0% found this document useful (0 votes)
48 views29 pages

Archi Drawings

The document outlines the proposed standard drawings and materials for a two-classroom block with an office in Tanzania, detailing the quantities and specifications of various construction materials required. It includes a comprehensive schedule of materials, labor, and architectural drawings necessary for the project. The document is intended for use by the Ministry of Education and the President's Office for the development of school facilities.

Uploaded by

pitambar7823
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views29 pages

Archi Drawings

The document outlines the proposed standard drawings and materials for a two-classroom block with an office in Tanzania, detailing the quantities and specifications of various construction materials required. It includes a comprehensive schedule of materials, labor, and architectural drawings necessary for the project. The document is intended for use by the Ministry of Education and the President's Office for the development of school facilities.

Uploaded by

pitambar7823
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

THE UNITED REPUBLIC OF TANZANIA

PRESIDENT’S OFFICE
REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT

PROPOSED STANDARD DRAWINGS FOR SCHOOL FACILITIES.

Schedule of Materials, Labour & Drawings for Two Classroom with


Office Block – Gable

PROJECT AREA

TANZANIA MAINLAND

Ministry of Education, Science and President‘s Office,


Technology, Regional Administration,
& Local Government
Government City - Mtumba, Government City - Mtumba
AFYA -Street, TAMISEMI Street,
P. O. Box 10, P. O. Box 1923,
40479 DODOMA. 41185 DODOMA.

NOVEMBER, 2022 (REVISED 1) PO-RALG


Schedule of Material
SCHEDULE OF MATERIALS TWO CLASSROOM BLOCK WITH OFFICE GROSS FLOOR AREA =187 SQ.M
ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT
MATERIALS

A SUB-STRUCTURE -PROVISIONAL

1 Strip Foundation - Grade 15 Plain


Aggregate (3/4'') 12 M3
Sand 6 M3
Cement-50kgs (42.5) 60 Bags

2 Foundation Walls
6'' Cement & Sand block - Minimum Strength 3. 5 MPa 1,246 No
Sand 4 M3
Cement -50kgs (42.5) 21 Bags
3 Moram, Hardcore & Site sterilization
Moram (4.5m3 lorry) 9 Trips
Hardcore 200mm thick - (4.5m3 lorry) 9 Trips
Sand 9 M3
Aldrin solution or other and equal approved (1000mls) 2 Bottle

Oversite Concrete 100mm thick - 15 grade ,Ground Beam and


4 base column - 20 grade
DPM 186 M2
Cement -50kgs (42.5) 130 Bags
Aggregates (1/2'') 11 M3
Sand 21 M3
Reinforcement - 12mm diameter high tensile 460N/mm2 38 PC'S
Reinforcement - 8mm diameter high tensile 460N/mm2 40 PC'S
Binding Wire - 25kg 10 Kg
Timber 1'' X 10 '' (5.2m long) 14 PC'S
Timber 2'' X 2'' 10 PC'S
Nails-4'' 10 Kgs
Nails-3'' 13 Kgs
Supporting props 12 PC'S
SUB-TOTAL SUBSTRUCTURE
B. SUPERSTRUCTURE
1 Walls Ring beam & Columns
6'' Cement & Sand block - Minimum Strength 3. 5 MPa - 230mm 2,380 No
6'' Cement & Sand block - Minimum Strength 3. 5 MPa- 150mm 396 No
DPC 25m 1 Roll
Sand 12 M3
Cement-50kgs (42.5) 93 Bags
Aggregates (1/2'') 4 M3
Reinforcement - 12mm diameter high tensile 460N/mm2 30 PC'S
Reinforcement - 8mm diameter high tensile 460N/mm2 31 PC'S
Binding Wire - 25kg 10 Kg
Timber 1'' X 10'' to Sides (5.2m long) 17 PC'S
Timber 1'' X 5'' (Plates) 5 PC'S
Timber 2'' X 2'' 12 PC'S
Supporting Props 12 PC'S
SUB-TOTAL SUPER STRUCTURE

