The document is an application for prior environmental clearance for the proposed commercial cum residential project 'Jyothi Urbis' by M/S. Vamsiram Builders in Hyderabad, Telangana. It includes basic information about the project, its location, public consultation details, and environmental impact assessments related to construction activities. The project aims to construct a commercial building with a built-up area of 55,910.8 square meters and does not involve any hazardous substances or significant environmental risks.

Uploaded by

rathi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views10 pages

Report

The document is an application for prior environmental clearance for the proposed commercial cum residential project 'Jyothi Urbis' by M/S. Vamsiram Builders in Hyderabad, Telangana. It includes basic information about the project, its location, public consultation details, and environmental impact assessments related to construction activities. The project aims to construct a commercial building with a built-up area of 55,910.8 square meters and does not involve any hazardous substances or significant environmental risks.

Uploaded by

rathi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Form-1

APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE

1. Basic Informations

Proposed Commercial cum


Project Name Residential “Jyothi Urbis” By Company/Organisation Name M/S. VAMSIRAM BUILDERS
M/s. Vamsiram Builders
Sri B. Subba Reddy, Flat No.
202, Jyothi Srinivasam, Road
Registered Address Legal Status of the Company Others
No-55, Jubliee Hills,
Hyderabad Telangana 500033

Address for the correspondence:


(a)Name of the Applicant Subbareddy B
(b)Designation (Owner/ Partner/ CEO) Designatedpartner
flat No. 202, Jyothi Srinivasam, Road No.55, Jubliee Hills,
(c)Address
Hyderabad,,Khairatabad,Hyderabad,Telangana-500033
(d)Pin code 500033
2. (e)E-mail vamsirambuilders12@gmail.com
(f)Telephone No. 8632-237293
(g)Fax No.
Copy of documents in support of the
competence/authority of the person making
NIL
this application to make application on behalf
of the User Agency .

Category of the Project/Activity as per Schedule of EIA Notification,2006:


(a)Major Project/Activity 8(a) Building and Construction projects
(b)Minor Project/Activity 8(a) Building and Construction projects
(c)Category B2
3.
(d)Proposal Number SIA/TG/MIS/108468/2019
(e)Master Proposal Number(Single Window) SW/108467/2019
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Fresh EC

(a)Number of States in which Project will be


1
4. Executed
(b)Main State of the project Telangana

Details of State(s) of the project

S.
State Name District Name Tehsil Name Village Name
No.

(1.) Telangana Hyderabad Khairatabad Road No. 2, Banjara Hills

Details of Public Consultation:


(a)Whether the Project Exempted from Public
No
Hearing?
5.
(b)Whether details of Public Hearing available? No
(c)Reason Public Hearing is not Applicable for Construction Projects
(d)Supporting Document Copy of Supporting Document
Project Profile
Old Survey No.129 (New
Survey No. 403), Road No. 2,
Location of the project
Banjara Hills, Hyderabad Dist.,
Telangana State
Town / Village Plot/Survey/Khasra No.
(Name of more than one town Project site is located within (Name of more than one town Old Survey No.129 (New
may be entered by separating the Grater Hyderabad City may be entered by separating Survey No. 403)
with) with)
State Telangana District Hyderabad
Tehshil Khairatabad Pincode 500034
Nearest railway station Panjagutta Railway Station Distance from the project site 1.8
Rajeev Gandhi International
Nearest airport Distance from the project site 20.5
Airport
Nearest Town/City/District Project site is located within
Distance from the project site 0
Headquarters the Grater Hyderabad City
Village Panchayats, Zila
Parishad, Municipal Old Survey No.129 (New
Corporation, Local Survey No. 403), Road No. 2, Copy of Kml File
Upload GPS file
body(Complete postal Banjara Hills, Hyderabad Dist., Uploaded GPS file
addresses with telephone nos. Telangana State
to be given)
Site alternative under Uploaded Site alternative under
Shape of the project land Point
consideration(If any) consideration
Uploaded Brief summary of
Brief summary of project
project
Does your project location falls
under out of any following None of above Areas
areas
Proposed Built up area (Built
up area or covered area on all
the floors puttogether
including its basement and Existing Built Up Area(In Meter
55910.8 0
other service areas which are /Sqr)
proposed in the building or
construction projects)(In
Meter /Sqr)
Does it attract any of the
general conditions given No
below?
Does it attract the specific
No
condition given below?
Interlinked Projects No
Whether separate application
of interlinked projects has Date of Submission
been submitted?
Whether the proposal involves
approval/clearance under the
No
Forest (Conservation)
Act,1980?
Whether the proposal involves
approval/clearance under the No
wildlife (Protection) Act,1972?
Whether the proposal involves
approval/clearance under the No
C.R.Z notification,2011?
Whether there is any
Government Order/Policy No
relevent/relating to the site?
Forest land involved(hectares) 0
Is there any litigation pending
No
against the project?

