Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
                                 Proposed Commercial cum
Project Name                     Residential “Jyothi Urbis” By Company/Organisation Name           M/S. VAMSIRAM BUILDERS
                                   M/s. Vamsiram Builders
                                 Sri B. Subba Reddy, Flat No.
                                202, Jyothi Srinivasam, Road
Registered Address                                             Legal Status of the Company                    Others
                                      No-55, Jubliee Hills,
                                Hyderabad Telangana 500033
        Address for the correspondence:
        (a)Name of the Applicant                           Subbareddy B
        (b)Designation (Owner/ Partner/ CEO)               Designatedpartner
                                                           flat No. 202, Jyothi Srinivasam, Road No.55, Jubliee Hills,
        (c)Address
                                                           Hyderabad,,Khairatabad,Hyderabad,Telangana-500033
        (d)Pin code                                        500033
 2.     (e)E-mail                                          vamsirambuilders12@gmail.com
        (f)Telephone No.                                   8632-237293
        (g)Fax No.
        Copy of documents in support of the
        competence/authority of the person making
                                                           NIL
        this application to make application on behalf
        of the User Agency .
        Category of the Project/Activity as per Schedule of EIA Notification,2006:
        (a)Major Project/Activity                          8(a) Building and Construction projects
        (b)Minor Project/Activity                          8(a) Building and Construction projects
        (c)Category                                        B2
 3.
        (d)Proposal Number                                 SIA/TG/MIS/108468/2019
        (e)Master Proposal Number(Single Window)        SW/108467/2019
        (f)EAC concerned (for category A Projects only) INFRA-2
        (g)Project Type(New/Expansion/Modernization) Fresh EC
        (a)Number of States in which Project will be
                                                           1
 4.     Executed
        (b)Main State of the project                       Telangana
                                                Details of State(s) of the project
 S.
             State Name                District Name                   Tehsil Name                        Village Name
 No.
 (1.)   Telangana                   Hyderabad                          Khairatabad                   Road No. 2, Banjara Hills
        Details of Public Consultation:
        (a)Whether the Project Exempted from Public
                                                           No
        Hearing?
 5.
        (b)Whether details of Public Hearing available?    No
        (c)Reason                                          Public Hearing is not Applicable for Construction Projects
        (d)Supporting Document                             Copy of Supporting Document
                                                         Project Profile
                                      Old Survey No.129 (New
                                    Survey No. 403), Road No. 2,
Location of the project
                                   Banjara Hills, Hyderabad Dist.,
                                          Telangana State
Town / Village                                                       Plot/Survey/Khasra No.
(Name of more than one town        Project site is located within    (Name of more than one town          Old Survey No.129 (New
may be entered by separating        the Grater Hyderabad City        may be entered by separating             Survey No. 403)
with)                                                                with)
State                                       Telangana                District                                    Hyderabad
Tehshil                                    Khairatabad               Pincode                                      500034
Nearest railway station            Panjagutta Railway Station        Distance from the project site                 1.8
                                   Rajeev Gandhi International
Nearest airport                                                      Distance from the project site                 20.5
                                              Airport
Nearest Town/City/District         Project site is located within
                                                                     Distance from the project site                  0
Headquarters                        the Grater Hyderabad City
Village Panchayats, Zila
Parishad, Municipal                   Old Survey No.129 (New
Corporation, Local                  Survey No. 403), Road No. 2,                                          Copy of Kml File
                                                                   Upload GPS file
body(Complete postal               Banjara Hills, Hyderabad Dist.,                                          Uploaded GPS file
addresses with telephone nos.             Telangana State
to be given)
                                                                     Site alternative under            Uploaded Site alternative under
Shape of the project land                      Point
                                                                     consideration(If any)                    consideration
                                    Uploaded Brief summary of
Brief summary of project
                                             project
Does your project location falls
under out of any following             None of above Areas
areas
Proposed Built up area (Built
up area or covered area on all
the floors puttogether
including its basement and                                           Existing Built Up Area(In Meter
                                              55910.8                                                                0
other service areas which are                                        /Sqr)
proposed in the building or
construction projects)(In
Meter /Sqr)
Does it attract any of the
general conditions given                         No
below?
Does it attract the specific
                                                 No
condition given below?
Interlinked Projects                             No
Whether separate application
of interlinked projects has                                          Date of Submission
been submitted?
