New
New
Category - wise Assessment and Recovery of Water Charges Report (Rs. In crore)
IDC Sl. Year Assessment of Water Charges Recovery of Wate
No. Domestic Industrial Irrigation Grand Total Domestic
Previous Current Total (4+5) Previous Current Total (7+8) Previous Current Total (6+9+12) Previous Current Total
arrears assessment arrears assessment arrears assessment (10+11) arrears assessment (14+15)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
TIC 1 2019-20 140.26 166.94 307.20 33.15 29.68 62.83 9.17 0.79 9.96 379.99 9.45 131.85 141.30
TIC 2 2020-21 165.33 159.63 324.96 35.68 33.94 69.62 9.35 0.78 10.13 404.71 19.61 149.59 169.20
TIC 3 2021-22 153.31 245.89 399.20 38.15 61.47 99.62 9.50 1.17 10.67 509.49 7.15 224.09 231.24
RIC 1 2019-20 0.53 0.53 1.06 1.05 2.93 3.98 0.53 0.10 0.63 5.67 0.29 - 0.29
RIC 2 2020-21 0.87 0.89 1.76 1.78 3.25 5.03 0.37 0.10 0.47 7.26 0.76 0.54 1.30
RIC 3 2021-22 0.45 1.24 1.69 1.58 4.96 6.54 0.37 0.10 0.47 8.70 0.28 0.66 0.94
NKIPC 1 2019-20 0.06 1.00 1.06 - - - 0.10 0.04 0.14 1.20 0.04 0.83 0.87
NKIPC 2 2020-21 0.11 0.43 0.54 - - - 0.05 0.01 0.06 0.60 0.10 0.42 0.52
NKIPC 3 2021-22 0.03 0.40 0.43 - - - 0.06 0.01 0.07 0.50 0.01 0.36 0.37
Skipc 1 2019-20 0.04 - 0.04 - - - 0.12 0.10 0.22 0.26 - - -
Skipc 2 2020-21 0.23 0.02 0.25 - - - 0.28 0.09 0.37 0.62 - 0.01 0.01
Skipc 3 2021-22 0.23 0.03 0.26 - - - 0.35 0.13 0.48 0.74 - 0.02 0.02
Region 1 2019-20 140.89 168.47 309.36 34.20 32.61 66.81 9.92 1.03 10.95 387.12 9.78 132.68 142.46
2 2020-21 166.54 160.97 327.51 37.46 37.19 74.65 10.05 0.98 11.03 413.19 20.47 150.56 171.03
3 2021-22 154.02 247.56 401.58 39.73 66.43 106.16 10.28 1.41 11.69 519.43 7.44 225.13 232.57
Proforma 6
Category - wise Assessment and Recovery of Water Charges Report (Rs. In crore)
IDC Sl. Year Recovery of Water Charges Outstanding arrears at end
No. Industrial Irrigation Grand Total Domestic Industrial Irriogation Total
Previous Current Total Previous Current Total (6-16) (9-19) (12-22)
arrears assessment (17+18) arrears assessment (20+21)
1 2 3 17 18 19 20 21 22 23 24 25 26 27
TIC 1 2019-20 1.85 26.87 28.72 0.39 0.37 0.76 170.78 165.90 34.11 9.20 209.21
TIC 2 2020-21 2.24 31.66 33.90 0.28 0.36 0.64 203.74 155.76 35.72 9.49 200.97
TIC 3 2021-22 1.79 56.02 57.81 0.27 0.44 0.71 289.76 167.96 41.81 9.96 219.73
RIC 1 2019-20 - 2.11 2.11 0.07 0.07 0.14 2.54 0.77 1.87 0.49 3.13
RIC 2 2020-21 0.22 3.24 3.46 0.04 0.06 0.10 4.86 0.46 1.57 0.37 2.40
RIC 3 2021-22 1.25 5.00 6.25 0.02 0.07 0.09 7.28 0.75 0.29 0.38 1.42
NKIPC 1 2019-20 - - - - 0.02 0.02 0.89 0.19 - 0.12 0.31
NKIPC 2 2020-21 - - - - 0.01 0.01 0.53 0.02 - 0.05 0.07
NKIPC 3 2021-22 - - - - - - 0.37 0.06 - 0.07 0.13
Skipc 1 2019-20 - - - 0.02 0.03 0.05 0.05 0.04 - 0.17 0.21
Skipc 2 2020-21 - - - 0.01 0.01 0.02 0.03 0.24 - 0.35 0.59
Skipc 3 2021-22 - - - 0.03 0.02 0.05 0.07 0.24 - 0.43 0.67
Region 1 2019-20 1.85 28.98 30.83 0.48 0.49 0.97 174.26 166.90 35.98 9.98 212.86
2 2020-21 2.46 34.90 37.36 0.33 0.44 0.77 209.16 156.48 37.29 10.26 204.03
