Evaluation Report on the proposed Road Widening - Secondary Roads - Mindoro
Oriental/Occidental East Coastal Rd - K0195+262 - K0197+000 - Barangay Maujao ,
Bulalacao, Mindoro Oriental, R4B (Pending for total of <span
style='color:green;'>2</span> days) with project type & size: Item 3.4.1 Infrastructure
Projects/Roads and Bridges/Roads, new construction/National Road (1.738 Kilo meter in
Length with no critical slope) of DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS - SOUTHERN MINDORO DEO - Barangay Maujao, Bulalacao, Mindoro
Oriental, R4B
Requirement Compliant Remarks
Government Issued ID of Engr. Yes acceptable.
ANNIELYN E. PADULLO
Site Development Plan No Please, submit justification of
construction road project that is
not connected to another road and
is under Category D. and If the
total/final length will be more
than 2 Kms, please apply for an
ECC.
- and please coordinate to PEMU
office for the site validation.
Photos of Project Area taken Yes acceptable.
within 15 days from filing
Notarized Accountability Yes acceptable.
Statement of Engr. ANNIELYN
E. PADULLO
Over all Remarks: Requires submission of additional information or further clarification based on the above
results.
+++++++++++++++++ THIS IS A COMPUTER GENERATED DOCUMENT +++++++++++++++++
Generated By divina a. borja on 6/4/2025 2:05:56 PM
REPLY:
NAVALIDATE NA PO NG PEMU ANG PROPOSED PROJECT PO NA ROAD WIDENING AT
ITO PO AY MAY HABA LAMANG NA 1,738.00 METERS KAYA PO INAPPLAYAN LANG NAMIN
NG CNC PO. MAY KARUGTONG PA PO ITO NAIROROAD WIDENING PERO HINDI PA PO
NAMIN ALAM KUNG KAILAN KAYA ITONG PROJECT LAMANG PO NA ITO ANG INAAPPLYAN
NAMIN. MARAMING SALAMAT PO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION IV-B, MIMAROPA
SOUTHERN MINDORO DISTRICT ENGINEERING OFFICE
ROXAS, ORIENTAL MINDORO
C.Y. 2025 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
Road Widening - Secondary Roads - Mindoro
Oriental/Occidental East Coastal Rd - K0195+262 - K0197+000
BRGY. MAUJAO, BULALACAO, ORIENTAL MINDORO
STATION LIMIT
BEGINNING OF SURVEY : K0195+262.00
END OF SURVEY : K0197+000.00
TOTAL LENGTH : 1, 738.00 meters
:
SUBMITTED: RECOMMENDED: APPROVED:
RAYMOND D. SISCAR EMMANUEL A. MANALAYSAY ANNIELYN E. PADULLO
CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: DATE:
w
K0195+262 - K0197+000
TOTAL PROJECT LENGTH TO BE WIDENED : 1,738.00 meters
N
S
E
END OF PROJECT
K0197+000.00
END OF PROJECT
COORDINATES:
12°17'36.7"N 121°17'31.4"E
SITE DEVELOPMENT PLAN BEGINNING OF PROJECT
SCALE NTS K0195+262.00
BEGINNING OF PROJECT
COORDINATES:
12°18'14.5"N 121°17'46.4"E
DRAFTED :
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYMART F. GAAN
REGION IV-B ENGINEER II (COS)
Road Widening - Secondary Roads - Mindoro DPWH
SOUTHERN MINDORO SITE DEVELOPMENT PLAN PREPARED : ROADS
Oriental/Occidental East Coastal Rd CY-2025
DISTRICT ENGINEERING OFFICE MARK CHRISTIAN I. OBRIQUE RAYMOND D. SISCAR EMMANUEL A. MANALAYSAY ANNIELYN E. PADULLO
ROXAS, ORIENTAL MINDORO - K0195+262 - K0197+000 HEAD, HIGHWAY DESIGN UNIT CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER SMDEO
KIM C. MONTESA
DATE: ENGINEER II DATE: DATE: DATE: DATE:
------>
TO MUNICIPALITY OF MANSALAY
MUNICIPALITY OF BULALACAO
BARANGAY MAUJAO <BEGINNING OF PROJECT
w E
END OF PROJECT>
RO
DO
L MIN MAUJAO NATIONAL HIGH SCHOOL
NTA
CIDE
OC
TO
<------
SITE HERE
VICINITY MAP
SCALE NTS
DRAFTED :
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYMART F. GAAN
REGION IV-B Road Widening - Secondary Roads - Mindoro ENGINEER II (COS)
DPWH
SOUTHERN MINDORO Oriental/Occidental East Coastal Rd SITE DEVELOPMENT PLAN PREPARED : ROADS
CY-2025
DISTRICT ENGINEERING OFFICE - K0195+262 - K0197+000 MARK CHRISTIAN I. OBRIQUE RAYMOND D. SISCAR EMMANUEL A. MANALAYSAY ANNIELYN E. PADULLO
ROXAS, ORIENTAL MINDORO HEAD, HIGHWAY DESIGN UNIT CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER SMDEO
KIM C. MONTESA
DATE: ENGINEER II DATE: DATE: DATE: DATE:
Road Widening - Secondary Roads - Mindoro Oriental/Occidental East Coastal Rd - K0195+262 -
K0197+000
SITE VALIDATION WITH PEMU REPRESENTATIVE ( ENGR. MARVIN FETALCO)
Road Widening - Secondary Roads - Mindoro Oriental/Occidental East Coastal Rd - K0195+262 -
K0197+000
SITE VALIDATION WITH PEMU REPRESENTATIVE ( ENGR. MARVIN FETALCO)