Whether the proposal involves
approval/clearance under the
                                                 No
Forest (Conservation)
Act,1980?
Whether the proposal involves
approval/clearance under the                     No
wildlife (Protection) Act,1972?
Whether the proposal involves
approval/clearance under the                     No
C.R.Z notification,2011?
Whether there is any
Government Order/Policy                          No
relevent/relating to the site?
Forest land involved(hectares)                   0
Is there any litigation pending
                                                 No
against the project?
                                                             Activity
       Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the
 1.
       locality (topography, land use, changes in water bodies, etc.)
S.No                                                                                          Details there of (with approximate
                        Information/Checklist confirmation                        Yes/No     quantities/rates, wherever possible)
                                                                                               with source of information data
                                                                                           Permanent change in land use will
       Permanent or temporary change in land use, land cover or
                                                                                           occur     due to    Construction    of
1.1    topography including increase in intensity of land use (with respect        Yes
                                                                                           Commercial building. Project site is a
       to local land use plan)
                                                                                           plain land.
                                                                                           No existing buildings are located within
                                                                                           the project site. However clearance of
1.2    Clearance of existing land, vegetation and buildings?                       No
                                                                                           some trees, grass and bushes need to
                                                                                           be done.
                                                                                           The proposed site will be used for
1.3    Creation of new land uses?                                                  Yes
                                                                                           construction of Commercial Building.
1.4    Pre-construction investigations e.g. bore houses, soil testing?             Yes     Soil testing was done.
1.5    Construction works?                                                         Yes     Construction of Commercial Building.
                                                                                           No Demolition works are envisaged as
1.6    Demolition works?                                                           No      there are no old structures in the
                                                                                           proposed site.
                                                                                           Most of the workers were hired from the
       Temporary sites used for construction works or housing of                           nearby areas. Temporary sheds will be
1.7                                                                                No
       construction workers?                                                               provided for security persons and
                                                                                           outside laborers.
                                                                                           The project involves development of
                                                                                           Commercial Building which requires
                                                                                           adequate      engineered     earthworks.
                                                                                           Excavation will be done for construction
                                                                                           of footing & foundations. The excavated
       Above ground buildings, structures or earthworks including linear                   soil will be about 43,526 cu. m. Out of
1.8                                                                                No
       structures,cut and fill or excavations and fill or excavations                      this 18,000 cu. m. will be used for
                                                                                           backfilling. Some of the remaining
                                                                                           material will be used for formation of
                                                                                           road and for green belt development.
                                                                                           Remaining material will be sold to
                                                                                           earthwork contractors.
1.9    Underground works including mining or tunneling?                            No      Not Applicable
1.10   Reclamation works?                                                          No      Not Applicable
1.11   Dredging?                                                                   No      Not Applicable
1.12   Offshore structures?                                                        No      Not Applicable
1.13   Production and manufacturing processes?                                     No      Not Applicable
                                                                                           Temporary site office/Room/Shed at
1.14   Facilities for storage of goods or materials?                               Yes
                                                                                           site.
                                                                                           • Treated in Sewage treatment plant. •
                                                                                           Salt glazed vitrified pipes or HDPE pipes
                                                                                           for sewage collection. • It will be seen
                                                                                           that there is no leakage or mixing of
1.15   Facilities for treatment or disposal of solid waste or liquid effluents?    Yes
                                                                                           sewage with drinking or ground water
                                                                                           sources. • Treated effluents will be
                                                                                           disposed in Rain water harvesting
                                                                                           pits/Storm water Drains.
1.16   Facilities for long term housing of operational workers?                    No      None envisaged.
1.17   New road, rail or sea traffic during construction or operation?             No      Not Applicable
       New road, rail, air water borne or other transport infrastructure
1.18                                                                             No      None
       including new or altered routes and stations, ports, airports etc?
       Closure or diversion of existing transport routes or infrastructure
1.19                                                                             No      Not Applicable
       leading to changes in traffic movements?
1.20   New or diverted transmission lines or pipelines?                          No      None envisaged
       Impoundment, damming, culverting, realignment or other changes to
1.21                                                                             No      None envisaged
       the hydrology of watercourses or aquifers?
                                                                                         None envisaged. There is no stream
1.22   Stream crossings?                                                         No
                                                                                         crossing in the proposed site.
