RUIRU
RUIRU
NOTES
GENERAL
1. All measurements are shown in millimeters.
Measurements should not to be scaled off the drawing.
2. The contractor must check and verify all dimensions
before commencing any work. Any discrepancy must
be notified to the architect.
3. All sections should be read as per the floor plan and
all discrepancies must be notified immediately to the
designer and clarified by consulting the respective
consultants' drawings.
CONSTRUCTION
4. Damp proof course must be provided under all
D-1
external walls at grade. DPC to be minimum 150mm
above ground level.
3,750
3,800
5. All slab at grade to be poured on 1000gauge
A
200
200
polytheneon 50mm stone dust blinding on compacted
TO MANHOLE
Dampness
and hairline MAIN ENTRY hardcore.
cracks, 6. All soils under slab and around external foundation
DOWN
concrete to be treated for termite control.
wall 7,650
7. Window cills must be finished before internal
3,400
16
17
18
19
20
21
22
23
24
25
26
27
28
3,050
15 plastering.
11
14
13
12
10
1
B CIVIL
8. All soils on cut embankment to be stabilized. The
28R x 150
UP
27G x 323
200
200
C cracks on
LOBBY STRUCTURAL
concrete wall
adjacent to Emergency 1,500 9. All RC works to Structural Engineer's details.
8,300
8,300
D-2
1,825
D-07
stairs Exit 3,000
10. Depth of foundation to be determined on site to
SE approval.
11. All walls less than 200mm thick to be reinforced
200
with hoop iron at every alternate course.
4,175
DS-2
DS-4
700
DS-3
5,300
MECHANICAL
200
12. All plumbing and drainage to comply with the
RECEPTION COUNTER relevant approving local authority's specifications.
1,250
D-08 13. All service ducts to be accessible from all floors.
14. Deep seal or anti-vac to all fittings connected to the
E-22
SVP's or waste pipes. All bends and junctions to have
100
100
100 100 100 100 200
DS-1 1,850 2,900 2,900 1,650 3,700 inspection plates.
750
15. SVP to be provided at the head of the drainage.
100 16. Drain pipes passing beneath buildings and
100
D cracks on Cracks driveways to be encased in 150mm concrete surround.
600
01
concrete observed on
wall 04 IE-15 02 concrete wall 17. All underground foul and waste drain pipes shall be
CONSULTATION CONSULTATION UPVC and comply to BSS 4514 and 5255. cast iron to
ROOM ROOM 03
4,275
4,275
comply to BSS 497 table 6 grade C except ones in the
1,575
Nurse driveway which shall comply to BSS 556.
3,300
3,300
assessment 18. All inspection chamber covers and frames shall be
PHARMACY
area cast iron to comply to BSS 497 table 6 grade C or
equivalent.
600
200
1,553 600 1,550
D-3 D-3
19. Storm water drain shall comply to BSS 556.
150
1,050
1,050
2,100
1,050
2,100
D-3
2,100
20. Minimum slopes to drains shall be 1%.
E 21. No chasing will be allowed in the slabs for pipes.
100
100
100
100
100 100 100 100 200
Sleeves will be allowed in the slabs with the written
7,450
E-08
E-07
D-05
22. All testing of pipes must be completed before
plastering.
35,950
3,000
3,000
WAITING
D-06
E-01
3,750
D-3
NURSE STATION 2,100
E-05
100
100
7,550
with mechanical works. Any conflicts must be clarified
before work begins.
G
FIRE
3,000
3,000
OUTPATIENT DEPT. 3
26. Instal water ring main with fire hydrant with 2.5"
1,050 instantaneous coupling adaptors.
D-3
2,100 E-02
A-A 27. Provide underground water tank with automatic
KIDS' PLAY WAITING WAITING
3,775
E-03
AREA 28. Provide automatic push button fire alarm system.
29. Provide heat and smoke detectors in each
100
100
E-04
room provide 9kg dry powder fire extinguishers to ME
specifications.
E-01
Concrete
100
3,000
3,000
OUTPATIENT DEPT. 4
7,650
D-32
cracks
1,900
1,499
2,100
1,900 5,900
100
H
100
100
CAFE 1,050
OUTPATIENT DEPT. 5
D-3
3,550
3,551
cracks on
3,980
2,100
concrete
wall
I
450 100
1,350 3,700 Architect
POWER MAIN DISTRIBUTION BOARD
100
J P.O. Box 41674-00100
D-09 100 200 150 200 Allimex Plaza. Suite 302
1,900 5,600 3,300 2,150 Mombasa Road . NAIROBI
1,900
1,900
01 1,000
2,100
04 IE-13 02
2,100 FEMALE visible
150
E-23
HC D-3 1,000
100
D-3
1,798
200
200
4,300
consultants' drawings.
CONSTRUCTION
4. Damp proof course must be provided under all
external walls at grade. DPC to be minimum 150mm
above ground level.
5. All slab at grade to be poured on 1000gauge
A cracks on A polytheneon 50mm stone dust blinding on compacted
cocrete hardcore.
walls
100 200 DN 6. All soils under slab and around external foundation
DOWN
3,650 to be treated for termite control.
STAIRCASE 7. Window cills must be finished before internal
16
17
18
19
20
21
22
23
24
25
26
27
28
plastering.
3,300
15
Dental
11
14
13
12
10
1
B B CIVIL
Dental UP
28R x 150
8. All soils on cut embankment to be stabilized. The
UP
27G x 323
D-8 D-8
slope is not to exceed the natural angle of repose of the
1,050
2,100
1,050
2,100
soil.