NOVEMBER 2022 (REVISED 1) Page/1 PO-RALG/MoEST


SCHEDULE OF MATERIALS TWO CLASSROOM BLOCK WITH OFFICE GROSS FLOOR AREA =187 SQ.M
ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT

C. ROOF STRUCTURE & COVERING

1 Roof Structure - Provisional


Timber 2 '' X 3'' Purlins 57 PC'S
Timber 2'' X 4'' King Post, wall plate and struts 80 PC'S
Timber 2'' X 6'' Rafter and Tie beam 68 PC'S
Fascia board 1'' X 10'' -ref. Semi Hardwood (5.2m long) 15 PC'S
Nails -5'' 45 Kgs
Nails -4'' 45 Kgs
Nails -3'' 25 Kgs
16mm diameter bolt 34 Pc's

NOTE: The above softwood timber structure should be pressure


impregnated treated

2 Roof Covering
28G IT5 resin coated sheet size 3000x900mm 120 PC'S
Hips/Ridge and valley - 28 G IT resin coated 10 PC'S
Roofing Nails 27 Packet

3 Gutter's
Upvc 100mm half round (6m long)-5'' 12 PC'S
Upvc 75mm diameter down pipe; Class B 3 PC'S
PVC outlet 4 PC'S
PVC bend 90' 4 PC'S
PVC bend 45' 4 PC'S
Gutter support bracket 62 PC'S
Gutter Clamp 3'' 17 PC'S
Connector/reducer 4 PC'S
Connector outer 4 PC'S
Corner Inner 4 PC'S
Water storage tank; 5000 litres capacity with dust and insect proof lid;
20mm 3Nr tank connectors; 25mm 1Nr wash - out tank connector; 20mm
high pressure ball float operated stop valve; all connections to IPS

2 PC'S
SUB-TOTAL ROOF STRUCTURE & COVERING

D. CEILING
Gypsum board -9mm thick 65 PC'S
Plain Cornice (8ft) 53 PC'S
Screw 1.25'' 500pcs/box 3 Box
Gypsum powder 12 Bags
Fiber tape (90m) 2 Roller
Treated softwood Timber 2'' X 2'' 122 PC'S
Nails 4'' 14 Kgs
Nails 3'' 20 Kgs

SUB-TOTAL FOR CEILING

NOVEMBER 2022 (REVISED 1) Page/2 PO-RALG/MoEST


SCHEDULE OF MATERIALS TWO CLASSROOM BLOCK WITH OFFICE GROSS FLOOR AREA =187 SQ.M
ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT
E. DOOR
1 40mm thick hardwood Matchboarded door shutter
820 x 2100mm high 3 PC'S

2 45 x 145mm Frames (hardwood) & Varnish


900 x 2500 mm high door frame 3 PC'S
5mm thick clear glass to Vents 1 m2
16mm diametere burglar bars -1100mm long 9 Pcs
Brush 3'' 3 Pcs
Sand paper (msasa) No.80 3 LM
Clear Varnish - 4Litres 1 TIN
Thinner for Varnish 3 Litres

3 Ironmongeries - ref. Union


Mortice lock Three lever 3 No
Brass butt hinges - 100mm 4.5 Pairs
SUB-TOTAL FOR DOORS
F. WINDOWS

1 Aluminium sliding Window comprising 100mm x 1.2mm thick


standard aluminium profile ex-china/Turkey infill with 5mm
thick glass complete with mosquito proofing panel, including
all accessories, ironmongeries, cutting and pinning lugs

1500 X 1500mm high 11 PC'S


1100 X 1500mm high 1 PC'S

2 25 x 4mm thick flat bar grill painted red-oxide with 25 x 25mm


square pipes frame and all necessary accessories
1500 X 1500mm high 1 PC'S
1100 X 1500mm high 1 PC'S

