0% found this document useful (0 votes)
16 views16 pages

(Final) de An Tatm&VP - Group 3

The document outlines a proposal for the expansion of Sunrise Group by identifying Nomura Hai Phong Industrial Park as the most suitable location for a new factory in Vietnam. It includes an overview of the company's history, vision, mission, and the advantages of the selected site, such as its strategic location, infrastructure, and security services. A detailed action plan for the expansion project is also provided, including tasks and timelines for implementation.

Uploaded by

Đạt Huỳnh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views16 pages

(Final) de An Tatm&VP - Group 3

The document outlines a proposal for the expansion of Sunrise Group by identifying Nomura Hai Phong Industrial Park as the most suitable location for a new factory in Vietnam. It includes an overview of the company's history, vision, mission, and the advantages of the selected site, such as its strategic location, infrastructure, and security services. A detailed action plan for the expansion project is also provided, including tasks and timelines for implementation.

Uploaded by

Đạt Huỳnh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 16

HO CHI MINH CITY OPEN UNIVERSITY

FACULTY OF FOREIGN LANGUAGE

*****

SEEKING AN APPLICABLE LOCATION FOR PREMISES

EXPANSION

Instructor: Th.S Nguyen Thuy Dung

By: Nguyen Thi Tuyet Hoa


Huynh Lam Quoc Dat
Tran Duc Tai
Thai Huynh Tuyet My
Nguyen Thien Phuoc
Nguyen Phuoc Thanh

HO CHI MINH CITY, JUNE 2024


EXECUTIVE SUMMARY

The below information was collected in the most recent survey by the sales and
marketing team of our company. This proposal aims to research the specific
advantages and disadvantages of the new site and to suggest ideas for expanding a
new branch of the company according to the provided results.

From the essential premises of the expansion, Sunrise Group needs to rent a new factory
in an applicable site across the country which has numerous potential developments
and prospective visions shortly.

In terms of the location, infrastructure, security services, and other significant criteria
from the given notes, Nomura Hai Phong Industrial Park is highly rated as the most
suitable location of all regions in Vietnam.

2
TABLE OF CONTENT

CHAPTER 1: COMPANY OVERVIEW................................................................................................4


1.1 INTRODUCTION.............................................................................................................................4
1.2 VISION.............................................................................................................................................6
1.3 MISSION..........................................................................................................................................6
1.4 CORE VALUES................................................................................................................................7
1.5 NOMURA HAI PHONG INDUSTRIAL PARK...............................................................................7
CHAPTER 2: DISCUSSION FINDINGS................................................................................................9
2.1. GEOGRAPHICAL LOCATION......................................................................................................9
2.2 INFRASTRUCTURE......................................................................................................................10
2.3. Security...........................................................................................................................................11
CHAPTER 3: RECOMMENDATION..................................................................................................11
A CHECKLIST OF SPECIFIC TASKS – DECEMBER 2023...........................................................12
CHAPTER 4: CONCLUSION...............................................................................................................15
REFERENCES........................................................................................................................................16

3
CHAPTER 1: COMPANY OVERVIEW

1.1 INTRODUCTION:

Established in 1998, Sunrise Group has a chain of four construction steel billet and rolling mills
with a total annual capacity of 1 million tons of construction steel and 1.2 million tons of billet.
Sunrise is one of Vietnam's best and most modern construction steel manufacturers and is the
leading enterprise in the construction steel market share in the Southern region.

No. 561A, Tran Phu Street,Tan Binh Commune, Tay Ninh


1. Location
Province, Vietnam

27-floor tower with 04 basements, 04 commercial floors,


01 utility floor and a rooftop.
2. Scale and architecture
Building complex of office-commerce, serviced
apartments and high-class apartments.

3. Owner Tan Hiep Phat

Provided 24/24h, in case of power failure, the building's


backup generator system will provide electricity for the
4. Electricity supply source
entire general technical system and the elevator system of
the building, office area, and center.

