0% found this document useful (0 votes)
7 views18 pages

111

The document contains multiple test reports for concrete cubes (M40) conducted by M/S Hindustan Infratech, detailing the compressive strength results over various curing periods (7 and 28 days). Each report includes specific measurements such as weight, area, maximum load, and average compressive strength, with all results adhering to standard testing methods. No deviations from the standard test methods or specifications were noted in any of the reports.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views18 pages

111

The document contains multiple test reports for concrete cubes (M40) conducted by M/S Hindustan Infratech, detailing the compressive strength results over various curing periods (7 and 28 days). Each report includes specific measurements such as weight, area, maximum load, and average compressive strength, with all results adhering to standard testing methods. No deviations from the standard test methods or specifications were noted in any of the reports.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

TEST REPORT Page 1 of 1

Name and Address of : OFFICE OF THE Report No. : B202505010008


the Customer SSE/W/LINE/DLI
01/05/2025
Date of Sample Receipt :

Test Started on : 01/05/2025


07/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-01/05/2025 Date of Report : 07/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-30/04/2025 (7 DAYS)(SAMPLE NO 1)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.456 22500 739.8 32.88
2 8.467 22500 770.1 34.23
3 8.598 22500 795.1 35.34
Average compressive strength (N/mm²) 34.15
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505010009
the Customer SSE/W/LINE/DLI
01/05/2025
Date of Sample Receipt :

Test Started on : 01/05/2025


07/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-01/05/2025 Date of Report : 07/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-30/04/2025 (7 DAYS)(SAMPLE NO 2)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.564 22500 777.3 34.55
2 8.490 22500 840.1 37.34
3 8.576 22500 824.6 36.65
Average compressive strength (N/mm²) 36.18
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505010010
the Customer SSE/W/LINE/DLI
01/05/2025
Date of Sample Receipt :

Test Started on : 01/05/2025


28/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-01/05/2025 Date of Report : 28/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-30/04/2025 (28 DAYS)(SAMPLE NO 1)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.563 22500 972.9 43.24
2 8.652 22500 1012.0 44.98
3 8.577 22500 1018.1 45.25
Average compressive strength (N/mm²) 44.49
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505010011
the Customer SSE/W/LINE/DLI
01/05/2025
Date of Sample Receipt :

Test Started on : 01/05/2025


28/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-01/05/2025 Date of Report : 28/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-30/04/2025 (28 DAYS)(SAMPLE NO 2)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.564 22500 1017.4 45.22
2 8.490 22500 995.1 44.23
3 8.576 22500 1052.1 46.76
Average compressive strength (N/mm²) 45.40
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505020008
the Customer SSE/W/LINE/DLI
02/05/2025
Date of Sample Receipt :

Test Started on : 02/05/2025


08/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-02/05/2025 Date of Report : 08/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-01/05/2025 (7 DAYS)(SAMPLE NO 1)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.578 22500 719.5 31.98
2 8.675 22500 729.6 32.43
3 8.590 22500 804.1 35.74
Average compressive strength (N/mm²) 33.05
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505020009
the Customer SSE/W/LINE/DLI
02/05/2025
Date of Sample Receipt :

Test Started on : 02/05/2025


08/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-02/05/2025 Date of Report : 08/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-01/05/2025 (7 DAYS)(SAMPLE NO 2)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.469 22500 762.0 33.87
2 8.481 22500 740.2 32.90
3 8.590 22500 787.0 34.98
Average compressive strength (N/mm²) 33.91
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505020010
the Customer SSE/W/LINE/DLI
02/05/2025
Date of Sample Receipt :

Test Started on : 02/05/2025


29/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-02/05/2025 Date of Report : 29/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-01/05/2025 (28 DAYS)(SAMPLE NO 1)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.673 22500 1008.9 44.84
2 8.698 22500 987.3 43.88
3 8.467 22500 995.6 44.25
Average compressive strength (N/mm²) 44.32
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505020011
the Customer SSE/W/LINE/DLI
02/05/2025
Date of Sample Receipt :

Test Started on : 02/05/2025


29/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-02/05/2025 Date of Report : 29/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:--01/05/2025 (28 DAYS)(SAMPLE NO 2)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.454 22500 1037.4 46.12
2 8.760 22500 1013.1 45.03
3 8.526 22500 984.6 43.76
Average compressive strength (N/mm²) 44.97
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505090004
the Customer SSE/W/LINE/DLI
09/05/2025
Date of Sample Receipt :

Test Started on : 09/05/2025


15/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-09/05/2025 Date of Report : 15/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-08/05/2025 (7 DAYS)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.674 22500 770.1 34.23
2 8.453 22500 762.0 33.87
3 8.594 22500 791.3 35.17
Average compressive strength (N/mm²) 34.42
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505090005
the Customer SSE/W/LINE/DLI
09/05/2025
Date of Sample Receipt :