SUB-TOTAL FOR WINDOWS


G. FINISHING

1 Floor finishing
Bedding/Backing; cement sand and Chipping (1:2:2); to steel
finishing

40mm Thick granolithic floor screed steel toweling to smooth


finishing
Sand 10 M3
Cement-50kgs (42.5) 65 Bags
Chipping 15 M3
2mm thick plastic Strips 233 M
2 Wall Finishing-15mm thick (1:4)
Sand 13 M3
Cement-50kgs (42.5) 82 Bags
Sand paper (msasa) No.120 11 M
White cement - 40kg 5 Bags
Gypsum powder 11 Bags
SUB-TOTAL FOR FINISHING

NOVEMBER 2022 (REVISED 1) Page/3 PO-RALG/MoEST


SCHEDULE OF MATERIALS TWO CLASSROOM BLOCK WITH OFFICE GROSS FLOOR AREA =187 SQ.M
ITEM DESCRIPTION QTY UNIT PRICE-TZS AMOUNT
H. PAINTING & DECORATION
Emulsion Paint - 20 LTRS 9 buckets
Weather guard Paint - 20 LTRS 3 buckets
Washable paint -20 LTRS 4 buckets
Primer paint -20 LTRS 2 buckets
Solvent - 5LTRS 2 TIN
Brush 3'' 4 Pcs
Roller 4 Pcs
Gloss paint-4LTR 3 TIN
Bitumen paint - 4Litres 4 TIN
SUB-TOTAL FOR PAINTING&DECORATION
J. BALUSTERS & HANDRAIL
Supply and fix steel balustrade overall height 900mm high,
comprising 50mm diameter hollow section mild steel pipe top and
bottom rail, 38mm diameter intermediate rails, 50mm diameter
vertical rails 900mm high spaced at interval of 450mm centres
to centres including all bolts, plates and associated accessories
and welded works, red oxed and painted as per
architectural drawing to the aproval of Project Surpervisor. 18 m
SUB-TOTAL BALUSTERS & HANDRAIL

K. ELECTRICAL INSTALLATION
Single fluorescent fitting Complete,LED philips or other equal 22 No
approved
Double switch socket ABB or other equal approved 8 No
Main switch 6way,1PH with integral RCD 100A/300mmA ABB other
equal approved 1 No
NB: Cables for 1.5sqmm 2.5sqmm and 4sqmm should be EURO
or other equal approved
Single core wire 1.5sqmm - Red 2 Roll
Single core wire 1.5sqmm - Black 2 Roll
Single core wire 1.5sqmm -green 2 Roll
Single core wire 2.5sqmm - red 1 Roll
Single core wire 2.5sqmm 1 Roll
Single core wire 2.5sqmm green 1 Roll
Ceiling fan National or other equal approved 14 PC's
3gang 1 way switch ABB or other equal approved 4 No
2gang 1 way switch ABB or other equal approved 3 No
Earth rod approved copper 16mm not less than 1200mm 1 No
Earth wire 4sqmm 20 M
Metal box twin 8 No
Metal box single 7 No
Junction box 20 No
Conduit pipe 120 PC's
Elbow 20 PC's
Conduit coupling 20 PC's
Round cover 10 PC's
Round box 10 PC's
Fine screw 2 PACKET
plastic clips 22mm 2 BOX
Bulk head light fitting 4 PCS
ELECTRICAL INSTALLATION
NOVEMBER 2022 (REVISED 1) Page/4 PO-RALG/MoEST
SCHEDULE OF MATERIALS TWO CLASSROOM BLOCK WITH OFFICE GROSS FLOOR AREA =187 SQ.M

SUMMARY AMOUNT
TZS
2NO. CLASSROOM BLOCK WITH OFFICE

A. SUB-STRUCTURE -PROVISIONAL

B. SUPERSTRUCTURE

C. ROOF STRUCTURE & COVERING

D. CEILING

E. DOOR

F. WINDOWS

G. FINISHING

H. PAINTING & DECORATION

J. BALUSTERS & HANDRAILS

K. ELECTRICAL INSTALLATION

TOTAL BUILDING MATERIALS CARRIED TO GENERAL SUMMARY

ADD:

LABOUR COST CARRIED TO GENERAL SUMMARY : (Improve and Fill the respective Labour form)

Note:
i. Refer attached specification and number of Furniture(s) for two classroom with office Block
ii. Refer General Summary for: Preliminary, Transportation and Supervision Costs
iii. Preliminary cover the following item:
- Setting out working tools, Equipments, Temporary toilets, water for the works, Scaffolding,
- Power for the works, Security, store, Materials test, levelling, holdings and removal of rubbish.
iv. Supervision cost depend on guideline of the specific project
v. Installation of Ceiling Fan is an option, depend on whether condition of specific area .

NOVEMBER 2022 (REVISED 1) Page/5 PO-RALG/MoEST


THE UNITED REPUBLIC OF TANZANIA

MINISTRY OF EDUCATION SCIENCE AND TECHNOLOGY

IN COLLABORATIONS WITH

PRESIDENT'S OFFICE, REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT

PROVISION OF PHYSICAL FACILITIES IN PRIMARY SCHOOLS

Ministry of Education, Science and Technology President's Office, Regional Administration


Government City-Mtumba, and Local Government.
Afya Street, Government City-Mtumba,
P.O. Box 10, TAMISEMI Street,
40479 DODOMA P.O. Box 1923,
JANUARY, 2023 41185 DODOMA
ARCHITECTURAL DRAWINGS
24,000
88,087 50,000

18,271
770

135 0
10,050 12,650 771

VOLLEY BALL PITCH

4,150
27,000
NORTH 12,650 771

45,623

4,150
12,650 771

4,150
12,650 771

BOYS TOILET
GIRLS TOILET
FOOTBALL PITCH
W-01 W- 01 W-01 W- 01 W-01
W-01 W-01 W-01 W-01 W-01 W-01 W-01 W-01 W-01 W- 01 W-01 W-01 W- 01 W-01 W-01 W- 01 W-01 W-01

54,351

7,430
26,000
4th stream
CLA
CLA
SSROOM
SSROOM CLASSR
CLASSROO
OO
MM CLA
CLA
SSROOM
SSROOM
CLA
CLA
SSROOM
SSROOM CLASSR
CLASSROO
OO
MM CLA
CLA
SSROOM
SSROOM
CLASSROOM OFFICE CLASSROOM CLASSROOM OF FICE CLASSROOM

W-01 W-01 W-02 W-01 W-01 W- 01 W-01 W- 01 W-01 W- 01 W-01 W-02 W- 01 W-01
D
- 01 D
- 10 D
- 01 D
-0 1 D
-0 1 D
-0 1
D
-0 1 D
-0 1 D
-0 1

W- 01 W-01
RAM P ( SLO PE 1 0% ) RA MP ( S LO PE 10% )

VERR ANDAH VERRANDAH


VERR
VERRA
VERR
VERR ND
AND
AAND
NDAH
AH
AH
AH
up up up up up up up up up

21,230 6015 27,230 6015 21,230

15,000
18,820 39,835 15,000

W-01 W- 01 W-01 W- 01 W-01

BASKETBALL PITCH
W-01 W-01 W-01 W-01 W-01 W-01 W-01 W-01 W-01 W- 01 W-01 W-01 W- 01 W-01 W-01 W- 01 W-01 W-01

7,430
3rd stream
CLA
CLA
SSROOM
SSROOM CLASSR
CLASSROO
OO
MM CLA
CLA
SSROOM
SSROOM
CLA
CLA
SSROOM
SSROOM CLASSR
CLASSROO
OO
MM CLA
CLA
SSROOM
SSROOM
CLASSROOM OFFICE CLASSROOM CLASSROOM OF FICE CLASSROOM

W-01 W-01 W-02 W-01 W-01 W- 01 W-01 W- 01 W-01 W- 01 W-01 W-02 W- 01 W-01
D
- 01 D
- 10 D
- 01 D
-0 1 D
-0 1 D
-0 1 D
-0 1 D
-0 1 D
-0 1