Activity
Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the
1.
locality (topography, land use, changes in water bodies, etc.)

S.No Details there of (with approximate


Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

Permanent change in land use will


Permanent or temporary change in land use, land cover or
occur due to Construction of
1.1 topography including increase in intensity of land use (with respect Yes
Commercial building. Project site is a
to local land use plan)
plain land.

No existing buildings are located within


the project site. However clearance of
1.2 Clearance of existing land, vegetation and buildings? No
some trees, grass and bushes need to
be done.

The proposed site will be used for


1.3 Creation of new land uses? Yes
construction of Commercial Building.

1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing was done.

1.5 Construction works? Yes Construction of Commercial Building.

No Demolition works are envisaged as


1.6 Demolition works? No there are no old structures in the
proposed site.

Most of the workers were hired from the


Temporary sites used for construction works or housing of nearby areas. Temporary sheds will be
1.7 No
construction workers? provided for security persons and
outside laborers.

The project involves development of


Commercial Building which requires
adequate engineered earthworks.
Excavation will be done for construction
of footing & foundations. The excavated
Above ground buildings, structures or earthworks including linear soil will be about 43,526 cu. m. Out of
1.8 No
structures,cut and fill or excavations and fill or excavations this 18,000 cu. m. will be used for
backfilling. Some of the remaining
material will be used for formation of
road and for green belt development.
Remaining material will be sold to
earthwork contractors.

1.9 Underground works including mining or tunneling? No Not Applicable

1.10 Reclamation works? No Not Applicable

1.11 Dredging? No Not Applicable

1.12 Offshore structures? No Not Applicable

1.13 Production and manufacturing processes? No Not Applicable

Temporary site office/Room/Shed at


1.14 Facilities for storage of goods or materials? Yes
site.

• Treated in Sewage treatment plant. •


Salt glazed vitrified pipes or HDPE pipes
for sewage collection. • It will be seen
that there is no leakage or mixing of
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes
sewage with drinking or ground water
sources. • Treated effluents will be
disposed in Rain water harvesting
pits/Storm water Drains.

1.16 Facilities for long term housing of operational workers? No None envisaged.

1.17 New road, rail or sea traffic during construction or operation? No Not Applicable
New road, rail, air water borne or other transport infrastructure
1.18 No None
including new or altered routes and stations, ports, airports etc?

Closure or diversion of existing transport routes or infrastructure


1.19 No Not Applicable
leading to changes in traffic movements?

1.20 New or diverted transmission lines or pipelines? No None envisaged

Impoundment, damming, culverting, realignment or other changes to


1.21 No None envisaged
the hydrology of watercourses or aquifers?

None envisaged. There is no stream


1.22 Stream crossings? No
crossing in the proposed site.

Ground water is used during


1.23 Abstraction or transfers of water from ground or surface waters? Yes
construction and operation phases.

Due to the project there will not be any


Changes in water bodies or the land surface affecting drainage or changes in water bodies, drainage
1.24 No
run-off? pattern etc. Runoff will be managed by
adequate storm water drain systems

Transport of personnel or materials for construction, operation or Transfer of material was done by
1.25 Yes
decommissioning? vehicles to the construction site.

