0% found this document useful (0 votes)
31 views3 pages

Sannan Ali CV

Sannan Ali is a Civil Engineer with four years of experience in infrastructure, gas pipeline, and high-rise building projects, skilled in project management and planning using tools like Primavera P6 and AutoCAD. His responsibilities include preparing and maintaining project schedules, tender documents, and progress reports, as well as analyzing project status and managing risks. He holds a Bachelor of Engineering in Civil Engineering from NUST, Pakistan, and has completed various skill development courses.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views3 pages

Sannan Ali CV

Sannan Ali is a Civil Engineer with four years of experience in infrastructure, gas pipeline, and high-rise building projects, skilled in project management and planning using tools like Primavera P6 and AutoCAD. His responsibilities include preparing and maintaining project schedules, tender documents, and progress reports, as well as analyzing project status and managing risks. He holds a Bachelor of Engineering in Civil Engineering from NUST, Pakistan, and has completed various skill development courses.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Sannan Ali

Planning Engineer
Kingdom of Saudi Arabia, Riyadh sannan.ali@outlook.com +966 53 6724 645

Profile Summary

Civil Engineer with Four (4) years of comprehensive work experience on Infrastructure, Gas Pipeline,
and high-rise building projects. Demonstrated history of contributing to project management, planning,
scheduling, and monitoring and controls with proficiency in Primavera P6, AutoCAD, MS Office applications
and a bachelor’s degree (B.Eng.) in Civil Engineering.

Major Responsibilities

• Preparation and maintenance of cost and resource loaded baseline schedule covering engineering,
procurement, construction, and pre-commissioning phases of a project.
• Preparation of tender documents including tender schedule, resource histogram, cashflow etc. as
required in the acquisition of projects.
• Participate in preparation and submission of all extension of time claims and corresponding revised
schedules.
• Set up and update of internal and external reports such as weekly, monthly project status report,
dashboards and look ahead schedules.
• Analyze, evaluate, and forecast current project status against the baseline schedule and report to the
company management and client as required.
• Flag any issues or concerns to management to help reduce the probability and impact of any
schedule related risks.

Education

National University of Science and Technology (NUST), Pakistan


Bachelor of Engineering (B.Eng.) in Civil Engineering – Aug 2016

Skill Development Courses

• Lean Six Sigma Green Belt


• Certificate in Primavera P6 – Advanced,
• Deeply Practical Project Management Certificate, PMP Instructor William Stewart
• Occupational Health & Safety training workshop, NUST, Pakistan
Work Experience

Ansab General Contracting Company October 2021 – Feb 2022


Al Rabwa Land Development Project ( Planning Engineer )

Duties & Responsibilities

• Preparing project reports on a Weekly, Bi-Weekly and Monthly basis which included dashboard, work progress,
schedule update, look ahead plans, earned value and budget status etc.
• Preparation of tender documents including tender schedule, resource histogram, cashflow etc. as required in the
acquisition of projects.
• Preparing and updating Baselines Schedules with resource and cost loading as per the requirements of the
Consultant/PMO/Client.
• Attend internal and external meetings to discuss and present matters related to schedule and project progress.
• Prepare internal project status reports for company’s higher management.
• Utilize earned value management techniques to evaluate schedule and cost performance metrics.

Wadi Al Bujaidi Contracting Company March 2020 – Sept 2021


King Saud University Building 13 Project ( Planning Engineer )

Duties & Responsibilities

• Prepared and maintained the project schedules for the total scope of work of WBC on the ongoing projects of the
company including RSFLAC 3 Bases Expansion project, KSU Building 13 project etc.
• Preparing weekly progress reports and look ahead schedules for the ongoing projects.
• Involved in preparation of extension of time claims for the delays caused on the projects specifically due to
COVID19.
• Preparing tender schedules for the company’s proposals for acquisition of new projects as required.
• Created the Project Baseline schedule with cost and resource loading, for the total scope of work which included
civil, MEP and fit out works.
• Monitoring the progress of work on site as well as the procurement and engineering activities daily.
• Preparing Daily, Weekly and Monthly reports of the project’s work progress and cost.
• Prepared extension of time claims for the delay on the project due to change in design and specifications.
• Updating the project schedule on a weekly basis and informing the team regarding any delays in procurement,
engineering, or construction activities to ensure the milestones are reached on time.

International Union Contracting Est. October 2018 – Dec 2019


ARAMCO Free Flow Pipeline Systems Package 5, Haradh ( Planning Engineer )
Duties & Responsibilities

• Prepared and maintained the schedule for the total scope of work of IUC on FFPS package 5 which included
precast, earthwork and security fence installation works.
• Monitored and reported work progress to the main contractor as per the project schedule and forecast for future
progress.
• Managed and administered work through foremen and subcontractors as per the schedule and quality
requirements.
• Prepared RFI documents and conducted quality control inspection with the main contractor’s QC inspectors daily.
• Calculated the total scope of work for FFPS 05 package including, quantity of precast and cast in situ
foundations, concrete and rebar quantity and material quantity for security fence works.
Awtad al-Akaria Company Aug 2017 – Aug 2018
Majdoul Tower Project, Riyadh ( Planning Engineer )
Duties & Responsibilities
• Prepared the site plan in compliance with project drawings, specifications, target dates and definitive estimate.
• Prepared and updated project schedule based on the contract.
• Set work program and target milestones for each phase based on the project plan.
• Monitored critical activities based on the project schedule and advise project management.
• Prepare and submit updated work program and cash flow curve showing actual progress and identify areas of
weakness and establish methods for recovery, if required, as well as new critical activities.
• Monitored day to day work progress and prepare the daily, weekly, and monthly report.
• Reported to the project manager about the current work progress and make comparison between plan and actual
progress and study impact of alternative approaches to work.
• Supervised the construction activities (Gas Turbine, Steam Turbine, GIS Building, Transformers, HRSG, Stacks).
• Checked plans, drawings, and quantities for accuracy of calculations.

REFERENCES
Available on request

You might also like