04 passenger lifts, 01 utility elevator and 01 goods


5. Elevator
elevator

6. Stairs/Escape stairs 02

7. Technical room: Low


voltage electricity,
Located in the basement area.
transformer, fire pump,
domestic water pump

The loudspeaker system is equipped in corridors,


8. Broadcasting system
emergency stairs, lobbies, corridors, and function rooms.

4
Equipped with a standard fire prevention system.
Specifically:
 The automatic fire alarm system is monitored by the
central control cabinet which automatically
9. Fire prevention system interoperates with the fire fighting and escape support
system.
 Fire Prevention System:
 Wall fire fighting system
 Spinkler automatic system
 Gas fire extinguishing systems for substation
rooms, low voltage rooms, generators
 Parking area is located at basement B3, B4
 Service & commercial area from 1st floor to 4th floor
10. Instructions  Office services: from 5th floor to 27th floor.
 Swimming pool, Sky Garden are displayed on the
rooftop.
 Community room on the 13th floor.

Necessary Contacts:

OFFICE NAME ADDRESS HOTLINE

Receptionist : 0902.366.115(24h/24h)
Main Office of the rd
3 floor – Sunrise
Building Management Building Engineering: 090.766.5152
Group Tower
Board
(24h/24h)

EMERGENCY CALLING NUMBERS

Tay Ninh Province 024.3786.3980


Tay Ninh province
Police Department
Electrical company 024.3723.8192

Water company 023.3323.7926

Medical center Tay Ninh province 0243.733.6517

Police for quick response Tay Ninh province 113


Fire and Rescue Police Tay Ninh province 114

3
First aid & Ambulance Tay Ninh province 115

CONVENIENT SERVICE

Internet and Television


Complimentary Ext: 124
Service Viettel

1.2 VISION:

Intending to redefine products as "the core of life," Sunrise Group is a pioneer manufacturer
investing in the world's most modern lines, technology, and equipment from leading equipment
suppliers. Sunrise Group is the first steel factory to achieve ISO 14001:2010 environmental
protection certification by using an environmentally friendly production system and applying
technology to help regenerate recycled raw materials with a water treatment system.

Sunrise Group proudly offers stable, safe, and sustainable-quality steel products. Besides
improving quality and protecting the environment, Sunrise also accompanies programs full of
humanity such as Qua Tang Cuoc Song, Chap Canh Uoc Mo, and Xay Dung Mai Am.
Sunrise Group has high product quality and competitive prices and has gained customers’s trust
for many years, bringing added value to society. Sunrise constantly strives to be a proud concept
of Vietnam's heavy industry.

1.3 MISSION:

 Deliver and supply the highest quality items to our clients.

 Continuously improving efficiency and productivity, adapting to design in architecture

 Use sustainable processes that fulfill the highest global standards of environmental
control.

 Raise employee awareness about environmental protection

 Employees with profound talent and motivation are key factors in achieving our goals.

6
 Provide outstanding training and investment in employees’ future.

 Create a professional work environment

1.4 CORE VALUES

 Respect History
 Promote people
 Be open to change.
 Build trust.
 Share with the community

1.5 NOMURA HAI PHONG INDUSTRIAL PARK

Nomura-Hai Phong Industrial Park was


established on December 23, 1994, under
Investment License No. 1091/GP of the State
Committee for Cooperation and Investment, the
first industrial park with foreign direct investment
in the Northern Provinces and also one of the first
industrial parks in Hai Phong. The Nomura
Industrial Park construction investment project
initially had a land use scale of 353 hectares, then
was adjusted down to 153 hectares according to
Official Dispatch No. 2628/TTg-KTN dated
December 22, 2014, of the Prime Minister, with a
planning location in An Duong district, Hai Phong
city, and a total investment capital of more than
140.8 million USD. The total industrial land area
for the project is 123 hectares, and the common
infrastructure land area is 30 hectares.

3
Nomura Hai Phong Industrial Park is oriented to be an industrial park that focuses on attracting
high-tech, environmentally friendly projects, mainly attracting investment projects in the fields
of high technology, machine manufacturing, precision mechanics, the production of auto and
motorcycle components, the production of electrical and electronic components, the production
of packaging, paper, high-grade paper products, and textiles. (Kland, n.d.)