1.26 Long-term dismantling or decommissioning or restoration works? No None envisaged

Ongoing activity during decommissioning which could have an


1.27 No None envisaged
impact on the environment?

Construction workers will be hired


1.28 Influx of people to an area in either temporarily or permanently? Yes temporarily and will be housed in the
site during construction phase.

1.29 Introduction of alien species? No None envisaged

1.30 Loss of native species or genetic diversity? No None envisaged

1.31 Any other actions? No None envisaged

Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy,
2
especially any resources which are non-renewable or in short supply):

S.No Details thereof (with approximate


Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

Undeveloped land – 7678.81 m2


2.1 Land especially undeveloped or agricultural land (ha) Yes
(0.767881 ha./ 1.897 Ac.)

Total water requirement for the project


2.2 Water (expected source & competing users) unit: KLD Yes is 118 KLD. Source of the water is
Ground Water & Municipal supply.

2.3 Minerals (MT) No Not Applicable

Coarse & Fine Aggregate, Granite, Kota


Construction material – stone, aggregates, sand / soil (expected
2.4 Yes stone, marble bricks, sand, cement,
source – MT)
steel. From local traders or nearby sites.

2.5 Forests and timber (source – MT) Yes Timber for Doors & windows

About 2000 KVA power will be required


for the Project and it will be sourced
Energy including electricity and fuels (source, competing users) Unit:
2.6 Yes from TSSPDCL. 4 DG sets 750 KVA and
fuel (MT),energy (MW)
1 DG set 160 KVA (total 3160 KVA) will
be provided as a backup power source.

2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or
the environment or raise concerns about actual or perceived risks to human health
S.No Details thereof (with approximate
Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

No hazardous substances (as per


Use of substances or materials, which are hazardous (as per MSIHC
MSIHC rules) are used in the proposed
3.1 rules) to human health or the environment (flora, fauna, and water No
residential project. Therefore no
supplies
hazardous waste is generated.

Changes in occurrence of disease or affect disease vectors (e.g.


3.2 No None envisaged
insect or water borne diseases)

Socio Economic conditions will be


improved in the nearby areas as people
3.3 Affect the welfare of people e.g. by changing living conditions? No
from various communities will occupy
the Commercial apartments.

Vulnerable groups of people who could be affected by the project


3.4 No Not Applicable
e.g. hospital patients, children, the elderly etc.

3.5 Any other causes No None envisaged

4 Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No Details thereof (with approximate


Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

Less amount of top soil will be removed


for foundation purpose and the same
4.1 Spoil, overburden or mine wastes Yes
will be used for the green belt. There are
no overburden or mine waste.

The total municipal waste generated


4.2 Municipal waste (domestic and or commercial wastes) Yes from the Commercial project will be
592.75 kg/day.

Used batteries : 4 no.s/ year Waste oil


4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes from D.G. sets : 300 l./year Transformer
Oil – 100 LPA

4.4 Other industrial process wastes No Not Applicable

4.5 Surplus product No Not Applicable

Sludge from STP sent to green belt


4.6 Sewage sludge or other sludge from effluent treatment Yes
development.

The amount of construction debris may


be generated which will be segregated
and whatever re-saleable will be sold to
4.7 Construction or demolition wastes Yes supplier and rest waste will be used for
filling up of low lying areas and
development of internal roads and
boundary walls etc.

Most of the equipment used for the


construction will be hired and any
4.8 Redundant machinery or equipment No surplus equipment and material that is
found will be sold off to the appropriate
agencies.

No soil Contamination is anticipated as


the proposed project being a
4.9 Contaminated soils or other materials No construction project all the waste
generated will be recyclable in nature
(Domestic in nature).
4.10 Agricultural wastes No Not Applicable

Solid Waste like rubbles, used up


cement, broken bricks etc which shall
4.11 Other solid wastes Yes
be used for filling up of low lying areas
during development stage.