W- 01 W-01
RAM P ( SLO PE 1 0% ) RA MP ( S LO PE 10% )

VERR ANDAH VERR


VERRAND
AND
ND
AH
AH VERRANDAH
VERR
VERRAA
NDAH
AH
up up up up up up up up up

15,000
43,373
27,000

W- 01 W-01 W- 01 W-01 W-01

W-01 W-01 W-01 W-01 W-01 W-01 W-01 W-01 W- 01 W-01 W-01 W-01 W- 01 W-01 W-01 W- 01 W-01 W-01

7,430
2nd stream
CL
CL
ASSROOM
ASSROOM CLA
CLA
SSROOM
SSROOM CLA
CLA
SSROOM
SSROOM
CL
CL
ASSROOM
ASSROOM CLA
CLA
SSROOM
SSROOM CLA
CLA
SSROOM
SSROOM
CLASSROOM OFFICE CLASSROOM
CLASSROOM OF FICE CLASSROOM

D
- 01
W-01 W-01 W-02 D
- 10
W-01 W-01 D
- 01 D -0 1
W-01 W-01 D -0 1
W-01 W-01 D -0 1 D
-0 1
W- 01 W-01 D
-0 1
W-02 W- 01 W-01 D
-0 1

W-01 W-01
RAM P ( SLO PE 1 0% ) RA MP ( S LO PE 10% )

VERR ANDAH
VERR
VERRA
VERR
VERR NDA
ANDA
AANDA
NDAHH
HH VERRANDAH

up up up up up up up up up

15000
VIP STAND

W-01 W- 01 W-01 W- 01 W-01


W-01 W-01 W-01 W-01 W-01 W-01 W-01 W-01 W-01 W- 01 W-01 W-01 W- 01 W-01 W-01 W- 01 W-01 W-01

7,430
36,835 18,000
1st stream
CLA
CLA
SSROOM
SSROOM CLASSR
CLASSROO
OO
MM CLA
CLA
SSROOM
SSROOM
CLA
CLA
SSROOM
SSROOM CLASSR
CLASSROO
OO
MM CLA
CLA
SSROOM
SSROOM
CLASSROOM OFFICE CLASSROOM CLASSROOM OF FICE CLASSROOM

D
- 01
W-01 W-01 W-02 D
- 10
W-01 W-01 D
- 01 W- 01 W-01 W- 01 W-01 D
-0 1
W- 01 W-01 D
-0 1
W-02 W- 01 W-01 D
-0 1
D
-0 1 D
-0 1 D
-0 1

33,000
W- 01 W-01

RAM P ( SLO PE 1 0% ) RA MP ( S LO PE 10% )


VERR ANDAH VERRANDAH
VERR
VERRAND
AND
ND
AH
AH
VERR
VERRAA
NDAH
AH
up up up up up up up up up

RAM P ( SLO P E 10% )

RAM P ( SLO PE 1 0% )
PRE PRIMARY SCHOOL

16,430

6,320
PARADE GROUND

37400

8,330
CLASS RO OM CLASS RO OM
84,379

NETBALL PITCH RAMP


RAMP
RAMP
RAMP ANDING UP
LLANDING
LLANDING
ANDING UP
UP
UP
VER R ANDAH
UP
UP LLANDING
UP
UP LLANDING
ANDING
ANDING RAMP
RAMP
RAMP
RAMP

14,650
9,925
TO ILET GIRL S
16,350 10,000 TO ILET BOY S

VE
VE
RRANDAH
RRANDAH
SWING S WIN G
VE
VE
RRANDAH
RRANDAH
W-01 W- 01 W-01 W- 01
D -0 1 D
- 10
1250 MM BLOCK WALL F ENCE

1,500
SEAT

7,430
ENTRANCE
ENTRANCE
ENTRANCE
ENTRANCE
LOLOBBY
BBY SEC
SEC
OOND
ND
LOLOBBY
BBY SEC
SEC
OOND
ND
D -0 1 D
- 10
TEAC
TEAC
HHERER
TEAC
TEAC
HHERER

