0% found this document useful (0 votes)
5 views2 pages

MD - Abdul - Wahid-1 (3) - 3 (1) - 2

Uploaded by

Abdul wahid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views2 pages

MD - Abdul - Wahid-1 (3) - 3 (1) - 2

Uploaded by

Abdul wahid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

VILL: - MALINGAON, P.S + P.

O: - POWAKHALI, DIST: - KISHANGANJ, PIN: - 855108,


MOB: -, 9939375255, EMAIL: - wahidcivil786@gmail.com

MD ABDUL WAHID
Strengths
 Communication Skills
 Hard Working
 Responsible
 Time Management
 Leadership (Class Representative)

Career Objective
 To be an expert in the practical field through commitment, perseverance and continuous
improvement.

Professional Education
 2016-2019 B.E (Civil engineering), Dhanalakshmi Shrinivasan College of Engineering &
Technology, (Chennai, Tamilnadu).(7.4CGPA)
 2013-2016 Diploma (Civil), Malik Sandal Polytechnic, (Vijayapura, Karnataka).(79.60%)
 2012-2013 Matric (10th), Project Girls H/S, (BSEB, Patna, Bihar). (66.67%)

Project
 Portable Pollution Control Plant.
 Flexural Behavior of Self Curing Concrete with Lightweight Aggregate and Polyethylene Glycol.
Computer Skills
 Auto Cad
 MS Office (Excel, Word & Powerpoint)

Personal Data
 Father’s Name Ahmed Hussain
 Date of Birth 20 August 1996
 Marital Status Single
 Interest Book, Cricket & Net Browsing

Professional Experience
 Organisation : H.R infrastructures
 Duration. : From March 2024 to till now
 Project Name : Dharmjaygarh to Kapu road ch. 0+00 to 32+596 (ADB LOAN-03) PKG-20
 Role : Structure Site Engineer
 Responsibility:
 Coordinate with sub-contractors & Client Regarding execution of work.
 Planning of Work Day before work execution with client
 Execution of work on site as per Design/Drawings.
 Preparation of Bar Bending Schedule on MS excel
 Preparation of sub-contractors Bill.
 Preparation of Joint measurent sheet with client.
 Preparation of Running Bill of orgnisation.
 Preparation of Daily Progress Report(DPR) of all site activities


 Organization : VBB Infra Pvt. Ltd.
 Client-1 : KEC International Limited
 Client-2 : IRKON
 Duration. : From July 2021 to March 2023
 Project Name : Construction of 16 nos of Underpasses for wildlife between ch 31+000 to
111+000 (between Bhingra-Bhadi) for Commissioning of Railway line between Gerva
Road (0 Km) to Pendra Road (135 Km) Double line for Chhattisgarh East West Rail
Corridor in the state of Chhattisgarh Over South East Central Railway
 Role. : Site Engineer
 Responsibility:
 Coordinate with sub-contractors & Client Regarding execution of work.
 Planning of Work Day before work execution with client
 Execution of work on site as per Design/Drawings.
 Preparation of Bar Bending Schedule on MS excel
 Preparation of sub-contractors Bill.
 Preparation of Joint measurement sheet with client.
 Preparation of Running Bill of organization.
 Preparation of Daily Progress Report(DPR) of all site activities.

 Organization: VBB Infra Pvt. Ltd.


 Client-1 : KEC International Limited
 Client-2 : PMC
 Client-2 : RVNL
 Duration. : From March 2023 to Present
 Project Name : Construction of 3rdline from Tori (Chandwa) to Patratu, Jharkhand (Platform work, Pile Foundation
M Bed making).
 Role. : Site Engineer
 Responsibility:
 Coordinate with sub-contractors & Client Regarding execution of work.
 Planning of Work Day before work execution with client
 Execution of work on site as per Design/Drawings.
 Preparation of Bar Bending Schedule on MS excel
 Preparation of sub-contractors Bill.
 Preparation of Joint measurent sheet with client.
 Preparation of Running Bill of organization.
 Preparation of Daily Progress Report(DPR) of all site activities.

 Organisation : JAYNAM CONSTRUCTION


 Duration. : From April 2019 to June 2021
 Project Name : Sewage Line at Patna (NAMAMI GANGE)
 Role. : Site Engineer
 Responsibility:
 Coordinate with sub-contractors & Client Regarding execution of work.
 Planning of Work Day before work execution with client
 Execution of work on site as per Design/Drawings.
 Preparation of Bar Bending Schedule on MS excel
 Preparation of sub-contractors Bill.
 Preparation of Joint measurent sheet with client.
 Preparation of Running Bill of organization.