5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)

S.No Details thereof (with approximate


Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

Emissions will be mainly from vehicles


running at the project site during
construction and operation period and
secondly from the DG set used for
backup power source (during power
failures only for a short duration). High
Emissions from combustion of fossil fuels from stationary or mobile Speed Diesel (HSD) will be used for the
5.1 Yes
sources DG sets. The main emissions will be
SO2 and NOx The D.G Set will be
acoustically enclosed so as to meet the
norms laid down by CPCB. For Proper
dispersion of pollutants, the stack
height meeting CPCB Norms will be
maintained.

Not Applicable as this is a construction


5.2 Emissions from production processes No
project

The main emissions during the


construction will be PM (Particulate
Matter) from loading and unloading of
material on the site, SO2 and NOx from
the combustion of fossil fuels and from
5.3 Emissions from materials handling including storage or transport Yes
the vehicles. The particulate matter will
be controlled by sprinkling water at
regular intervals on paved roads. The
SO2 and NOx will be controlled by
proper maintenance of the vehicles.

Fugitive emissions are likely during the


construction activities from the
materials. These are temporary in
nature. The main emissions during the
Emissions from construction activities including plant and
5.4 Yes construction will be Particulate Matter
equipment
from the loading and unloading of
materials on the site. SO2 and NOx from
the combustion of fuels in vehicles and
construction equipment.

The particulate matter will be mainly


generated from loading and unloading
of the material at the site. Other
municipal solid waste will be disposed
off to the Municipal solid waste dump
Dust or odours from handling of materials including construction yard. The construction material will be
5.5 Yes
materials, sewage and waste handled carefully to prevent any spill
over or wastage. Construction labor will
be provided with proper sanitation to
avoid any unhygienic conditions.
Therefore no odor generation is
expected.

5.6 Emissions from incineration of waste No Not Applicable

Emissions from burning of waste in open air (e.g. slash materials,


5.7 No Not Applicable
construction debris)
5.8 Emissions from any other sources No Not Applicable

6 Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No Details thereof (with approximate


Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

Noise is anticipated during activities


such as drilling, concrete mixing and
crushing etc. These are temporary in
nature and will be minimized by
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes
adopting proper maintenance such as
greasing, oiling and insulations
(acoustic enclosures) for DG sets for
noise pollution control.

Not Applicable as this is a construction


6.2 From industrial or similar processes No
project.

The noise and vibrations are only during


the construction phase and proper
precautions are taken to ensure that the
noise levels are below the standards
6.3 From construction or demolition Yes
and the equipment utilized for
constructions are properly serviced and
maintained for reduction vibration and
noise levels.

6.4 From blasting or piling No None envisaged

Noise is anticipated due to vehicular


6.5 From construction or operational traffic Yes movement and construction activities,
which is temporary in nature.

6.6 From lighting or cooling systems No None envisaged

6.7 From any other sources No None

Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters,
7
groundwater, coastal waters or the sea:

S.No Details thereof (with approximate


Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

Used batteries & waste oil from D.G.


sets will be stored separately and will
7.1 From handling, storage, use or spillage of hazardous materials No not be allowed to contamination of land
during the construction & operational
phases.

The sewage shall be treated to achieve


the standards prescribed by MoEF & CC
during operation phase. While the
From discharge of sewage or other effluents to water or the land
7.2 No discharges from temporary toilets
(expected mode and place of discharge)
during construction shall be sent to
septic tank followed by municipal sewer
lines.

In Building and construction project the


air pollutants are minimal; to minimize
7.3 By deposition of pollutants emitted to air into the land or into water No
the same greenbelt will be developed
along the boundary and roads.

7.4 From any other sources No None envisaged


Proper Environmental Management
Plan will be followed for air, water, noise
pollution and solid waste management.
Is there a risk of long term build up of pollutants in the environment Hence no long term impacts are
7.5 No
from these sources? envisaged and this being a construction
project the impact felt on the area will
be temporary in nature as most of the
impacts are all construction impacts.