                                                                                         Ground     water   is    used   during
1.23   Abstraction or transfers of water from ground or surface waters?          Yes
                                                                                         construction and operation phases.
                                                                                         Due to the project there will not be any
       Changes in water bodies or the land surface affecting drainage or                 changes in water bodies, drainage
1.24                                                                             No
       run-off?                                                                          pattern etc. Runoff will be managed by
                                                                                         adequate storm water drain systems
       Transport of personnel or materials for construction, operation or                Transfer of material was done by
1.25                                                                             Yes
       decommissioning?                                                                  vehicles to the construction site.
1.26   Long-term dismantling or decommissioning or restoration works?            No      None envisaged
       Ongoing activity during decommissioning which could have an
1.27                                                                             No      None envisaged
       impact on the environment?
                                                                                         Construction workers will be hired
1.28   Influx of people to an area in either temporarily or permanently?         Yes     temporarily and will be housed in the
                                                                                         site during construction phase.
1.29   Introduction of alien species?                                            No      None envisaged
1.30   Loss of native species or genetic diversity?                              No      None envisaged
1.31   Any other actions?                                                        No      None envisaged
       Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy,
 2
       especially any resources which are non-renewable or in short supply):
S.No                                                                                        Details thereof (with approximate
                        Information/Checklist confirmation                      Yes/No     quantities/rates, wherever possible)
                                                                                             with source of information data
                                                                                         Undeveloped land – 7678.81            m2
2.1    Land especially undeveloped or agricultural land (ha)                     Yes
                                                                                         (0.767881 ha./ 1.897 Ac.)
                                                                                         Total water requirement for the project
2.2    Water (expected source & competing users) unit: KLD                       Yes     is 118 KLD. Source of the water is
                                                                                         Ground Water & Municipal supply.
2.3    Minerals (MT)                                                             No      Not Applicable
                                                                                         Coarse & Fine Aggregate, Granite, Kota
       Construction material – stone, aggregates, sand / soil (expected
2.4                                                                              Yes     stone, marble bricks, sand, cement,
       source – MT)
                                                                                         steel. From local traders or nearby sites.
2.5    Forests and timber (source – MT)                                          Yes     Timber for Doors & windows
                                                                                         About 2000 KVA power will be required
                                                                                         for the Project and it will be sourced
       Energy including electricity and fuels (source, competing users) Unit:
2.6                                                                              Yes     from TSSPDCL. 4 DG sets 750 KVA and
       fuel (MT),energy (MW)
                                                                                         1 DG set 160 KVA (total 3160 KVA) will
                                                                                         be provided as a backup power source.
2.7    Any other natural resources (use appropriate standard units)              No      Not Applicable
 3     Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or
       the environment or raise concerns about actual or perceived risks to human health
S.No                                                                                    Details thereof (with approximate
                         Information/Checklist confirmation                 Yes/No     quantities/rates, wherever possible)
                                                                                         with source of information data
                                                                                     No hazardous substances (as per
       Use of substances or materials, which are hazardous (as per MSIHC
                                                                                     MSIHC rules) are used in the proposed
3.1    rules) to human health or the environment (flora, fauna, and water    No
                                                                                     residential project. Therefore no
       supplies
                                                                                     hazardous waste is generated.
       Changes in occurrence of disease or affect disease vectors (e.g.
3.2                                                                          No      None envisaged
       insect or water borne diseases)
                                                                                     Socio Economic conditions will be
                                                                                     improved in the nearby areas as people
3.3    Affect the welfare of people e.g. by changing living conditions?      No
                                                                                     from various communities will occupy
                                                                                     the Commercial apartments.
       Vulnerable groups of people who could be affected by the project
3.4                                                                          No      Not Applicable
       e.g. hospital patients, children, the elderly etc.
3.5    Any other causes                                                      No      None envisaged
 4     Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No                                                                                    Details thereof (with approximate
                         Information/Checklist confirmation                 Yes/No     quantities/rates, wherever possible)
                                                                                         with source of information data
                                                                                     Less amount of top soil will be removed
                                                                                     for foundation purpose and the same
4.1    Spoil, overburden or mine wastes                                      Yes
                                                                                     will be used for the green belt. There are
                                                                                     no overburden or mine waste.
                                                                                     The total municipal waste generated
4.2    Municipal waste (domestic and or commercial wastes)                   Yes     from the Commercial project will be
                                                                                     592.75 kg/day.
