0% found this document useful (0 votes)
182 views1 page

15.9 - Demolishing of RR Structure

The document provides a detailed schedule of rates for various dismantling and demolition activities, including the demolition of different types of concrete, brick, and stone work, as well as the removal of doors and windows. Each activity is assigned a unit cost in Indian Rupees (₹) based on the method of demolition and material type. The rates include provisions for manual or mechanical means and disposal of materials within a specified lead distance.

Uploaded by

sy3468557
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views1 page

15.9 - Demolishing of RR Structure

The document provides a detailed schedule of rates for various dismantling and demolition activities, including the demolition of different types of concrete, brick, and stone work, as well as the removal of doors and windows. Each activity is assigned a unit cost in Indian Rupees (₹) based on the method of demolition and material type. The rates include provisions for manual or mechanical means and disposal of materials within a specified lead distance.

Uploaded by

sy3468557
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

15.

0 (Dismantling and Demolishing)


CODE DESCRIPTION UNIT RATE
NO. ₹
15.1 Demolishing lime concrete manually/by mechanical means and disposal of
material within 50 meters lead as per direction of Engineer-in-charge. cum 602.80
15.2 Demolishing cement concrete manually/by mechanical means including
disposal of material within 50 meters lead as per direction of Engineer-in-
charge:
15.2.1 1:3:6 or richer mix (i/c equivalent design mix) cum 1725.20
15.2.2 1:4:8 or leaner mix (i/c equivalent design mix) cum 1064.55
15.3 Demolishing R.C.C. work manually/by mechanical means including
stacking of steel bars and disposal of unserviceable material within 50
meters lead as per direction of Engineer-in-charge. cum 2516.85
15.4 Demolishing R.B work manually/by mechanical means including stacking
of steel bars and disposal of unserviceable material within 50 meters lead
as per direction of Engineer-in-charge. cum 2250.10
15.5 Extra for cutting reinforcement bars manually/by mechanical means in
R.C.C. or R.B. work (Payment shall be made on the cross sectional areas
of R.C.C. or R.B. work) as per direction of Engineer-in-charge. sqm 905.75
15.6 Extra for scrapping, cleaning and straightening reinforcement from R.C.C.
or R.B. work kg 6.95
15.7 Demolishing brick work manually/by mechanical means including
stacking of serviceable material and disposal of unserviceable material
within 50 meters lead as per direction of Engineer-in-charge:
15.7.1 In mud mortar cum 499.20
15.7.2 In lime mortar with old mughal bricks cum 1261.25
15.7.3 In lime mortar cum 602.80
15.7.4 In cement mortar cum 1458.45
15.8 Removing mortar from bricks and cleaning bricks including stacking
within a lead of 50 m. (stacks of cleaned bricks shall be measured) :
15.8.1 From brick work in mud mortar 1000 nos 3358.40
15.8.2 From brick work in lime mortar 1000 nos 3923.15
15.8.3 From brick work in cement mortar 1000 nos 4944.10
15.9 Demolishing stone rubble masonry manually/by mechanical means
including stacking of serviceable material and disposal of unserviceable
material within 50 meters lead as per direction of Engineer-in-charge:
15.9.1 In lime mortar cum 820.40
15.9.2 In cement mortar cum 1740.45
15.10 Dismantling dressed stone work ashlar face stone work, marble work or
precast concrete work manually/by mechanical means including stacking
of serviceable material and disposal of unserviceable material within 50
meters lead as per direction of Engineer-in-charge:
15.10.1 In lime mortar cum 1037.55
15.10.2 In cement mortar cum 2036.40
15.11 Removing mortar from and cleaning stones and concrete articles (net
quantity of stacks of cleaned materials will be measured)
15.11.1 In lime mortar cum 346.80
15.11.2 In cement mortar cum 496.05
15.12 Dismantling doors, windows and clerestory windows (steel or wood)
shutter including chowkhats, architrave, holdfasts etc. complete and
stacking within 50 meters lead :
15.12.1 Of area of 3 sqm. and below each 285.25
15.12.2 Of area beyond 3 sqm. each 390.50
15.13 Taking out doors, windows and clerestory window shutters (steel or wood)
including stacking within 50 meters lead :
15.13.1 Of area of 3 sqm. and below each 110.05
15.13.2 Of area beyond 3 sqm. each 145.75