PLAN AT +5.500M. LVL. FOR IP AND OPENING DETAILS
TRUCK LOADING BLDG-2 FOUNDATION PLAN LAYOUT & DETAILS
26 CEMENT BULK LOADING FOUNDATION PLAN & DETAILS OF FOOTING
FINE COALBIN BUILDING EXCAVATION PLAN
HOPPER BUILDING EXCAVATION PLAN
GENERAL ARRANGEMENT LAYOUT SECTIONS AND DETAILS
GENERAL ARRANGEMENT LAYOUT SECTIONS AND DETAILS
COAL MILL-REINFORCEMENT DETAILS
COAL MILL-REINFORCEMENT DETAILS
HOPPER BUILDING LAYOUT AND RCC DETAILS OF FOUNDATION AND SECTION

26 COAL GRINDING UNIT (COAL MILL )


Sl.No Name of Structure Description
FINE COAL BIN BUILDING FOUNDATION PLAN AT EL(-) 4.500M B.O.C. LEVEL AND REINFORCEMENT DETAILS OF
FOUNDATION FOR F1 AND F1A
FINE COAL BIN BUILDING REINFORCEMENT DETAILS OF COLUMN AND FOUNDATION FOR F2 TO F6
RCC DETAIL OF COLUMN ELEVATION C1 COLUMN AND SECTION
RCC DETAIL OF COLUMN ELEVATION C1 ,C2COLUMN AND SECTION
FINE COAL BIN BUILDING RCC DETAILS OF COLUMN ELEVATION ON GRID E-1, E-2, E-3, AND SECTION
FINE COAL BIN BUILDING RCC DETAILS OF COLUMN ELEVATION ON GRID E-4, B-1, B-2 AND SECTION
FINE COAL BIN BUILDING RCC DETAILS OF COLUMN ELEVATION ON GRID B-3, B-4, B-5, E-5 AND SECTION
FINE COAL BIN BUILDING RCC DETAILS OF COLUMN ELEVATION ON GRID B-1’,A-1’, AND A-1 TO A-4 AND SECTION
HOPPER BUILDING LAYOUT OF COLUMNS SHOWING IP LOCATION
FINE COAL BIN BUILDING LAYOUT OF COLUMNS SHOWING IP LOCATION
HOPPER BUILDING LAYOUT AND RCC DETAILS OF PLINTH BEAM AND SECTION
HOPPER BUILDING LAYOUT AND RCC DETAILS OF PLINTH BEAM AND SECTION
HOPPER BUILDING LAYOUT AND DETAILS OF EL±0.000M LEVEL AND SECTION
LAYOUT AND RCC DETAIL OF PLINTH BEAM AND SECTION
LAYOUT AND RCC DETAIL OF PLINTH BEAM AND SECTION
LAYOUT AND RCC DETAIL OF PLINTH BEAM ,PEDESTAL AND SECTION
PLAN AT +0.00M LVL AND RCC DETAIL
RCC DETAIL OF FOUNDATION AND SECTION
26 COAL GRINDING UNIT (COAL MILL )
HOPPER BLDG LAYOUT AND DETAIL OF+7.00M LVL AND SECTION
LAYOUT OF FLOOR BEAM SLAB PEDESTAL IP OPENING AT +6.400M LVL
LAYOT OF MASS CONCREIT BELOW COAL MIL FAN
HOPPER BLDG LAYOUT AND DETAIL OF+7.00M LVL AND SECTION
FINE COAL BIN RCC DETAIL OF FLOOR BEAM AT +6.400M LVL
FINE COAL BIN RCC DETAIL OF FLOOR BEAM AT +6.400M LVL
FINE COAL BIN RCC DETAIL OF FLOOR BEAM AT +6.400M LVL
HOPER BLDG LAYOUT AND DETAILS OF TIE BEAM AT +9.300M LVL AND SECTION
HOPPER BLDG LAYOUT OF FLOOR BEAMS SLAB IP AND OPENING AT +14.200M LVL
HOPPER BLDG RCC DET OF FLOOR BEAMS AT +14.200M LVL
FINE COAL BIN BLDG LAYOUT AND DET OF FLOOR BEAM ABD SLAB AT +12.00M LVL
FINE COAL BIN BUILDING RCC DET OF FLOOR BEAM +12.00M LVL
FINE COAL BLDG LAYOUT AND DET OF FLOOR BEAM AND SLAB AT +12.00M LVL
FINE COAL BIN BLDG LAYOUT AND DETA OF FLOOR BEAM AND SLAB AT +14.500M LVL
RCC DET OF FLOOR BEAM AT +14.500M LVL
RCC DET OF FLOOR BEAM AT +14.500M LVL
HOPPER BUILDING LAYOUT OF FLOOR BEAM, SLAB, INSERT PLATE & OPENING AT EL.+20.800M LVL.
HOPPER BUILDING RCC DETAILS OF FLOOR BEAM AT EL.+20.800M LVL.
FINE COAL BIN BUILDING-LAYOUT AND DETAILS OF FLOOR BEAM, AT EL+18.200M LVL (TOC)
FINE COAL BIN BUILDING-LAYOUT OF
FLOOR BEAM, INSERT PLATE AND
OPENING AT EL+22.200M LVL (TOC)
FINE COAL BIN BUILDING-RCC DETAILS OF
FLOOR BEAM AT EL+22.200M LVL (TOC)
FINE COAL BIN BUILDING-RCC DETAILS OF
FLOOR BEAM AT EL+22.200M LVL (TOC)
27 COAL MILL (35.3D)
COAL STACKER RECLAIMER
28
COAL SHED
29 WHRS
AQC BOILER
30 DM PLANT
30 SWITCHYARD & ELECTRICAL ROOM
30A MRSS
PACKING PLANT BUILDING
31
PACKER -4 NEW EXTEN.
31 Truck loading Building -1
Truck loading Building -2
32
NEW EXTENSION-PACKER-4
32A EMPTY BAG GODOWN
33 CEMENT MILL SUB STATION
BRU
34