                                                                                     Used batteries : 4 no.s/ year Waste oil
4.3    Hazardous wastes (as per Hazardous Waste Management Rules)            Yes     from D.G. sets : 300 l./year Transformer
                                                                                     Oil – 100 LPA
4.4    Other industrial process wastes                                       No      Not Applicable
4.5    Surplus product                                                       No      Not Applicable
                                                                                     Sludge from STP sent to green belt
4.6    Sewage sludge or other sludge from effluent treatment                 Yes
                                                                                     development.
                                                                                     The amount of construction debris may
                                                                                     be generated which will be segregated
                                                                                     and whatever re-saleable will be sold to
4.7    Construction or demolition wastes                                     Yes     supplier and rest waste will be used for
                                                                                     filling up of low lying areas and
                                                                                     development of internal roads and
                                                                                     boundary walls etc.
                                                                                     Most of the equipment used for the
                                                                                     construction will be hired and any
4.8    Redundant machinery or equipment                                      No      surplus equipment and material that is
                                                                                     found will be sold off to the appropriate
                                                                                     agencies.
                                                                                     No soil Contamination is anticipated as
                                                                                     the   proposed     project   being    a
4.9    Contaminated soils or other materials                                 No      construction project all the waste
                                                                                     generated will be recyclable in nature
                                                                                     (Domestic in nature).
4.10   Agricultural wastes                                                     No     Not Applicable
                                                                                      Solid Waste like rubbles, used up
                                                                                      cement, broken bricks etc which shall
4.11   Other solid wastes                                                      Yes
                                                                                      be used for filling up of low lying areas
                                                                                      during development stage.
 5     Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No                                                                                        Details thereof (with approximate
                       Information/Checklist confirmation                    Yes/No        quantities/rates, wherever possible)
                                                                                             with source of information data
                                                                                      Emissions will be mainly from vehicles
                                                                                      running at the project site during
                                                                                      construction and operation period and
                                                                                      secondly from the DG set used for
                                                                                      backup power source (during power
                                                                                      failures only for a short duration). High
       Emissions from combustion of fossil fuels from stationary or mobile            Speed Diesel (HSD) will be used for the
5.1                                                                            Yes
       sources                                                                        DG sets. The main emissions will be
                                                                                      SO2 and NOx The D.G Set will be
                                                                                      acoustically enclosed so as to meet the
                                                                                      norms laid down by CPCB. For Proper
                                                                                      dispersion of pollutants, the stack
                                                                                      height meeting CPCB Norms will be
                                                                                      maintained.
                                                                                      Not Applicable as this is a construction
5.2    Emissions from production processes                                     No
                                                                                      project
                                                                                      The main emissions during the
                                                                                      construction will be PM (Particulate
                                                                                      Matter) from loading and unloading of
                                                                                      material on the site, SO2 and NOx from
                                                                                      the combustion of fossil fuels and from
5.3    Emissions from materials handling including storage or transport        Yes
                                                                                      the vehicles. The particulate matter will
                                                                                      be controlled by sprinkling water at
                                                                                      regular intervals on paved roads. The
                                                                                      SO2 and NOx will be controlled by
                                                                                      proper maintenance of the vehicles.
                                                                                      Fugitive emissions are likely during the
                                                                                           construction activities from the
                                                                                         materials. These are temporary in
                                                                                       nature. The main emissions during the
       Emissions from construction activities including plant and
5.4                                                                            Yes     construction will be Particulate Matter
       equipment
                                                                                         from the loading and unloading of
                                                                                      materials on the site. SO2 and NOx from
                                                                                      the combustion of fuels in vehicles and
                                                                                              construction equipment.
                                                                                      The particulate matter will be mainly
                                                                                      generated from loading and unloading
                                                                                      of the material at the site. Other
                                                                                      municipal solid waste will be disposed
                                                                                      off to the Municipal solid waste dump
       Dust or odours from handling of materials including construction               yard. The construction material will be
5.5                                                                            Yes
       materials, sewage and waste                                                    handled carefully to prevent any spill
                                                                                      over or wastage. Construction labor will
                                                                                      be provided with proper sanitation to
                                                                                      avoid any unhygienic conditions.
                                                                                      Therefore no odor generation is
                                                                                      expected.