Test Started on : 09/05/2025


05/06/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-09/05/2025 Date of Report : 05/06/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:--08/05/2025 (28 DAYS)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.454 22500 1001.7 44.52
2 8.760 22500 974.9 43.33
3 8.526 22500 1036.3 46.06
Average compressive strength (N/mm²) 44.63
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505200010
the Customer SSE/W/LINE/DLI
20/05/2025
Date of Sample Receipt :

Test Started on : 20/05/2025


26/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-20/05/2025 Date of Report : 26/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-19/05/2025 (7 DAYS)(SAMPLE NO 1)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.478 22500 793.8 35.28
2 8.575 22500 783.6 34.83
3 8.690 22500 765.9 34.04
Average compressive strength (N/mm²) 34.71
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505200011
the Customer SSE/W/LINE/DLI
20/05/2025
Date of Sample Receipt :

Test Started on : 20/05/2025


26/05/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-20/05/2025 Date of Report : 26/05/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-19/05/2025 (7 DAYS)(SAMPLE NO 2)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.456 22500 789.0 35.07
2 8.563 22500 771.9 34.30
3 8.576 22500 762.4 33.88
Average compressive strength (N/mm²) 34.41
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505260005
the Customer SSE/W/LINE/DLI
26/05/2025
Date of Sample Receipt :

Test Started on : 26/05/2025


02/06/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-26/05/2025 Date of Report : 02/06/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-25/05/2025 (7 DAYS)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.548 22500 742.0 32.98
2 8.475 22500 792.6 35.23
3 8.540 22500 743.4 33.04
Average compressive strength (N/mm²) 33.75
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505270007
the Customer SSE/W/LINE/DLI
27/05/2025
Date of Sample Receipt :

Test Started on : 27/05/2025


02/06/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-27/05/2025 Date of Report : 02/06/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-26/05/2025 (7 DAYS)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.666 22500 760.0 33.78
2 8.453 22500 795.1 35.34
3 8.436 22500 745.2 33.12
Average compressive strength (N/mm²) 34.08
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505280005
the Customer SSE/W/LINE/DLI
28/05/2025
Date of Sample Receipt :

Test Started on : 28/05/2025


03/06/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-28/05/2025 Date of Report : 03/06/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-27/05/2025 (7 DAYS)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.456 22500 746.5 33.18
2 8.498 22500 770.1 34.23
3 8.467 22500 786.1 34.94
Average compressive strength (N/mm²) 34.11
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505290004
the Customer SSE/W/LINE/DLI
29/05/2025
Date of Sample Receipt :

Test Started on : 29/05/2025


04/06/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-29/05/2025 Date of Report : 04/06/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-28/05/2025 (7 DAYS)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.453 22500 764.7 33.99
2 8.487 22500 805.0 35.78
3 8.499 22500 782.1 34.76
Average compressive strength (N/mm²) 34.84
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505310003
the Customer SSE/W/LINE/DLI
31/05/2025
Date of Sample Receipt :

Test Started on : 31/05/2025


06/06/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-31/05/2025 Date of Report : 06/06/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-30/05/2025 (7 DAYS)(SAMPLE N0-01)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.675 22500 777.6 34.56
2 8.466 22500 764.5 33.98
3 8.543 22500 792.6 35.23
Average compressive strength (N/mm²) 34.59
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***


TEST REPORT Page 1 of 1
Name and Address of : OFFICE OF THE Report No. : B202505310004
the Customer SSE/W/LINE/DLI
31/05/2025
Date of Sample Receipt :

Test Started on : 31/05/2025


06/06/2025
Test Completed on :

Reference No. & Date : SW/LINE/C-89, DATE:-31/05/2025 Date of Report : 06/06/2025

Name of Contractor : M/S HINDUSTAN INFRATECH


Description &
Identification of Item : CONCRETE CUBE M40, CATING DATE:-30/05/2025 (7 DAYS)(SAMPLE N0-02)
Tested

S. Weight of specimen(Kg.) Area of specimen(mm²) Maximum Load Compressive Strength


No. (KN) (N/mm²)
1 8.564 22500 808.4 35.39
2 8.555 22500 742.0 32.98
3 8.445 22500 791.1 35.16
Average compressive strength (N/mm²) 34.51
(Average compressive strength of three cubes shall be taken as batch provided by the customer and the
individual variation is not more than ± 15 percent of the average)
Remarks:- Any deviation from the standard test method/ specification :Nil

*** End of Test Report***

You might also like