Recap Line Stop
Recap Line Stop
Machine
Man
Material
50,793 43,186 1,776 Methode
Machine
Man
Material
Methode
116,343 99,508 4,068
Man
Material
42,213 26,800 1,476 Methode
Machine
Man
Material
53,653 52,416 1,876
Methode
Machine
Man
Material
Methode
61,775 48,972 2,160
Machine
Man
Material
86,050 59,205 1,721
Methode
86,050 59,205 1,721
Machine
Man
Material
Methode
246,000 192,945 4,920 Machine
Man
Material
Methode
Machine
169,950 67,641 3,090
Man
Material
Methode
141,114 60,479 2,752
Machine
Man
Material
Methode
Machine
Man
Man
Material
Methode
72,720 35,810 2,128
Machine
Man
Material
Methode
160,680 57,848 2,472
Machine
Man
Material
Methode
465,600 354,685 4,656
Man
Material
158,654 119,122 1,588 Methode
Machine
Man
Material
171,864 155,633 18.48 Methode
Machine
Man
Material
Methode
171,864 146,125 1,848
Machine
Machine
Man
Material
220,880 21,100 2,160 Methode
Machine
Man
Material
469,772 458,307 5,728 Methode
Machine
Man
Material
432,000 378,988 3,456 Methode
Machine
Man
Material
Methode
282,500 93,339 2,260
Machine
Problem Line Stop Waktu Line Stop/Min
Setting 280
TOTAL 280
540
Perbaikan BodyNyerut 43
Loading Material 75
Perbaikan Body Nyerut 20
Perbaikan No.6 Nabrak 60
Perbaikan Hex Nyerut 142
Perbaikan Dies#4 151
TOTAL 448
Cek QC 120
Perbaikan Kepala Crack 289
Setting 1,164
TOTAL 1573
Man Power Gakepegang 864
Cek QC 250
Perbaikan Awal 270
Perbaikan Prenpendi Cular Over 960
Perbaikan Kepala Dimpel Variasi 325
Perbaikan kedalaman Ekor Over 400
Perbaikan Concerticity 228
Setting 1,404
Line Stop Dies Gompal 612
TOTAL 5313
Cek QC 38
Setting 90
TOTAL 128
Perbaikan Step Bwah Flange 20
Dies #4 Pecah 116
TOTAL
Man Power Gakepegang 312
Loading Material 79
Perbaikan Body Melintir dan Nyerut 480
Perbaikan Kesenteran 210
TOTAL 1081
Cek QC 43
TOTAL 396
Setting 1090
TOTAL 1954
TOTAL 140
Mp OFF Megang Mc CBP 136L 290
Perbaikan Concerticity 75
Perbaikan Snsor ShortFeed 60
TOTAL 425
Mp OFF Megang Mc CBP 136L 315
Perbaikan Concerticity 80
Cek QC 30
Perbaikan Griper 75
Setting 1,014
TOTAL 1514
Persentase (%)
2.44%
1.35%
Loading Cek QC Perbaikan Perbaikan Clamper
6.15% Material Body Over Body Over Patah
(Crane dan main
3.53% Rusak) rod patah
3.29%
16.76%
15.76%
15.76
8.30%
2.94%
1.86%
1.37% Perbaikan Part Kran Mati Perbaikan Hex Perbaikan Body
Melintir Perbaikan Gompal Nyerut
14.47% MTC
6.77%
29.81%
36.58%
2.29%
3.47%
0.92%
2.77%
6.57%
6.99%
20.72%
7.43%
14.52%
6.97%
2.32%
31.24%
10.20%
2.56%
0.60%
7.11%
1.09%
21.56%
5.82%
3.88%
7.76%
8.09%
14.95%
5.76%
13.91%
60.17%
4.36%
10.50%
42.29%
57.15%
12.43%
3.59%
3.88%
13.82%
4.67%
5.75%
3.28%
20.21%
8.81%
76.44%
10.79%
25.56%
36.35%
0.46%
2.69%
3.15%
14.66%
3.71%
22.55%
9.86%
50.78%
1.55%
28.88%
20.88%
12.37%
8.44%
70.57%
6.87%
10.11%
6.87%
38.26%
8.77%
64.01%
4.23%
11.85%
5.51%
2.25%
23.84%
24.93%
24.93%
8.87%
36.07%
6.31%
51.25%
5.57%
3.89%
9.46%
11.63%
1.73%
