DATE :
TO :
FROM : PHIL HOLIDAY C. DELDA
Electrical Engineer
SUBJECT : Electrical Cost Labor
SCOPE OF WORKS:
Piping and layout of all electrical conduits.
Installation of the following devices:
- Panel Boards
- SPO (Special Purpose Outlet)ACU
- Lightings, Wall lamp, 3-way
- Convenience Outlets
- Electric Sub-Meter Installation
Circuit Breaker Installation and Termination for Panel Boards.
Continuity Testing and Energize
SPECIFIC LABOR FEES: PER (BUTAS) HOLE, (CONCRETE TYPE)
Panel Board Installation and Electric Sub Meter (P 500.00 each )
Lightings, Convenient Outlets and Wall lamp INCLUDING LAY-OUT
(Wire pulling, installation of electrical conduit, receptacles, wall
lamps, outlets and switches). ( P450.00 each)
Circuit Breaker (TERMINATION) (P400.00 each)
MDP Circuit Breaker TERMINATION (P400.00 each)
SPO (Special Purpose Outlet) ACU (P500.00 each)
3 Way Switch (P600.00)
TOTAL LABOR COST:
TERMS OF PAYMENT:
- 30% Payment Upon Approval.
- 70% Payable in weekly progress or percentage billing.
TERMS AND CONDITION:
- All work not specified under here shall be considered additional.
_________________________ __________________________
Electrical Engineer Client’s Signature