Concrete

The document provides a detailed quantity survey of concrete materials required for various construction elements, including different grades of concrete (M-10 to M-25) and specific components like footings, columns, and slabs. It lists the quantities of cement, sand, and aggregates needed for each item, along with their ratios. The total quantities of materials for different construction phases, including below plinth, ground floor, first floor, and parapet/stair tower, are also summarized.

Uploaded by

ISHRAF KHAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views2 pages

Concrete

The document provides a detailed quantity survey of concrete materials required for various construction elements, including different grades of concrete (M-10 to M-25) and specific components like footings, columns, and slabs. It lists the quantities of cement, sand, and aggregates needed for each item, along with their ratios. The total quantities of materials for different construction phases, including below plinth, ground floor, first floor, and parapet/stair tower, are also summarized.

Uploaded by

ISHRAF KHAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

QUANTITY SURVEY OF CONCRETE

Materials
Aggregate (Cft)
S.No. Item Quantity Unit Ratio
Cement Sand
(Bag) (Cft) 10mm 20mm 40mm

Upto
Plinth M-10 Concrete 1 Cum. 1:03:06 4.44 16.32 4.90 8.16 19.58
M-15 Concrete 1 Cum. 1:02:04 6.34 15.54 4.66 7.77 18.65
M-20 Concrete 1 Cum. 1;1.5:3 8.06 14.83 4.45 7.42 17.80
M-25 Concrete 1 Cum. 1:01:02 11.09 13.60 4.08 6.80 16.32
1 PCC Below Footing 12.74 Cum. 1:03:06 56.50 207.88 62.37 103.94 249.46
2 Footing Concrete 21 Cum. 1:01:02 232.85 285.55 228.44 342.66
3 Pedestal Column Concrete 2.24 Cum. 1:01:02 24.84 30.46 24.37 36.55
5 Ground Beam Concrete 9.81 Cum. 1:01:02 108.77 133.39 106.72 160.07
7 DPC 30.98 Sqm. 1:02:04 9.81 24.07 19.25 28.88
8 Plinth Beam Concrete 0.5175 Cum. 1:01:02 5.74 7.04 5.63 8.44
9 Floor PCC 12.50 Cum. 1:02:04 79.19 194.24 58.27 97.12 233.09
10 Column Concrete for Sub Structure 2.16 Cum. 1:01:02 23.95 29.37 23.50 35.25
TOTAL MATERIAL FOR BELOW PLINTH 571.58 972.30 546.63 843.07 554.89
Ground Floor
11 Column Concrete for Super Structure 7.20 Cum. 1:01:02 79.83 97.90 78.32 117.49
14 DPC 13.22 Sqm. 1:02:04 4.19 10.27 8.22 12.33
15 Sill Band Concrete 1.32 Cum. 1:01:02 14.66 17.98 14.38 21.57
16 Lintel Beam Concrete 3.00 Cum. 1:01:02 33.31 40.85 32.68 49.02
17 Chajja Concrete 1.05 Cum. 1:01:02 11.68 14.32 11.45 17.18
18 Slab Beam Concrete 11.45 Cum. 1:01:02 126.90 155.63 124.50 186.75
19 Slab Concrete 14.59 Cum. 1:01:02 161.76 198.38 158.70 238.05
20 Staircase Concrete 1.98 Cum. 1:01:02 22.00 26.98 21.58 32.38
TOTAL MATERIAL FOR GROUND FLOOR 454.33 562.30 449.84 674.76
First Floor
38 Column Concrete for Super Structure 7.20 Cum. 1:01:02 79.83 97.90 78.32 117.49
41 DPC 13.22 Sqm. 1:02:04 4.19 10.27 8.22 12.33
42 Sill Band Concrete 1.32 Cum. 1:01:02 14.66 17.98 14.38 21.57
43 Lintel Beam Concrete 3.00 Cum. 1:01:02 33.31 40.85 32.68 49.02
44 Chajja Concrete 1.05 Cum. 1:01:02 11.68 14.32 11.45 17.18
45 Slab Beam Concrete 11.45 Cum. 1:01:02 126.90 155.63 124.50 186.75
46 Slab Concrete 14.59 Cum. 1:01:02 161.76 198.38 158.70 238.05
47 Staircase Concrete 1.98 Cum. 1:01:02 22.00 26.98 21.58 32.38
TOTAL MATERIAL FOR FIRST FLOOR 454.33 562.30 449.84 674.76
PARAPET & STAIR TOWER
65 Column Concrete for Parapet 1.40 Cum. 1:01:02 15.52 19.04 15.23 22.84
66 Column Concrete for Stair Tower 0.84 Cum. 1:01:02 9.31 11.42 9.14 13.71
67 B/W for Stair Tower Cum. 1:06 0.00 0.00 0.00 0.00
68 Sill Band Concrete 0.206 Cum. 1:01:02 2.28 2.80 2.24 3.36
69 Beam Concrete 0.735 Cum. 1:01:02 8.15 9.99 8.00 11.99
70 Slab Concrete 1.08 Cum. 1:01:02 11.93 14.63 11.70 17.55
TOTAL MATERIAL FOR PARAPET FOR STAIR TOWER 47.20 57.88 46.30 69.46
TOATAL QUANTITY OF MATERIALS 1527.43 2154.78 1492.62 2262.05 554.89