1.62%
14.98%
0.78%
1.97%
1.65%
4.40%
40.00%
50.46%
90.46%
2.44%
2.44%
8.39%
2.17%
1.73%
12.29%
13.93%
3.53%
1.32%
3.31%
44.86%
66.95%
er
an Body
erut
MESIN PROBLEM PRODUKSI
6000
5000
4000
3000 Column C
2000
1000
0
Man Methode Material Machine
TOTAL WKTU LINE
PERSENTASE
STOP
400 6.15%
1600
338 8.30%
440 29.81%
1400
502 10.20%
1,404 20.21%
1000
116 2.69%
552 11.85%
400
1,463 36.07%
1,090 50.46%
140 2.44% 0
Setting
Loading Material
Perbaikan Body Over
290 8.39%
1,014 44.86%
Perbaikan Flange
Perbaikan Body Melintir dan Nyerut
Setting
Cek QC
Loading Material
Dies #4 Pecah
de Material Machine Machine Machine Methode Methode Methode Methode Methode Methode Mach
6L CBF 104 L CBF 104 S CBF 104 S CBF 104 S JBF 17 CBF 84S (01) CBF 84S (02) CBF 64S (01) CBF 64S (02) CBF 64S (03) CBF 64
(01) (02) (03)
Column E
Perbaikan Produk Kotor
Methode
Perbaikan Flange Ngembang
Methode
Setting
Machine
Perbaikan Pin Reses Patah
Methode
BF 64S (02) CBF 64S (03) CBF 64S (04) CBF 64S (05)
Mp OFF Megang Mc CBP 136L
Man
CH 6L(01)
Setting
Machine
CH 6L(02)
No Mesin Product
37,450 27,086
73,230 73,174
37,065 35,977
148,538 134,452
18,990 15,310
64,770 59,013
23,026 23,026
24,623 16,039
241,519 194,619
59,026 51,626
314,894 199,437
141,348 65,060
141,348 65,060
167,980 66,075
314,894 335,637
129,873 86,425
150,336 41,219
202,536 120,222
202,536 120,222
128,064 110,270
75,168 76,326
370,272 329613
505,284 393,139
295,104 327,385
86,592 60,250
69,936 61,293
190,896 27,778
56,088 30,800
160,704 78,220
633,888 541,264
211,748 216,072
333,972 268,897
364,600 307,070
108,000 15,000
486,000 166,303
31 Oktober - 6 November
Total Waktu Kerja / Menit Problem Line Stop
Man
Methode Perbaikan Body Over
1,309
Material
Machine
Man
Methode
2,560
Material
Machine
Man
Methode Cek QC
1,296
Material
Machine
Man
Methode Perbaikan Dies #4 Nyerut
6,177 Material Basket Habis
Machine
TOTAL
Man
Methode
664
Material
Machine Setting
Man
Methode Perbaikan Kepala Barry
Cek QC
2,264
Material
Machine
TOTAL
805
Man
Methode Perbaikan Marking
Perbaikan Diameter Ulir Minus
860 Material
Machine Oli Mesin Kurang
Setting
TOTAL
Man
Methode
Material Loading Material
4,830
Basket Habis
Machine Front Nib #2 Pecah
TOTAL
Man
Methode
1,180
Material Basket Habis
Machine
Man
Methode Cek QC
Perbaikan Kepala Barry
Perbaikan Concerticity
6,816 Perbaikan Body Kotor
Material Basket Habis
Machine Perbaikan Pompa Oli Copot
Perbaikan Dies Pecah
TOTAL
Man
Methode Perbaikan Prependicular Over
Perbaikan Concentricity Over
2,348
Material
Machine Conveyor Rusak
2,348
TOTAL
Man
Methode Perbaikan Concerticity Body
Perbaikan Champer Miring
Perbaikan Body Kotor
3,636 Cek QC
Material
Machine Setting
Perbaikan Die Gompal
TOTAL
Man
Methode
6,816
Material
Machine
Man
Methode
Material Basket Habis
2,239
Machine Setting
Perbaikan Material Tidak Narik
TOTAL
Man MP Belum kepegang Perbaikan