- 10
D

- 10
D
L
ADL
I
AEDI
SES GEG
NETN
STS

L
ADL
A
I D
EISES GEN
GTES
NT S

ENTRANCE
ENTRANCE

- 10
D
W- 10 W
- 10

W-02 ENTRANCE
ENTRANCE ST
SAFF
TAFFROOM
ROOM
D
- 10
CORRI
CORRI
CORRI
DOR
CORRI
DOR
DOR
DOR SS
TAFF
TAFFROOM
ROOM
SLIDE
STAFF
STAFFTOI
STAFF
TOI
STAFFTOI
TOI
LET
LET
LET
LET
HEAD
HEADTEAC
TEAC
HHERER SE
SE
CRETAR
CRETAR
YY
SLIDE
HEAD
HEADTEAC
TEAC
HHERER SE
SE
CRETAR
CRETAR
YY
ACADEM
ACADEM
IC
IC
ACADEM
ACADEM
IC
IC

845 ,1500 1,500 1,500 1,5 00 425


SLIDE SWING
W- 01 W-01 W- 01

W-01 W-01 W-01


SEAT

230
ENTRANCE
ENTRANCE
ENTRANCE
ENTRANCE RAM
RAM
PP
RAM
RAM
PP VER
VER
RAN
RANDAH
DAH RAM
RAM
PP
RAM
RAM
PP VER
VER
RAN
RANDAH
DAH
UP

ADMINISTRATION

5,000

5,000
6,000

6,000

6,000
PARKING PARKING

PARKING PARKING

16,620

5,000

5,000
2,650
SEMI DETACHED 3 BEDROOM STAFF HOUSE 27,000 3,000 6,000 3,000 48,000 5,044
20,020

8,400
8,325
8,325

8,400

19,875 19,968 19,950 20,000 19,950 19,968 19,950

REVISED 1

DRAWING TITLE:
Date December,
December, 2022
MINISTRY OF EDUCATION, SCIENCE AND TECHNOLOGY
IN COLABORATION WITH
PROVISIO OF PHYSICAL FACILITIES IN PRIMARY SCHOOLS SAMPLE SITE PLAN Drawn by IAS
PRESIDENT'S OFFICE REGIONAL ADMINISTRATION AND Checked by AAL
LOCAL GOVERNMENT PROPOSED STANDARD DESIGN FOR PRE PRIMARY SCHOOL CLASSROOMS
DRAWING NO: ARC/PPS/01 Scale To fit
CLASSROOM BLOCK TYPE A - 2 ROOMS WITH OFFICE
GABLE
WINDOW SCHEDULE

A
A B C D E F G H
WINDOW TYPE HEIGHT x WIDTH QUANTITY(S)

W1 1500mm x 1500mm 11
3,000 3,000 3,000 3,000 3,000 3,000 3,000
W2 1500mm x 1100mm 01

TOTAL 12

DOOR SCHEDULE

DOORTYPE HEIGHT x WIDTH QUANTITY(S)


21,230
D1 2500mm x 900mm 03
230 8,810 150 2,850 150 8,810 230
TOTAL 03

865 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 865

3 W-01 W-01 W-01 W-01 W-01 W-01 W-01


3

1,400

1,400
7,430

7,430

7,191
CLASSROOM OFFICE CLASSROOM
1000 Ltrs rain water
1000 Ltrs rain water harvest tank

harvest tank

W-01 W-01 W-02 W-01 W-01


2 2
D-01 D-01 D-01

1,500
1,500
1,500

RAMP (SLOPE 10%) VERRANDAH RAMP (SLOPE 10%)

1 1
up up up
1,165 900 1,800 1,500 1,500 1,500 865 900 770 1,100 865 1,500 1,500 1,500 1,800 900 1,165