3 2021-22 3.04 61.02 64.06 0.32 0.53 0.85 297.48 169.01 42.10 10.84 221.95
S.R. Tirmanwar
Chief Engineer
Water Resources Department
Kokan Region, Mumbai
Proforma 1
Abstract of Data Collection for Irrigation (Data for Irrigation) (Area in Thousand Hactre)
IDC Sl. Type of No. of Irrigation potential Potential Irrigated area in 2020-21
No. project projects as per Project report developed as on From Wells River / Nalas Total
30th June 2020 Projects
1 2 3 4 5 6 7 8 9 10 = 7+8+9
KIDC (TIC) 1 Major 3 53.690 46.385 23.373 1.170 0.768 25.311
2 Medium 3 6.626 6.626 5.448 - 5.448
3 Minor 86 22.679 21.937 7.966 4.201 12.167
4 Lift 3 2.591 1.988 0.507 1.726 2.233
RIC 1 Major - - -
2 Medium 4 24.312 11.479 3.231 3.231
3 Minor 84 34.945 19.370 6.009 0.005 6.014
4 Lift -
NKIPC 1 Major - - -
2 Medium 3 4.268 1.199 1.199 - 0.002 1.201
3 Minor 19 6.820 2.661 0.105 - 0.003 0.108
4 Lift - - -
Skipc 1 Major 2 38.580 8.798 2.359 2.350 4.709
2 Medium 5 48.216 5.379 2.674 0.145 2.819
3 Minor 9 12.193 1.285 1.048 0.051 1.099
4 Lift - - -
Region 1 Major 5 92.270 55.183 25.732 1.170 3.118 30.020
2 Medium 15 83.422 24.683 12.552 - 0.147 12.699
3 Minor 198 76.637 45.253 15.128 - 4.260 19.388
4 Lift 3 2.591 1.988 0.507 - 1.726 2.233
5 Total 221 254.920 127.107 53.919 1.170 9.251 64.340
टिप: वैतरणा जलाशयातून वैयक्तीक उपसा व वैतरणा जलविद्युत प्रकल्पावरील जलसंधारण विभागाच्या 4 उ.सिं.योजना (आव्हाटे, खरोली, आळवंड,
हरिहर आ.सह.उ.सिं.संस्था) मिळून 927 हेक्टर वगळणेत आले आहे . धरल्यास 64.782 ह.हे प्रत्यक्ष सिंचन होईल.
उपविभागीय अभियंता,
जलसंपदा विभाग, कोकण प्रदेश, मुंबई.
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 1
Proforma 1
Abstract of Data Collection for Irrigation (Data for Irrigation) (Area in Thousand Hactre)
IDC Sl. Type of No. of Irrigation potential Potential Irrigated area in 2021-22
No. project projects as per Project report developed as on From Wells River / Nalas Total
30th June 2022 Projects
1 2 3 4 5 6 7 8 9 10 = 7+8+9
KIDC (TIC) 1 Major 3 53.690 46.385 20.697 1.489 0.954 23.140
2 Medium 3 6.626 6.626 5.069 0.004 5.073
3 Minor 85 22.283 21.937 8.024 3.148 11.172
4 Lift 3 2.591 1.988 0.619 1.400 2.019
RIC 1 Major - - -
2 Medium 4 24.312 16.363 3.163 3.163
3 Minor 84 34.945 20.453 6.288 6.288
4 Lift 0.822 0.822
NKIPC 1 Major - - -
2 Medium 2 14.213 2.110 0.271 0.271
3 Minor 18 15.122 4.353 0.194 0.194
4 Lift - - -
Skipc 1 Major 2 38.580 9.198 2.857 2.857
2 Medium 5 48.216 5.379 3.484 0.377 3.861
3 Minor 9 12.193 1.285 0.753 0.753
4 Lift - - -
Region 1 Major 5 92.270 55.583 23.554 1.489 0.954 25.997
2 Medium 14 93.367 30.478 11.987 - 0.381 12.368
3 Minor 196 84.543 48.028 15.259 - 3.148 18.407
4 Lift 3 2.591 1.988 0.619 - 2.222 2.841
5 Total 218 272.771 136.077 51.419 1.489 6.705 59.613
टिप: वैतरणा जलाशयातून वैयक्तीक उपसा व वैतरणा जलविद्युत प्रकल्पावरील जलसंधारण विभागाच्या 4 उ.सिं.योजना (आव्हाटे, खरोली, आळवंड,
हरिहर आ.सह.उ.सिं.संस्था) मिळून 531 हेक्टर वगळणेत आले आहे . धरल्यास 51.95 हे. हे प्रत्यक्ष सिंचन होईल.