34 BELT CONVEYOR
34A TRANSFER TOWER
35 CONSTRUCTION POWER
36 AMBULANCE & FIRE ENGINE SHED
37 CANTEEN
38 WEIGH BRIDGE
39 BATCHING PLANT
40 STORE SHED
40 LOGISTIC BUILDING

41 REFRACTORY GODOWN

42 SECURITY & TIME OFICE

43 TG

44 ACC

ADMN BUILDING

44 RAW MATERIAL SUB STATION

44 CABLE GALLERY

45 WATER TREATEMENT & PUMP HOUSE


PIPE RACK

BRAINE STORAGE

RAW WATER TANK


46 MAIN GATE
47 MANAVAR EXISTING SWITCH YARD
48 OIL TANK
TOILET BLOCK

TRANSPORT OFFICE
AUXILARY BLDG/REST SHELTER
CSR
ALTERNET FUEL SYSTEM
GRABBER
CONVEYOR
GRABBER
LIQUID AFR
AMMONIA SHED-SNCR
STP
SEPTIC TANK

CLINKER BULK LOADING

PLAN AT +0.300M LVL AND ELEVATION (CANCELLED)


PLAN AT +5.600M LVL AND DETAIL (CANCELLED)
ROOF PLAN AND SECTION 1 (CANCELLED)
PLAN AT +0.300M LVL AND ELEVATION
PLAN AT +5.600M LVL
PLAN AT +11.200M LVL
ELEVATION AND SECTION

27 KILN SUB STATION


Sl.No Name of Structure Description
LAYOUT AND FOUNDATION AND COLUMN (CANCELLED)
27 KILN SUB STATION DETAIL OF COLUMN AND ELEVATION (CANCELLED)
LAYOUT AND RC DETAIL OF FOUNDATION AND PLINTH BEAM (CANCELLED)
RC DETAILS OF PLINTH BEAM (CANCELLED)
RC DETAIL OF FOUNDATION AND COLUMN (CANCELLED)
LYOUT OF FOUNDATION AND PLINTH BEAM
COLUMN ELEVATION AND DETAILS
PLINTH BEAM ELEVATION AND DETAILS
PLINT BEAM ELEVATION AND DETAIL