C C
100
STRUCTURAL
2,700
1,050
9. All RC works to Structural Engineer's details.
D-8
2,100 PASSAGE Storage 1,500
D-20
PASSAGE PASSAGE
10. Depth of foundation to be determined on site to
D-2
D-04
100 100 100 200 2,700
2,150
D-3 D-01
2,900 2,250 2,600 3,950 SE approval.
1,200
2,700
D-8 11. All walls less than 200mm thick to be reinforced
100
1,050
2,400
with hoop iron at every alternate course.
200
PASSAGE
D-4
100 PASSAGE 100 230
100
950
1,000 PASSAGE 1,000
900
2,100
D-3
D-3
1,250
2,100 11,450 2,100 3,450 MECHANICAL
12. All plumbing and drainage to comply with the
75
ADMIN. OFFICE relevant approving local authority's specifications.
1,000
2,100
100 50 100 50 75 1,000
1,050
13. All service ducts to be accessible from all floors.
D-3
800 1,675 800 1,675
D-8
3,400
3,300
2,100 2,100
1,450
1,450
male locker
Planter
800 female locker D-3
01 14. Deep seal or anti-vac to all fittings connected to the
D-5
800 room 01
room
E-22
D-5
2,100
3,450
2,400
01 2,100 Call Center SVP's or waste pipes. All bends and junctions to have
2,425
1,050
DIETICIAN 04 IE-12 02
D-8
04 IE-09 02
04 IE-08 02
2,100
inspection plates.
50
50
Consult WAITING 75 100 75 75 server room 03
LOBBY 1,800 650 1,800 650 1,800
D-3
STORE 03 15. SVP to be provided at the head of the drainage.
2,100
2,100
1,000
2,100
800
800
925
925
Storage/Printer 16. Drain pipes passing beneath buildings and
D-5 D-5
D D driveways to be encased in 150mm concrete surround.
100
100
100
PASSAGE 17. All underground foul and waste drain pipes shall be
700
100
01 1,000 UPVC and comply to BSS 4514 and 5255. cast iron to
D-7
1,350
WAITING 2,400
comply to BSS 497 table 6 grade C except ones in the
04 IE-11 02
LOBBY
600
driveway which shall comply to BSS 556.
Planter
700 600 1,500 600 700
OPTICAL OPTHAL 01
03
DISPLAY BOARD 18. All inspection chamber covers and frames shall be
3,200
3,200
OPD
600
ROOM cast iron to comply to BSS 497 table 6 grade C or
equivalent.
1,420
ECG
3,400
D-19
Consult 1,050 100 100 100 100 100 100 100 230
19. Storm water drain shall comply to BSS 556.
D-8
1,350
1,050
2,100
1,050
2,100
1,000
2,400
E E
6,070
21. No chasing will be allowed in the slabs for pipes.
600
02
100
100
D-22 Sleeves will be allowed in the slabs with the written
E-20
approval of the Structural Engineer.
E-21
E-08
E-07
D-8
100
2,100
1,450
plastering.
OBSERVATION
ROOM 23. All mechanical works must be co-ordinated with
E-01
03
electrical works. Any conflicts must be clarified before
PASSAGE
600
work begins.
E-05
WAITING
E-06 LOBBY WAITING cracks on ELECTRICAL
3,450
Planter
cocrete walls
700
LOBBY 24. All conduits must be laid before plastering.
F Planter Planter F 25. All electrical work must be co-ordinated
230
15
cracks at
CEILING
concrete with mechanical works. Any conflicts must be clarified
700
ACCESS joint before work begins.
7,300
7,300
D-03 01
HATCH
G G
Planter
04 IE-07 02 FIRE
600
structure cracks 03 26. Instal water ring main with fire hydrant with 2.5"
on cocrete beam
instantaneous coupling adaptors.
E-02 27. Provide underground water tank with automatic
1,350
A-A X-X
electric booster pump for ring main.
XRAY
E-03
750 1,560 1,550 750
5,900
LOBBY 29. Provide heat and smoke detectors in each
600
200 230 230
E-04
2,100
3,550 4,600 10,300 4,690 room provide 9kg dry powder fire extinguishers to ME
specifications.
E-01
D-02
NURSE
1350
STATION
100
100
Planter Revision History
600
800
851
600
cracks
1,800
1,050
D-8
on joint
2,400
2,100
600
POC
900
concrete concrete
700
1,000
D-3
D-3
WAIT 2,100 wall crack
230
01
H H
2,650
100
4,000
Lab
1,401
ULTRASOUND
04 IE-10 02
Workspace 1,050
D-8
1,100
1,000
1,401
03 2,100
D-3
1,000
D-3
2,100
2,100
POC
100
MAMMO
600
150
D-3
3,470
D-3 930 600 1,890 600 900
600
1,000
2,400
750
1,000
2,100
1,000
2,100
700
COR - Alvo
851
Stuhl mit Drahtgestell
66 x 63 x 87 cm
100
2,100
150 150 100 100 200 230
150
150
600
I I
1,900
SAMPLE
2,400 1,900 2,700 3,400 4,000 4,920
1,469
1,100
1,000
COLL PAT Architect
D-3
750
TLT
GRAND ARCH STUDIO
2,150
200
200
200
150
staircase
soffit
2,100 MALE wall tiling Mombasa Road . NAIROBI
1,800
D-3
2,100
1,000
Signature................... Date...................
D-3
2,100
200
E-24
E-23
2,700
HC 1,000
D-3
200
Signature........................ Date.......................................
Drawing Title: Drawing No.
FIRST FLOOR PLAN 04