230 8,810 150 2,850 150 8,810 230

21,230

A B C D E F G H

TOTAL FLOOR AREA = 189.6 SQM REVISED 1


:
MINISTRY OF EDUCATION, SCIENCE AND TECHNOLOGY DRAWING TITLE: Date December 2022
PROVISION OF PHYSICAL FACILITIES IN PRIMARY SCHOOLS
IN COLLABORATION WITH Drawn by IAS
FLOOR PLAN
PROPOSED 2- CLASSROOMS BLOCK WITH OFFICE - GABLED Checked by JR
PRESIDENT'S OFFICE REGIONAL ADMINISTRATION AND
DRAWING NO: ARC/2CRHO/01 Scale To fit
LOCAL GOVERNMENT
Roofing edge
21,310

230

230
7,510

Verrandah

230mm thick External Wall

REVISED 1
MINISTRY OF EDUCATION, SCIENCE AND TECHNOLOGY DRAWING TITLE: Date December 2022
PROVISION OF PHYSICAL FACILITIES IN PRIMARY SCHOOLS
IN COLLABORATION WITH Drawn by IAS
ROOF PLAN
PROPOSED 2- CLASSROOMS BLOCK WITH OFFICE - GABLED Checked by JR
PRESIDENT'S OFFICE REGIONAL ADMINISTRATION AND
DRAWING NO: ARC/2CRHO/02 Scale To fit
LOCAL GOVERNMENT
1 2 3
28G resin coated ridge cap

28G IT5 resin coated 50mm x 100mm struts


50mm x 75mm purlins placed 900 mm c/c.
50mm x 150mm soft wood Rafters.

50mm x 150mm Tie beam

300X230 mm R.C. beam

25mm x 250mm Fiscial board


9mm gypsum nailed up to ceiling support
50mm x 5omm soft wood brandering at
600 mm x 600mm c/c

BLACKBOARD door frame of 145 x 45 hardwood

VERANDAH
230mm thick external CLASSROOM
above floor slab

GL GL
230mm thick . wall 40 mm 1:2:2 cement, sand chipping 300x230mm ground beam to eng. details
below floor slab granolithich floor finishes

100mm Concrete slab


230X690mm concrete strip DPM 230X690mm concrete strip foundation to eng.
foundation to eng. details 200mm Hardcore details
Compacted earth

1 2 3
600mm diameter roof vent 600mm diameter roof vent
hollow protected with wiremesh hollow protected with wiremesh
TYPICAL SECTION

SIDE ELEVATION
SIDE ELEVATION

REVISED 1
MINISTRY OF EDUCATION, SCIENCE AND TECHNOLOGY DRAWING TITLE: Date December 2022
PROVISION OF PHYSICAL FACILITIES IN PRIMARY SCHOOLS
IN COLLABORATION WITH Drawn by IAS
TYPICAL SECTION - SIDE ELEVATIONS
Checked by JR
PRESIDENT'S OFFICE REGIONAL ADMINISTRATION AND PROPOSED 2- CLASSROOMS BLOCK WITH OFFICE - GABLED
DRAWING NO: ARC/3CRG/03 Scale To fit
LOCAL GOVERNMENT
REAR ELEVATION

FRONT ELEVATION

REVISED 1
MINISTRY OF EDUCATION, SCIENCE AND TECHNOLOGY DRAWING TITLE: Date December 2022
PROVISION OF PHYSICAL FACILITIES IN PRIMARY SCHOOLS
IN COLLABORATION WITH Drawn by IAS
FRONT & REAR ELEVATIONS
PROPOSED 2- CLASSROOMS BLOCK WITH OFFICE - GABLED Checked by JR
PRESIDENT'S OFFICE REGIONAL ADMINISTRATION AND
DRAWING NO: ARC/2CRHO/04 Scale To fit
LOCAL GOVERNMENT
ELECTRICAL DRAWINGS
3 L3

