The document outlines the scope of electrical work including installation of conduits, panel boards, lighting, and circuit breakers, along with specific labor fees for each task. It details payment terms, requiring 30% upon approval and 70% payable weekly based on progress. Any additional work not specified will incur extra charges.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views2 pages

Contract Format

The document outlines the scope of electrical work including installation of conduits, panel boards, lighting, and circuit breakers, along with specific labor fees for each task. It details payment terms, requiring 30% upon approval and 70% payable weekly based on progress. Any additional work not specified will incur extra charges.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DATE :

TO :

FROM : PHIL HOLIDAY C. DELDA


Electrical Engineer
SUBJECT : Electrical Cost Labor
 SCOPE OF WORKS:
 Piping and layout of all electrical conduits.
 Installation of the following devices:
- Panel Boards
- SPO (Special Purpose Outlet)ACU
- Lightings, Wall lamp, 3-way
- Convenience Outlets
- Electric Sub-Meter Installation
 Circuit Breaker Installation and Termination for Panel Boards.
 Continuity Testing and Energize
 SPECIFIC LABOR FEES: PER (BUTAS) HOLE, (CONCRETE TYPE)
 Panel Board Installation and Electric Sub Meter (P 500.00 each )
 Lightings, Convenient Outlets and Wall lamp INCLUDING LAY-OUT
(Wire pulling, installation of electrical conduit, receptacles, wall
lamps, outlets and switches). ( P450.00 each)
 Circuit Breaker (TERMINATION) (P400.00 each)
 MDP Circuit Breaker TERMINATION (P400.00 each)
 SPO (Special Purpose Outlet) ACU (P500.00 each)
 3 Way Switch (P600.00)

TOTAL LABOR COST:

 TERMS OF PAYMENT:
- 30% Payment Upon Approval.
- 70% Payable in weekly progress or percentage billing.
 TERMS AND CONDITION:
- All work not specified under here shall be considered additional.