8
CHAPTER 2: DISCUSSION FINDINGS

2.1. GEOGRAPHICAL LOCATION:

Nomura-Haiphong Industrial Zone is located in An Hai District, Haiphong City. The location of
Nomura Industrial Park has been carefully selected for its strategic positioning within the
industrial sector, providing optimal access to major transportation routes and a robust
infrastructure conducive to manufacturing and distribution activities. It is extremely conveniently
located for transportation: 85 kilometers from Hanoi via National Highway 5, 13 kilometers from
Haiphong City's core, 2 kilometers from the train station, 15 kilometers from Haiphong Port, and
20 kilometers from Cat Bi Airport. Furthermore, Haiphong Port, northern Vietnam's largest port,
has links to Singapore, Hong Kong, Taiwan (Kaohsiung, Keelung), South Korea (Pusan), and
China (Shekou). The industrial park spans 153 hectares, with 123 ha reserved for industries and
30 hectares for public amenities (Dsi, n.d).
The location of Nomura Industrial Park brings many benefits to Sunrise Group, including
expanding business, increasing exports to other countries, and saving transportation and import-
export costs. The park's proximity to key logistics hubs will significantly reduce transit times and
costs, thereby enhancing the efficiency of supply chain operations.

3
2.2 INFRASTRUCTURE

The utilities within the park are designed to meet the high demands of modern manufacturing
processes. The park is equipped with a comprehensive suite of utilities, including reliable power
sources, water supply, and waste management systems, all of which are essential for maintaining
continuous production cycles and upholding quality standards.

Transportation system: 20–30 m wide and paved with


asphalt concrete according to construction standards,
ensuring conditions for movement in the industrial park,
including goods with large loads. At the same time, traffic
routes are arranged with median strips in the middle, no
sidewalks, trees on both sides of the road, and a lighting
system with a distance of 20 m per pillar.
Power supply system: Nomura Industrial Park has
invested in building an independent 110kV/22kV
transformer station with a maximum capacity of 50 MW.
The 22 lines are underground along the traffic routes to
each plot of land in the industrial park, ready to connect
according to the investor's requirements.
Water supply system: clean water is taken from the Physics water plant, with a water supply
capacity of 13,500 m3/day and night, connected in the form of a branching system through pipes
with diameters of 110-160-280 mm to the foot of the fence of each factory in the industrial park.
Wastewater treatment system: all wastewater collected and treated at the Nomura Industrial
Park will be pre-treated at each factory to the standard level before being discharged into the
central wastewater treatment system of the industrial park and further treated and discharged into
the environment. The capacity of the wastewater treatment plant is up to 10,800 m3/day and
night, with microbiological treatment technology from Japan.
Communication system: Inside Nomura Industrial Park, the communication center system can
provide many services such as domestic and international postal and parcels, authorized post,
EMS, Vnquickpost, UPS, DHL, and a series of other postal and telecommunications services.

10
Fire protection system: a fire protection team and full fire protection equipment such as fire
extinguishers, protective gear, and vehicles are always in good condition, along with a water
supply system that is regularly checked and upgraded. The rainwater drainage system is set up
independently from the wastewater collection and treatment system.

2.3. Security

Security services within Nomura Industrial Park are of paramount importance, ensuring a safe
and secure environment for both assets and personnel. The park employs state-of-the-art
surveillance systems, along with a dedicated security team that monitors the premises around the
clock. This rigorous security infrastructure serves to protect against potential threats and
provides peace of mind for all stakeholders. Monitoring work in the factory is done 24/7 and
must be observed at night, so infrared eyes and cameras with a zoom range of 30 m or more are
required. The locations for installing surveillance cameras in Nomura Hai Phong Industrial Park:

 Entrance and exit areas of factories and workshops in the industrial park: monitor the
entry and exit of factory workers as well as vehicles
 Industrial park fence and outside areas: help detect in time if there is an intruder
 Warehouse and workshop area: ensure no loss of goods in the warehouse of the industrial
park.
 Employee working area: monitor the working attitude and productivity of the workers

CHAPTER 3: RECOMMENDATION

Based on the current situation of Sunrise


Group as well as given multiple advantages,
Nomura Hai Phong Industrial Park is
considered an excellent choice for our
company and the future visions.