PLAN AT +0.300 LVL PLAN AT +5.700LVL AND DETAILS (ARCHITECTURAL)


PLANT AT +11.20M LVL SECTION AND ELEVATION (ARCHITECTURAL)
ELEVATION
LAYOUT AND EC DETAIL OF FOUNDATION AND PLINTH BEAM
BEAM AND COLUMN ELEVATION AND SECTION
LAYOUT AND RCC DETAIL OF FLOOR AT +5.700M LVL
28 CEMENT MILL SUB STATION RCC DETAIL OF BEAM AT +5.700M LVL SHEET 1 OF 3
RCC DETAIL OF BEAM AT +5.700M LVL SHEET 2 OF 3
RCC DETAIL OF BEAM AT +5.700M LVL SHEET 3 OF 3
LINTEL BEAM AND PLAN DETAILAT +2.4M AND +3.3M LVL
LINTEL BEAM AND PLAN DETAILAT +7.80M AND +8.700 AND +9.200M LVL
LAYOUT AND RCC DETAIL OF FLOOR AT +11.200M LVL
LAYOUT AND RCC DETAIL OF BEAM AT +11.200M LVL
PLAN ELEVATION AND SECTION
LAYOUT AND RC DETIL OF FOUNDATION AND PLINTH BEAM
RC DETAIL OF PLINTH BEAM
LAYOUT AND RC DETAIL OF +4.00M FLOOR
29 RMH SUB STN
RC DETAIL OF +4.00M FLOOR
LAYOUT AND RC DETAIL OF +9.00M LVL FLOOR

LAYOUT AND FOUNDATION DETAILS OF CABLE GALLERY SUPORT


LAYOUT AND RC DETAIL OF FOOTINGS COLUMNS
LAYOUT AND FOUNDATION DETAIL OF CABLE TUNNEL
LAYOUT AND FOUNDATION DETAIL OF CABLE TUNNEL
30 CABLE GALLERY