Methode Perbaikan Part Melintir
2,592 Material Basket Habis
Machine Setting
TOTAL
Man MP Ga Kepegang
Methode Perbaikan Bawah Flange Dimple
Perbaikan Body Nyerut
Cek QC
3,492 Material
Machine Perbaikan Van Belt
3,492
Setting
Dies Pecah
TOTAL
Man
Methode Cek QC
Perbaikan Meluncur & Hex Nyerut
2,208
Material Basket Habis
Machine Setting
TOTAL
Man
Methode
1,296
Material
Machine
Man MP Ga Kepegang
Methode Perbaikan Body Kotor
Perbaikan Concerticity
6384 Material
Machine Setting
Pergantian Front Nib Pecah
TOTAL
Man
Methode Cek QC
Perbaikan Bawah Flange Kotor
6,396 Material Basket Habis
Loading Material
Machine Perbaikan Nabrak No.1 (Finger Gompal)
TOTAL
Man
Methode
5088
Material
Machine
Man
Methode Cek QC
1,056 Material
Machine Setting
TOTAL
Man
Methode Perbaikan Kepala Miring
752
Material
Machine
Man
Methode
2,328
Material
Machine Setting Engineering
Man
Methode Cek QC
684 Material
Machine Setting
TOTAL
Man
Methode Perbaikan Flange Ngembang
1,728 Material Basket Habis
Machine
TOTAL
Man
Methode
Material
6,816
Machine Setting
Dies Gompal (Stock Kosong)
TOTAL
2,582 Man
Methode
Material
Machine
Man
Methode
3,408 Material Basket Habis
Machine Setting
TOTAL
Man
Methode
Material Loading Material
2,916
Machine Perbaikan Selang Oli Lepas
Perbaikan Kabel Sensor ShortFeed Putus
TOTAL
Man
Methode
Material
864
Machine Setting
Oli Tidak Mau Naik
TOTAL
Man
Methode Perbaikan Kepala Barry
Cek QC
Perbaikan Body
Material
3,888
Machine Pergantian Feed Roller
Setting
Pergantian Dies
Perbaikan Oli Tidak Ngalir
TOTAL
Waktu Line Stop/Min Persentase (%)
72.32%
362 27.65%
99.92%
97.06%
38 2.93%
90.51%
60 0.97%
526 8.51%
586 9.48%
80.62%
128 19.27%
91.11%
170 7.50%
31 1.36%
201 8.86%
65.13%
90 10.46%
60 6.97%
50 5.81%
100 11.62%
300 34.86%
80.58%
369 7.63%
494 10.22%
76 1.57%
939 19.42%
87.46%
148 12.54%
63.33%
120 1.76%
105 1.54%
170 2.49%
672 9.85%
1273 18.67%
131 1.92%
30 0.44%
2501 36.67%
46.02%
339 14.43%
87 3.70%
842 35.86%
1268 53.99%
39.33%
426 11.71%
180 4.95%
435 11.96%
60 1.65%
852 23.43%
254 6.98%
2207 60.68%
66.54%
210 9.37%
443 19.78%
97 4.33%
750 33.48%
360 13.88% 27.41%
67 2.58%
745 28.74%
710 27.39%
1882 72.59%
360 10.30% 59.35%
75 2.14%
110 3.15%
60 1.71%
612 17.52%
117 3.35%
87 2.49%
1421 40.66%
86.10%
60 2.71%
60 2.71%
70 3.17%
118 5.34%
308 13.93%
101.54%
257 4.02%
213 3.33%
704 10.99%
77.80%
27 0.42%
81 1.26%
1164 18.19%
60 0.93%
90 1.40%
1422 22.20%
69.57%
52 4.92%
270 25.56%
322 30.48%
87.64%
93 12.36%
14.55%
1989 85.43%
54.91%
68 9.94%
240 35.08%
308 45.02%
48.67%
37 2.14%
850 49.18%
887 51.32%
85.38%
444 6.51%
552 8.09%
996 14.60%
80.51%
353 10.35%
312 9.15%
665 19.50%
84.22%
60 2.05%
341 11.69%
60 2.05%
461 15.79%
13.88%
380 43.98%
364 42.12%
744 86.10%
34.21%
1,564 40.22%
120 3.08%
60 1.54%
120 3.08%
585 15.04%
40 1.02%
70 1.80%
2,559 65.78%
MESIN PROBLEM PRODUKSI TOTAL WKTU LINE STOP
27.65%
8.51%