3 P1 3 P1 3 P2

230 230
3 L1 3 L2

3 P1
3 P1 3 P2
3 L3
3 L1 3 L2

3 P1

Office

3 L2
2 6 no's 2 2 2 6 no's
fan regulator 3 P1 fan regulator

DB 3
3 L3

REVISED 1:
DRAWN BY EEC
MINISTRY OF EDUCATION,SCIENCE AND TECHNOLOGY DRAWING TITLE:
IN COLLABORATION WITH CHECKED BY EEC
PRESIDENT'S OFFICE REGIONAL ADMINSTRATVE AND LOCAL GOVERNMENT
PROVISION OF PHYSICAL FACILITIES IN PRIMARY SCHOOLS TWO CLASSROOM BLOCK
FLOOR LIGHTING & POWER LAYOUT SCALE: NTS
DRAWING NO:P/EL/CR/03 DEC 2022

GSPublisherVersion 0.0.100.100
2CLASSROOMS & OFFICE DISTRIBUTION BOARD (DB-3)
W

1 3 x 1.5 PVC/Cu 8 Nos. LIGHTS & 6Nos FAN ( 3-L1) 544


10A
2 3 x 1.5 PVC/Cu 10 Nos. LIGHTS & 6Nos FAN (3-L2) 620
10A
3 228
3 x 1.5 PVC/Cu 6 Nos. LIGHTS (3-L3)
10A
4 3 x 2.5 PVC/Cu 6 Nos. 13A S/SOCKETS, 3-P1 900
32A
1000
5 SPARE
63A /300mA 32A
SPN RCD 6 1000
32A SPARE

4.3KW
TOTAL CONNECTED LOAD IN KW

6 WAY SPN DISTRIBUTION BOARD WITH MCBs


1 x 10 2 AND INTEGRAL 63A/300mA SPN RCD INCOMER
PVC / Cu 4Cx16mm PVC/SWA/PVC/Cu AS ABB or Approved Equal, FOR FLUSH MOUNTING
e.c.c

FROM TANESCO LV POLE

R EVISED 1:
MINISTRY OF EDUCATION,SCIENCE AND TECHNOLOGY IN
COLLABORATION WITH PROVISION OF PHYSICAL FACILITIES IN PRIMARY DRAWING TITLE: DRAWN BY EEC

PRESIDENTS OFFICE REGIONAL ADMINSTRATIVE AND LOCAL SCHOOLS TWO CLASSROOM BLOCK CHECKED BY EEC
SCHEMATIC LAYOUT SCALE: NTS
GORVENMENT
DRAWING NO: P/EL/CR/03 DEC 2022

GSPublisherVersion 0.0.100.100
KEY TO SYMBOLS

SYMBOL DESCRIPTION MOUNTING HEIGHT

Distribution Board with integral RCD 2000 mm AFFL

Bulkhead light Fitting Wall Mounted

4FT Single Electronic Start Fluorecent Light On Ceilling

Ceilling Fan On Ceilling

Fan Regulator 1500 mm AFFL

1 gang 1way Switch 1500 mm AFFL


2

1 gang 2way Switch 1500 mm AFFL

2
2

2 gang 2way Switch 1500 mm AFFL

3
3 gang 1way Switch

2
2 gang 1way Switch 1500 mm AFFL

4
4 gang 1way Switch 1500 mm AFFL
Twin Switch Socket 450 mm AFFL

C Ceilling light complete with energy saver 11w on level

MINISTRY OF EDUCATION,SCIENCE AND TECHNOLOGY IN DRAWING TITLE: DRAWN BY EEC


COLLABORATION WITH THREE CLASSROOM BLOCK CHECKED BY EEC
PRESIDENTS OFFICE REGIONAL ADMINSTRATIVE AND LOCAL PROVISION OF PHYSICAL FACILITIES IN PRIMARY LEGEND SCALE: NTS
GORVENMENT DEC 2022
SCHOOLS DRAWING NO: P/EL/CR/03

GSPublisherVersion 0.0.100.100

You might also like