Additionally, for smooth and efficient


operation, we are forced to reach a detailed
agreement with the owner of the zone. It is advisable to sign a long-term rental contract of 50

3
years for the advantages of the land use right and time at the lowest possible rental cost
according to their rental policy. In case of unclear and ambiguous matters, it is essential to
confirm on paper with the commune and local authorities, especially those documents
regarding disputed assets or even illegal issues

The below table includes action plans for this project:

- Make a survey of a new location by the engineering team and constructor.


- Prepare a complete contract
- Design manufacturing lines following the current factory.
- Handle and complete regarding legal processes of the project.
- Install equipment and machines in the correct positions based on the standard
- Renovate and restructure in front of the building and other departments.
- Upgrade customer information into the new location.
- Absorb more customers with advertising and marketing campaigns

A CHECKLIST OF SPECIFIC TASKS – DECEMBER 2023


PROJECT DIRECTOR OF
PROJECT NAME
PERIOD PROJECT

SUNRISE GROUP’S
PREMISES Dec 2023 – May
EXPANSION 2024

ACTION PLANS DEPARTMENT ASSIGNED TO: START END REMARKS

Target 1: Venue survey

Tour Venue and Engineer &


check the current Constructor Duc Tai 1 Dec 30 Dec
venues

Evaluate on file Engineer Duc Tai 2 Jan 15 Jan Submit a detail

12
report

Filter information of Marketing Dept.


Tuyet Hoa 1 Dec 15 Dec
project

Require an
Evaluate data and
Tuyet Hoa 16 Dec 30 Dec accuracy and
information Marketing Dept.
loyalty

Negotiation for rental Development Take notes all


Tuyet My 16 Jan 30 Jan
price and time Dept. information

Report the final Development Response in a


Tuyet My 1 Feb 15 Feb
negociation Dept. meeting

Target 2: Reaching a contract

Director of Sales and


Check the contents Project Tuyet My 15 Feb 27 Feb Marketing
Meeting

Director of
Sign a contract Tuyet My 28 Feb 29 Feb Official time
Project

Target 3: Renovation and redesign

Coordinate a
professional Duc Tai 15 Feb 5 Mar
Engineer
contractor

Provide a realistic Accounting


Quoc Dat 6 Mar 14 Mar
budget

Reach a signed Accounting & Quoc Dat & Thien


16 Mar 20 Mar
contract Sales Phuoc

Monitor the progress Duc Tai & Duc 22 Mar 30 Mar Ensure the
of works Toan maximum
safety and
3
Engineer &
security
Security

Target 4: Transferring information to all customers.

Must be
Create advertising Thien Phuoc & authorized
Sales & 1 Apr 15 Apr
and banners Phuoc Thanh before
Marketing
publication

Purchasing A specific list


Place orders Duc Toan 15 Apr 20 Apr
of all items

Must be
Promote social media Thien Phuoc & authorized
Sales & 1 Apr 7 Apr
strategy Phuoc Thanh before
Marketing
publication

Make marketing Sales & Thien Phuoc & Must be


10 Apr 30 Apr
materials Marketing Phuoc Thanh authorized

14
CHAPTER 4: CONCLUSION

By following this detailed action plan, Sunrise Group can effectively manage the expansion
project to NOMURA HAI PHONG INDUSTRIAL PARK, ensuring a smooth transition and
successful operational launch. This structured approach will help mitigate risks, control costs,
and achieve our strategic objectives. Selecting a perfect business location is a significant process
that must be gathered from many various sources of information as well as negotiations across
parties for a long time.

Soronto Industrial Park presents an ideal opportunity for Sunrise Group to expand its footprint in
a location that offers a harmonious blend of accessibility, utility services, security, and worker
welfare. The park's attributes are well-suited to support the company's operational goals and
foster sustainable growth.

I look forward to receiving your responses soon and hope to meet and discuss more details of
this project with you next week.

3
REFERENCES

Khu công nghiệp Nhật Bản - Hải Phòng. (n.d.). https://kland.vn/IndustrialPark/khu-cong-nghiep-

nomura-hai-phong.html

Lắp camera quan sát tại KCN Nomura Hải Phòng. Hotline: 0913010111. (n.d.).

https://congluc.vn/bai-viet/lap-camera-tai-kcn-nomura-hai-phong

Nomura Industrial Park. (n.d.). Nomura Industrial Park. https://nso.com.vn/en/n/detail/nomura-

industrial-park-130

16

You might also like