GENERAL NOTES, SPECIFICATIONS AND LEGEND FOR R.C.C. & ARCHITECTURAL WORK
GENERAL NOTES AND SPECIFICATIONS FOR STRUCTURAL STEEL WORK
GENERAL NOTES AND SPECIFICATIONS FOR STRUCTURAL STEEL AND STANDARD DRAWING LIST
TOLERANCES FOR FABRICATION OF STANDARD STEELWORK
INSERT PLATE DETAILS
STANDARD INSERT PLATE DETAILS FOR BEAMS AND COLUMNS
STANDARD ANCHOR BOLT DETAILS
TYPICAL DUCTILE DETAILS FOR R.C.C. STRUCTURES (BEAMS)
TYPICAL DUCTILE DETAILS FOR R.C.C. STRUCTURES (COLUMN)
TYPICAL CABLE TRENCH DETAILS
TYPICAL CABLE TUNNEL DETAILS
TYPICAL DETAILS FOR STEEL STAIR FOUNDATION AND GRADE SLAB
TYP DETAIL OF SHEAR CONNECTIONS ISMB COLUMN TO ISMB BEAM CONNECTIONS (SHEET 1 OF 6)
TYP DETAIL OF SHEAR CONNECTIONS ISMB COLUMN TO ISMB BEAM CONNECTIONS (SHEET 2 OF 6)
TYP DETAIL OF SHEAR CONNECTIONS ISMB COLUMN TO ISMB BEAM CONNECTIONS (SHEET 3 OF 6)
TYP DETAIL OF SHEAR CONNECTIONS ISMB COLUMN TO ISMB BEAM CONNECTIONS (SHEET 4 OF 6)
TYP DETAIL OF SHEAR CONNECTIONS ISMB COLUMN TO ISMB BEAM CONNECTIONS (SHEET 5 OF 6)
TYP DETAIL OF SHEAR CONNECTIONS ISMB COLUMN TO ISMB BEAM CONNECTIONS (SHEET 6 OF 6)
TYP. DETAIL OF SHEAR CONNECTIONS ISMB BEAM TO ISMB BEAM CONNECTIONS (SHEET 1 OF 2)
TYP. DETAIL OF SHEAR CONNECTIONS ISMB BEAM TO ISMB BEAM CONNECTIONS (SHEET 2 OF 2)
TYP. DETAIL OF SHEAR CONNECTIONS ISMB BEAM TO ISMC CHANNEL CONNECTIONS (SHEET 1 OF 2)
31 STANDARD DRAWING TYP. DETAIL OF SHEAR CONNECTIONS ISMB BEAM TO ISMC CHANNEL CONNECTIONS (SHEET 2 OF 2)
TYP DETAIL OF SHEAR CONNECTIONS INSERT PLATE TO ISMB & ISMC BEAM CONNECTIONS
TYPICAL DETAIL OF FIN PLATE SHEAR CONNECTIONS INSERT PLATE TO ISMB & ISMC BEAM CONNECTION
STANDARD DETAILS OF BRACING CONNECTIONS SH. 1OF2
STANDARD DETAIL OF BRACING CONNECTION SH. 2OF2
TYPICAL SPLICE JOINT DETAIL FOR STRUCTURAL STEEL MEMBER
STAIR TYP DETAILS, STEEL STRUCTURE
HANDRAILING, TYPICAL DETAILS, STEEL STRUCTURAL
GRATING AND CHEQUER PLATE FLOOR TYPICAL DETAILS, STEEL STRUCTURE
LADDER TYPICAL DETAILS, STEEL STRUCTURE
TYP. DETAIL OF SHEAR CONNECTIONS UB COLUMN TO UB AND ISMB BEAM CONNECTION SHEET-1 OF 5
TYP. DETAIL OF SHEAR CONNECTIONS UB COLUMN TO ISMB BEAM CONNECTION SHEET-2 OF 5
TYP. DETAIL OF SHEAR CONNECTIONS UB COLUMN TO ISMB BEAM CONNECTION SHEET-3 OF 5
TYP. DETAIL OF SHEAR CONNECTIONS UB COLUMN TO ISMB BEAM CONNECTION SHEET-4 OF 5
TYP. DETAIL OF SHEAR CONNECTIONS UB COLUMN TO ISMB BEAM CONNECTION SHEET-5 OF 5
TYPICAL DETAIL OF SHEAR CONNECTION UB BEAM TO UB AND ISMB BEAM CONNECTION SHEET 1 OF 2
TYPICAL DETAIL OF SHEAR CONNECTION UB BEAM TO UB AND ISMB BEAM CONNECTION SHEET 2 OF 2
TYPICAL DETAIL OF SHEAR CONNECTION UB BEAM TO ISMC CHANNEL CONNECTION SHEET 1 OF 2
TYPICAL DETAIL OF SHEAR CONNECTION UB BEAM TO ISMC CHANNEL CONNECTION SHEET 2 OF 2
TYPICAL DETAIL OF SHEAR CONNECTION INSERT PLATE TO UB SECTION
TYPICAL DETAIL OF SHEAR CONNECTION INSERT PLATE TO UB SECTION FIN PLATE CONNECTION
TYPICAL SPLICE JOINT DETAIL FOR STRUCTURAL STEEL MEMBER UB CONNECTION

GENERAL NOTE CONCRIT AND STRUCTURAL


STAIR HAND RAIL AND GRATING DETAILS
TYPICAL DETAIL OF IP AND ANCHOR BOLT
32 STD DRAWING SECMEC
SPLICE CONNECTION DETAILS
CONNECTION DETAIL OF BEAM SHARE CONNECTION
TYPICAL WALL FOOTING DETAILS (WALL NOT OVER FOR PLINTH BEAM)