5.6    Emissions from incineration of waste                                    No     Not Applicable
       Emissions from burning of waste in open air (e.g. slash materials,
5.7                                                                            No     Not Applicable
       construction debris)
5.8    Emissions from any other sources                                          No      Not Applicable
 6     Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No                                                                                        Details thereof (with approximate
                        Information/Checklist confirmation                      Yes/No     quantities/rates, wherever possible)
                                                                                             with source of information data
                                                                                         Noise is anticipated during activities
                                                                                         such as drilling, concrete mixing and
                                                                                         crushing etc. These are temporary in
                                                                                         nature and will be minimized by
6.1    From operation of equipment e.g. engines, ventilation plant, crushers     Yes
                                                                                         adopting proper maintenance such as
                                                                                         greasing,    oiling   and  insulations
                                                                                         (acoustic enclosures) for DG sets for
                                                                                         noise pollution control.
                                                                                         Not Applicable as this is a construction
6.2    From industrial or similar processes                                      No
                                                                                         project.
                                                                                         The noise and vibrations are only during
                                                                                         the construction phase and proper
                                                                                         precautions are taken to ensure that the
                                                                                         noise levels are below the standards
6.3    From construction or demolition                                           Yes
                                                                                         and the equipment utilized for
                                                                                         constructions are properly serviced and
                                                                                         maintained for reduction vibration and
                                                                                         noise levels.
6.4    From blasting or piling                                                   No      None envisaged
                                                                                         Noise is anticipated due to vehicular
6.5    From construction or operational traffic                                  Yes     movement and construction activities,
                                                                                         which is temporary in nature.
6.6    From lighting or cooling systems                                          No      None envisaged
6.7    From any other sources                                                    No      None
       Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters,
 7
       groundwater, coastal waters or the sea:
S.No                                                                                        Details thereof (with approximate
                        Information/Checklist confirmation                      Yes/No     quantities/rates, wherever possible)
                                                                                             with source of information data
                                                                                         Used batteries & waste oil from D.G.
                                                                                         sets will be stored separately and will
7.1    From handling, storage, use or spillage of hazardous materials            No      not be allowed to contamination of land
                                                                                         during the construction & operational
                                                                                         phases.
                                                                                         The sewage shall be treated to achieve
                                                                                         the standards prescribed by MoEF & CC
                                                                                         during operation phase. While the
       From discharge of sewage or other effluents to water or the land
7.2                                                                              No      discharges from temporary toilets
       (expected mode and place of discharge)
                                                                                         during construction shall be sent to
                                                                                         septic tank followed by municipal sewer
                                                                                         lines.
                                                                                         In Building and construction project the
                                                                                         air pollutants are minimal; to minimize
7.3    By deposition of pollutants emitted to air into the land or into water    No
                                                                                         the same greenbelt will be developed
                                                                                         along the boundary and roads.
7.4    From any other sources                                                    No      None envisaged
                                                                                         Proper Environmental Management
                                                                                         Plan will be followed for air, water, noise
                                                                                         pollution and solid waste management.
       Is there a risk of long term build up of pollutants in the environment            Hence no long term impacts are
7.5                                                                              No
       from these sources?                                                               envisaged and this being a construction
                                                                                         project the impact felt on the area will
                                                                                         be temporary in nature as most of the
                                                                                         impacts are all construction impacts.
 8     Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No                                                                                          Details thereof (with approximate
                        Information/Checklist confirmation                      Yes/No       quantities/rates, wherever possible)
                                                                                               with source of information data
                                                                                         Fire hydrant and Fire-fighting systems
                                                                                         will be installed and safety precautions
       From explosions, spillages, fires etc from storage, handling, use or              will be followed as per the safety rules.
8.1                                                                              No
       production of hazardous substances                                                Only Diesel in small quantity and paints
                                                                                         during construction phase will be
                                                                                         flammable material used and stored.
8.2    From any other causes                                                     No      Not Applicable
       Could the project be affected by natural disasters causing                        None envisaged. The project site falls in
8.3    environmental damage (e.g. floods, earthquakes, landslides,               No      the seismic zone-II, which is seismically
       cloudburst etc)?                                                                  considered safe.