8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S.No Details thereof (with approximate


Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

Fire hydrant and Fire-fighting systems


will be installed and safety precautions
From explosions, spillages, fires etc from storage, handling, use or will be followed as per the safety rules.
8.1 No
production of hazardous substances Only Diesel in small quantity and paints
during construction phase will be
flammable material used and stored.

8.2 From any other causes No Not Applicable

Could the project be affected by natural disasters causing None envisaged. The project site falls in
8.3 environmental damage (e.g. floods, earthquakes, landslides, No the seismic zone-II, which is seismically
cloudburst etc)? considered safe.

Factors which should be considered (such as consequential development) which could lead to environmental effects or
9
the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate


S.No Information/Checklist confirmation Yes/No quantities/rates, wherever possible)
with source of information data

Lead to development of supporting utilities, ancillary development or


development stimulated by the project which could have impact on
the environment e.g.: Yes. Both construction and operation
phase will enhance the supporting,
Supporting infrastructure (roads, power supply,waste or waste
utilities, ancillary development in the
9.1 water treatment, etc.) Yes
area around. Improved aesthetic look by
housing development
avenue plantation and landscape
extractive industries
development.
supply industries
Other

Lead to after-use of the site, which could have an impact on the


9.2 No -
environment

The proposed development will


facilitate further sustainable
9.3 Set a precedent for later developments Yes
development of residential areas and as
well as commercial areas.

Have cumulative effects due to proximity to other existing or None envisaged as the proposed
9.4 No
planned projects with similar effects development is a construction project

(III) Environmental Sensitivity


Aerial distance (within 15km.)
S.No Areas Name/Identity
Proposed project location boundary

Areas protected under international conventions, national or local


1 legislation for their ecological, landscape, cultural or other related No -
value

Areas which are important or sensitive for ecological reasons - Water Bodies: Musi River – 5.4 km (S)
2 Wetlands, watercourses or other water bodies, coastal zone, Yes Kistappa Vagu – 2.9 km (NE) Forests:
biospheres, mountains, forests Kottaguda R.F. – 8.1 km (NW)

Areas used by protected, important or sensitive species of flora or


3 fauna for breeding, nesting, foraging, resting, over wintering, No Not Applicable
migration

4 Inland, coastal, marine or underground waters No Not Applicable

5 State, National boundaries No No State Boundary within 10 km radius

Routes or facilities used by the public for access to recreation or


6 No None
other tourist, pilgrim areas

7 Defence installations No Not Applicable

Site Area within the Hyderabad City


8 Densely populated or built-up area Yes
Region

Hospitals, Schools, Places of worship


Areas occupied by sensitive man-made land uses (hospitals,
9 Yes and Community Facilities are present
schools, places of worship, community facilities)
near the site.

Areas containing important, high quality or scarce resources.


10 (ground water resources,surface No Not Applicable
resources,forestry,agriculture,fisheries,tourism,minerals)

Areas already subjected to pollution or environmental damage.


11 No Not Applicable
(those where existing legal environmental standards are exceeded)

Areas susceptible to natural hazard which could cause the project


to present environmental problems (earthquakes, subsidence,
12 No Not Applicable
landslides, erosion, flooding or extreme or adverse climatic
conditions) similar effects

Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
Upload Scanned copy of
3. Uploaded Scanned copy of covering letter..
covering letter.
Upload Additional attached if
4. Uploaded Additional attached if any(Single PDF).
any(Single PDF)
Whether it is a violation case
and application is being
5. submitted under Notification No
No. S.O.804(E) dated
14.03.2017 ?

Essential Details Sought

S.
EDS Sought Date EDS Sought Letter
No.

NO Record

Additional Details Sought

S.
ADS Sought Date ADS Sought Letter
No.

NO Record

Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my
knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any
stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition
to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.

Name of Applicant Subbareddy B


Designation Designatedpartner
Name of Company (Applicant Name should not
M/S. VAMSIRAM BUILDERS
be given here)
Sri B. Subba Reddy, Flat No. 202, Jyothi Srinivasam, Road No-55,
Address
Jubliee Hills, Hyderabad