60.14
मनिषा सं. नायक
उपविभागीय अभियंता,
जलसंपदा विभाग, कोकण प्रदेश, मुंबई.
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 1
Proforma 1
Abstract of Data Collection for Irrigation (Data for Irrigation) (Area in Thousand Hactre)
IDC Sl. Type of No. of Irrigation potential Potential Irrigated area in 2022-23
No. project projects as per Project report developed as on From Wells River / Nalas Total
30th June 2023 Projects
1 2 3 4 5 6 7 8 9 10 = 7+8+9
KIDC (TIC) 1 Major 3 40.948 26.451 19.551 1.802 0.527 21.880
2 Medium 4 12.138 3.066 3.241 0.000 0.000 3.241
3 Minor 68 19.287 18.141 4.939 0.000 2.765 7.703
4 Lift 3 1.267 2.926 0.910 0.000 0.000 0.910
RIC 1 Major - - -19.370 -
2 Medium 4 24.312 11.479 3.231 3.231
3 Minor 84 34.945 19.370 6.009 0.005 6.014
4 Lift -
NKIPC 1 Major - - -
2 Medium 3 4.268 1.199 1.199 - 0.002 1.201
3 Minor 19 6.820 2.661 0.105 - 0.003 0.108
4 Lift - - -
Skipc 1 Major 2 38.580 9.463 2.762 0.000 0.000 2.762
2 Medium 5 48.892 5.697 1.660 0.000 0.000 1.660
3 Minor 9 12.110 1.285 1.285 0.000 0.000 1.285
4 Lift 0 0.000 0.000 0.000 0.000 0.000 -
Region 1 Major 5 79.528 16.544 22.313 1.802 0.527 24.642 24,642.00
2 Medium 16 89.610 21.441 9.331 - 0.002 9.333 9,333.00
3 Minor 180 73.162 41.457 12.338 - 2.773 15.110 15,110.49
4 Lift 3 1.267 2.926 0.910 - - 0.910 910.00
5 Total 204 243.567 82.368 44.892 1.802 3.302 49.995 49,995.49
टिप: वैतरणा जलाशयातून वैयक्तीक उपसा व वैतरणा जलविद्युत प्रकल्पावरील जलसंधारण विभागाच्या 4 उ.सिं.योजना (आव्हाटे, खरोली, आळवंड,
हरिहर आ.सह.उ.सिं.संस्था) मिळून 927 हेक्टर वगळणेत आले आहे . धरल्यास 64.782 ह.हे प्रत्यक्ष सिंचन होईल.
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 1
Proforma 2
Year-wise Water use on Private Lift irrigation Scheme
Water use in MCUM
IDC Sl. No. Category Year
Tic RIC NKIPC Skipc Region
1 2 3 4 5 6 7 8 9
Assured water supply 2020-21 3.75 - - - 3.75
(A) Lift on reservoirs of major projects
1 2021-22 4.02 - - - 4.02
(B) Lift on reservoirs of medium projects / canal lifts on major & medium projects/storage tank
without canal 2022-23 2.19 - - - 2.19
2020-21 - - - - -
Regulated water supply with tranmission loss, Regulated river portion below dam/KT weir with
2 2021-22 - - - - -
back up reservoir/tail race from hydro plant
2022-23 - - - - -
2020-21 - 3.10 - - 3.10
Partly Assured Water Supply of minor reservoir with canal/KT weir without back up
3 2021-22 - 3.43 - - 3.43
reservoir/unregulated river without any KT weir or bandhara
2022-23 - 3.39 - - 3.39
Water user entity has constructed or shared proportionate cost on infrastructure (reservoir A.) 2020-21 - - - - -
4 OR the water user entity (such as Gram Panchayat, Naga Palika, Municipal corporation and 2021-22 - - - - -
such other utilities) has constructed dam/bandhara/KT weir at own cost 2022-23 - - - - -
2020-21 3.75 - - - 3.75
TOTAL 2021-22 4.02 - - - 4.02
2022-23 2.19 - - - 2.19
उपविभागीय अभियंता,
जलसंपदा विभाग, कोकण प्रदेश, मुंबई.