       Factors which should be considered (such as consequential development) which could lead to environmental effects or
 9
       the potential for cumulative impacts with other existing or planned activities in the locality
                                                                                              Details thereof (with approximate
S.No                    Information/Checklist confirmation                      Yes/No       quantities/rates, wherever possible)
                                                                                               with source of information data
       Lead to development of supporting utilities, ancillary development or
       development stimulated by the project which could have impact on
       the environment e.g.:                                                             Yes. Both construction and operation
                                                                                         phase will enhance the supporting,
           Supporting infrastructure (roads, power supply,waste or waste
                                                                                         utilities, ancillary development in the
9.1        water treatment, etc.)                                                Yes
                                                                                         area around. Improved aesthetic look by
           housing development
                                                                                         avenue plantation and landscape
           extractive industries
                                                                                         development.
           supply industries
           Other
       Lead to after-use of the site, which could have an impact on the
9.2                                                                              No      -
       environment
                                                                                         The      proposed    development    will
                                                                                         facilitate      further     sustainable
9.3    Set a precedent for later developments                                    Yes
                                                                                         development of residential areas and as
                                                                                         well as commercial areas.
       Have cumulative effects due to proximity to other existing or                     None envisaged as the proposed
9.4                                                                              No
       planned projects with similar effects                                             development is a construction project
(III) Environmental Sensitivity
                                                                                                      Aerial distance (within 15km.)
S.No                                    Areas                                   Name/Identity
                                                                                                    Proposed project location boundary
       Areas protected under international conventions, national or local
 1     legislation for their ecological, landscape, cultural or other related        No         -
       value
       Areas which are important or sensitive for ecological reasons -                          Water Bodies: Musi River – 5.4 km (S)
 2     Wetlands, watercourses or other water bodies, coastal zone,                   Yes        Kistappa Vagu – 2.9 km (NE) Forests:
       biospheres, mountains, forests                                                           Kottaguda R.F. – 8.1 km (NW)
       Areas used by protected, important or sensitive species of flora or
 3     fauna for breeding, nesting, foraging, resting, over wintering,               No         Not Applicable
       migration
 4     Inland, coastal, marine or underground waters                                 No         Not Applicable
 5     State, National boundaries                                                    No         No State Boundary within 10 km radius
       Routes or facilities used by the public for access to recreation or
 6                                                                                   No         None
       other tourist, pilgrim areas
 7     Defence installations                                                         No         Not Applicable
                                                                                                Site Area within the Hyderabad City
 8     Densely populated or built-up area                                            Yes
                                                                                                Region
                                                                                                Hospitals, Schools, Places of worship
       Areas occupied by sensitive man-made land uses (hospitals,
 9                                                                                   Yes        and Community Facilities are present
       schools, places of worship, community facilities)
                                                                                                near the site.
       Areas containing important, high quality or scarce resources.
10     (ground water resources,surface                                               No         Not Applicable
       resources,forestry,agriculture,fisheries,tourism,minerals)
       Areas already subjected to pollution or environmental damage.
11                                                                                   No         Not Applicable
       (those where existing legal environmental standards are exceeded)
       Areas susceptible to natural hazard which could cause the project
       to present environmental problems (earthquakes, subsidence,
12                                                                                   No         Not Applicable
       landslides, erosion, flooding or extreme or adverse climatic
       conditions) similar effects
                                                 Document to be attached
1.     Upload a copy of PFR                                               Uploaded a copy of PFR.
2.     Upload a copy of EMP                                               Uploaded a copy of EMP.
       Upload Scanned copy of
3.                                                               Uploaded Scanned copy of covering letter..
       covering letter.
       Upload Additional attached if
4.                                                            Uploaded Additional attached if any(Single PDF).
       any(Single PDF)
       Whether it is a violation case
       and application is being
5.     submitted under Notification                                                    No
       No. S.O.804(E) dated
       14.03.2017 ?
       Essential Details Sought
S.
             EDS Sought Date                                     EDS Sought                                            Letter
No.
                                                            NO Record
       Additional Details Sought
S.
             ADS Sought Date                                    ADS Sought                                             Letter
No.
                                                            NO Record
       Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my
knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any
stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition
to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant                                     Subbareddy B
Designation                                           Designatedpartner
Name of Company (Applicant Name should not
                                                      M/S. VAMSIRAM BUILDERS
be given here)
                                                      Sri B. Subba Reddy, Flat No. 202, Jyothi Srinivasam, Road No-55,
Address
                                                      Jubliee Hills, Hyderabad