0% found this document useful (0 votes)
23 views2 pages

Block A

The document lists various electrical items for a wiring project, including light switches, breakers, sockets, and a cooker unit, along with their respective quantities and units of measure. Each item is marked as ZABs Approved, indicating compliance with standards. The project total cost and balance are not provided, indicated by #VALUE! placeholders.

Uploaded by

nyala chisola
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views2 pages

Block A

The document lists various electrical items for a wiring project, including light switches, breakers, sockets, and a cooker unit, along with their respective quantities and units of measure. Each item is marked as ZABs Approved, indicating compliance with standards. The project total cost and balance are not provided, indicated by #VALUE! placeholders.

Uploaded by

nyala chisola
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Block A

Item Description Brand UOMQty/Flat #Flats Total Qty


Wiring Project
Light Switch 2 Gang - 2 Way ZABs Approved Each 3 6.00 18.00
Light Switch 3 Gang 3 6.00
Light Switch 2 Gang - 1 Way ZABs Approved Each 3 6.00 18.00
Light Switch 1 Gang ZABs Approved 3 6.00
Breakers 60A ZABs Approved Each 2 6.00 12.00
Breakers 40A ZABs Approved Each 1 6.00 6.00
Breakers 32A ZABs Approved Each 2 6.00 12.00
Breakers 20A ZABs Approved Each 1 6.00 6.00
Breakers 5A ZABs Approved Each 2 6.00 12.00
Single Socket ZABs Approved Each 2 6.00 12.00
Double Socket ZABs Approved Each 15 6.00 90.00
Cooker Unit ZABs Approved 1 6.00 6.00
3 * 3 Box Covers ZABs Approved Pack 1 1.00 1.00
Geyser Switch ZABs Approved Each 1 6.00 6.00
Accessories ( Black Screws, Terminal
ZABs Approved Lot - #VALUE!
Block, Insulation etc.)

Project Total Cost (ZMW) #VALUE!