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 2
Proforma 3
Water User Association Details
Sr. IDC Year Under the MMISF Act 2005 Under Cooperative Act Total Water use
No Functioning Water Use in Functioning in Water Use in in MCUM
in nos. MCUM nos. MCUM
1 2 3 4 5 6 7 8
1 TIC 2020-21 7 6.81 2 3.75 10.56
2021-22 7 7.18 2 4.016 11.20
2022-23 7 6.29 2 2.19 8.48
2 RIC 2020-21 16 7.45 0 0.00 25.57
2021-22 16 12.06 0 0.00 30.18
2022-23 16 9.80 0 0.00 9.80
3 NKIPC 2020-21 0 0.55 0 0.00 0.55
2021-22 0 0.55 0 0.00 0.55
2022-23 0 0.55 0 0.00 0.55
4 SKIPC 2020-21 0 0.00 0 0.00 0.00
2021-22 0 0.00 0 0.00 0.00
2022-23 0 0.00 0 0.00 0.00
Grand Total 2020-21 0 0.00 0 0.00 0.00
2021-22 0 0.00 0 0.00 0.00
2022-23 0 0.00 0 0.00 0.00
उपविभागीय अभियंता,
जलसंपदा विभाग, कोकण प्रदेश, मुंबई.
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 3
Proforma 4
Source-wise Non Irigation Water Supply (In MCUM)
IDC Sl. Category Year Thane Irrigation Circle, Thane
No. Domestic Industrial
Grampanchayat Local Swarajya Municipal Corporation Total Use of water Water Used Domestic Total
Organisation Domestic Commercial Domestic use by the as Raw use Industrial
(5+6+7+8) process Material use
industries (10+11+12)
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Assured water supply - Major/medium 2020-21 3.290 4.890 8.470 - 16.65 - 0.760 - 0.76
reservoir/Storage tank without canal 2021-22 3.290 2.390 8.470 - 14.15 - 0.720 - 0.72
2022-23 3.290 3.680 7.880 - 14.85 - 0.720 - 0.72
2 Regulated water supply with transmission loss 2020-21 45.620 75.570 522.860 19.230 663.28 258.000 0.600 123.320 381.93
- regulated river portion below dam/KT weir/tail 2021-22 45.620 80.580 532.270 19.430 677.90 261.940 0.290 123.470 385.70
race hydro plant 2022-23 44.850 82.430 541.170 18.520 686.97 265.280 0.710 124.170 390.15
3 Partly Assured Water Supply of minor reservoir 2020-21
0.350 - - - 0.35 - - - -
with canal/KT weir without back up
reservoir/unregulated river without any KT weir 2021-22
or bandhara 0.350 - - - 0.35 - - - -
2022-23
0.350 - - - 0.35 - - - -
total
2020-21 46.260 80.460 1,241.840 19.230 1,390.79 327.080 1.366 123.727 452.18
2021-22 49.260 82.970 1,413.570 19.430 1,565.23 361.510 1.020 123.880 486.41
2022-23 48.490 86.110 1,523.340 18.520 1,676.46 349.890 1.780 124.570 476.23
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 4
Proforma 4
Source-wise Non Irigation Water Supply (In MCUM)
IDC Sl. Category Ratnagiri Irrigation Circle, Ratnagiri
No. Domestic Industrial
Grampanchayat Local Swarajya Municipal Corporation Total Use of water Water Used Domestic Total
Organisation Domestic Commercial Domestic by the as Raw use Industrial
use process Material use
(5+6+7+8) industries (10+11+12)
1 2 3 5 6 7 8 9 10 11 12 13
1 Assured water supply - Major/medium 0.39 - 0.88 - 1.26 - - - -
reservoir/Storage tank without canal 0.39 - 0.88 - 1.26 - - - -
0.40 - 2.08 0.11 2.59 - - - -
2 Regulated water supply with transmission loss 0.50 1.15 - - 1.15 7.20 0.08 4.17 11.45
- regulated river portion below dam/KT weir/tail 0.36 - 0.13 - 0.49 0.14 0.00 0.09 0.23
race hydro plant 1.06 1.57 - - 2.63 - - - -
3 Partly Assured Water Supply of minor reservoir
3.01 - 5.28 0.22 8.51 8.20 0.13 5.46 13.80
with canal/KT weir without back up
reservoir/unregulated river without any KT weir
or bandhara 3.10 - 5.28 0.22 8.60 7.09 0.13 5.46 12.68
total 3.90 1.15 6.15 0.22 10.92 8.29 0.13 5.57 13.99
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 4
Proforma 4
Source-wise Non Irigation Water Supply (In MCUM)
IDC Sl. Category North Kokan Irrigation Project Circle, Kalwa (Thane)
No. Domestic Industrial
Grampanchayat Local Swarajya Municipal Corporation Total Use of water Water Used Domestic Total
