Bellevue Warehouse
Bellevue Warehouse
BRGY.VILLA KANANGA
THIS SITE
BRGY.SAN VICENTE
ARCHITECTURAL
STRUCTURAL
2.00 2.00
MECHANICAL
PRINCESS 4
PRINCESS 5
FIRE SAFETY
4.00 4.00
VICINITY MAP RECOMMENDING APPROVAL
8.00
SCALE NTS
16.00 2.00
26.00
APPROVED
SITE DEVELOPMENT PLAN
SCALE 1 : 200 M
DESIGN PROFESSIONAL PROJECT TITLE: OWNER : SHEET CONTENTS : SHEET NO.
PERSPECTIVE
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION
FINISH FLOOR LINE FINISH FLOOR LINE 0.90 FINISH FLOOR LINE
0.30 0.30 0.30
NATURAL GROUND LINE NATURAL GROUND LINE NATURAL GROUND LINE
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION
DS DS DS
0.60 0.60
FURRING
CEILING PLYWOOD LUMBER PLUMBING ELECTRICAL
3.00 3.00
1.80
TOOLS EQUIPMENT
10.00 3.00 10.00 11.20
CR KITCHEN TILES PAINT 10.00 10.00
1.20 W.2
D.3 11.20
D.2
CEMENT
4.00 W.1
4.00
16.00 17.20
0.70 0.60
1.00 1.00 0.60
1.20
0.60
1.20
2.10 2.10 2.10
D-1 D-2 D-3 1.30
W-1
0.90
FINISH FLOOR LINE
FLOOR PLAN
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION
4.00 4.00 4.00 4.00 0.60 4.00 4.00 4.00 4.00 0.60
DS DS DS
0.60
C1 C1 C1 C1 C1 1.20
C1
1.00
C1 C1 C1 C1
1.00
1.80
10.00 C1 C1 3.00 10.00 1.00
C1 C1 C1 C1 C1
1.00
1.00 0.60
DS DS DS
4.00 4.00 4.00 4.00
0.60 16.00 0.60
16.00
2.00 2.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0.80
0.80
1.50
0.80
4" X 4" COCO LUMBER COLUMN 2" X 3" COCO LUMBER MEMBE
FOUNDAATION PLAN
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION
3.00 3.00
3.00 3.00
1.80 1.80
3.00 10.00 10.00 3.00 10.00
10.00
S
1.20 1.20
C1
S
4.00 4.00 4.00 4.00
C2
16.00 16.00
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION
PANEL BOARD
1.80 1.60
POWER SERVICE ENTRANCE
THIS SITE
RISER DIAGRAM
PRINCESS 4
TO ANECO SOURCE
2W-14mm² TW
IN 32mmØ PVC CONDUIT
SPARE 3 4 SPARE
SPACE 5 6 SPACE
VICINITY MAP
GROUND BUS
SCALE NTS
GROUND
RISER DIAGRAM
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION
CKT LOAD DESCRIPTION NO. OF L.O NO. OF C.O WATTS AMPS ACB RATING SIZE & TYPE OF WIRE WIRING SYSTEM CONNECTION GROUND WIRE KAIC
LIGHTING OUTLET ² ²
COMPUTATION OF LOADS 1. ALL ELECTRICAL WORKS AND INSTALLATION SHALL BE DONE IN ACCORDANCE WITH THE LATEST
EDITION OF THE PHILIPPINE ELECTRICAL CODE AND SHALL CONFORM WITH THE RULES AND
TL VA = 2135 WATTS NET COMPUTED LOAD REGULATION OF THE LIGHT AND POWER UTILITY COMPANY OF THE LOCAL ENFORCING AUTHORITY
HAVING JURISDICTION OVER THIS PROJECT.
TL I= 2135 / 230
=9.28 AMPS 2. MOUNTED ABOVE FINISHED FLOOR LINE
PANEL BOARD 1.80 m
FOR FEEDER LINE PROTECTION FOR FEEDER LINE CONDUCTOR SWITCHES 1.35 m
CONVENIENCE OUTLET 0.30 m
I= IT X FS X DF I= IT X FS X DF
=9.28 X 2.00 X 0.80 =9.28 X 1.50 X 0.80 RESPECTIVELY EXCEPT CONVENIENCE FLOOR OUTLET.
=14.85 AMPS =11.14 AMPS
3. MINIMUM SIZE OF WIRE AND PIPE SHALL BE 3.50 mm ² Ø THW AND 15 mm Ø PVC AND ALL
USE 60 AT / 60 AF USING 2-14 mm² THW IN 32 mm DIA. uPVC SCHED 40 MATERIALS AND FIXTURES TO BE USED SHALL BE BRAND NEW AND OF APPROVED TYPE.
4. SERVICE ENTRANCE SHALL BE SINGLE PHASE, TWO WIRES, 220V, 60 CYCLES PER SECOND.
5. ALL ELECTRICAL WORKS AND INSTALLATION SHALL BE DONE LAID UNDER CLOSE AND DIRECT
SUPERVISION OF A DULY LICENSED REGISTERED AND PROFESSIONAL ELECTRICAL ENGINEER.
SCHEDULE OF
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION
1. ELECTRONICS OUTLET MUST BE 0.30 METERS ABOVE THE FINISHED FLOOR LEVEL UNLESS
TV PB
ELECTRONICS LAY OUT 4. CONSULT DESIGNING PROFESSIONAL ELECTRONICS ENGINEER FOR MORE DETAIL AND
SPECIFICATIONS.
SCALE 1 : 100 M
LEGEND :
MARK DESCRIPTION
CATV PORT
PULL BOX
JUNCTION BOX
FTTH PORT
SERVICE ENTRANCE PORT
SMOKE DETECTOR BATTERY OPERATED
HEAT DETECTOR
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION
TO NETWORK
RG6 COAXIAL CABLE ACCESS POINT (NAP) OPTICAL INDOOR FIBER OPTIC
SPLITTER FIBER OPTIC FTTH
JUNCTION BOX OPTICAL OUTLET
TO SEC. CATV COMPANY TO TELCO CABLE ( FOC ) CABLE ( FOC ) MODEM
( OJB ) (100) TELEPHONE SET
PULL BOX
ABOVE GROUND LEVEL
HOOK TO PROVIDE
CLAMP TYPE BY OWNER
DROP WIRE
PIPE BRACKET
PULL BOX
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION
3.00
12 mm Ø MATTING BARS
3.00
SPACE AT 200 mm O.C
0.50
CO
0.05
1" Ø PVC WATER PIPE
0.05
4.00 4.00 2.20
4 "Ø SIPHON 4 "Ø SIPHON 2.20
4 "Ø SIPHON
1.40
1.30 DIGESTIVE
WATER WATER CHAMBER
CHAMBER CHAMBER
50 mm SLUDGE
TO WATER SOURCE
10 mm Ø VERTICAL 6 " CHB
10 mm Ø
TO SEWER LINE BARS SPACE AT
HORIZONTAL LAYER BAR
200 mm O.C
SPACED AT 600 mm O.C
4.00
SEPTIC TANK
4.00 4.00 4.00
SCALE 1 : 200 M
VTR
KD
Fau Fau
P TIC CO FD
SE WC
TO
SE
WE
RL
INE
TO
W
AT
ER
SO
UR
ISOMETRIC PLUMBING LAYOUT PLAN
C E
TEMPORARY WAREHOUSE
FIDEL VICTOR S. UY
ASSISTANT GENERAL MANAGER-OPERATION