Organisation Domestic Commercial Domestic by the as Raw use Industrial
use process Material use
(5+6+7+8) industries (10+11+12)
1 2 3 5 6 7 8 9 10 11 12 13
1 Assured water supply - Major/medium 0.526 1.080 - - 1.606 - - - -
reservoir/Storage tank without canal 0.526 1.080 - - 1.606 - - - -
0.526 1.080 - - 1.606 - - - -
2 Regulated water supply with transmission loss - - - - - - - - -
- regulated river portion below dam/KT weir/tail - - - - - - - - -
race hydro plant - - - - - - - - -
3 Partly Assured Water Supply of minor reservoir
0.038 - 0.490 - 0.528 - - - -
with canal/KT weir without back up
reservoir/unregulated river without any KT weir
or bandhara 0.038 0.170 0.490 - 0.698 - - - -
- 0.170 - - 0.170 - - - -
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 4
Proforma 4
Source-wise Non Irigation Water Supply (In MCUM)
IDC Sl. Category South Kokan Irrigation Project Circle, Sindgudurga
No. Domestic Industrial
Grampanchayat Local Swarajya Municipal Corporation Total Use of water Water Used Domestic Total
Organisation Domestic Commercial Domestic by the as Raw use Industrial
use process Material use
(5+6+7+8) industries (10+11+12)
1 2 3 5 6 7 8 9 10 11 12 13
1 Assured water supply - Major/medium 0.03 - - - 0.03 - - - -
reservoir/Storage tank without canal 0.00 - - - 0.00 - - - -
0.17 0.60 - - 0.77 - - - -
2 Regulated water supply with transmission loss 0.00 - - - 0.00 - - - -
- regulated river portion below dam/KT weir/tail 0.00 - - - 0.00 - - - -
race hydro plant 0.00 - - - 0.00 - - - -
3 Partly Assured Water Supply of minor reservoir
- 0.20 - - 0.20 - - - -
with canal/KT weir without back up
reservoir/unregulated river without any KT weir
or bandhara - - - - - - - - -
- - - - - - - - -
0.002 - - - 0.002 - - - -
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 4
Proforma 4
Source-wise Non Irigation Water Supply (In MCUM)
IDC Sl. Category Kokan Region, Mumbai
No. Domestic Industrial
Grampanchayat Local Swarajya Municipal Corporation Total Use of water Water Used Domestic Total
Organisation Domestic Commercial Domestic use by the as Raw use Industrial
(5+6+7+8) process Material use
industries (10+11+12)
1 2 3 5 6 7 8 9 10 11 12 13
1 Assured water supply - Major/medium 4.226 5.970 9.346 - 19.542 - 0.760 - 0.760
reservoir/Storage tank without canal 4.202 3.470 9.346 - 17.018 - 0.720 - 0.720
4.384 5.359 9.960 0.110 19.813 - 0.720 - 0.720
2 Regulated water supply with transmission loss 46.122 76.720 522.860 19.230 664.932 265.200 0.675 127.492 393.367
- regulated river portion below dam/KT weir/tail 45.981 80.580 532.400 19.430 678.391 262.080 0.290 123.560 385.930
race hydro plant 45.909 84.002 541.170 18.520 689.601 265.280 0.710 124.170 390.160
3 Partly Assured Water Supply of minor reservoir
3.398 0.195 5.766 0.224 9.583 8.200 0.131 5.464 13.795
with canal/KT weir without back up
reservoir/unregulated river without any KT weir
or bandhara 3.484 0.170 5.766 0.224 9.644 7.085 0.131 5.464 12.680
total 50.746 82.885 1,248.482 19.454 1,404.567 342.480 1.572 133.363 477.415
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 4
Proforma 5
Annual Expenditure of Operation and Maintenance (Rs. In Crore)
IDC Sr. Year Operation and Maintenance Expenditure Total Operation
No. O&M and Repair Work Establishment and Maintenance
Canal Headwo Govt.- Total Permanent (RT) Temporary (CRT) Total Expenditure (7+16)
rk LIS (4+5+6) No. of Posts Expenditure No. of Posts Expenditure (11+15)
Sanctioned Filled Vacant Sanctioned Filled Vacant
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
TIC 1 2020-21 10.41 49.41 0.00 59.82 305 158 147 78.04 51 51 7 31.59 109.63 165.81
2 2021-22 7.609 53.72 0 61.33 305 154 151 59.86 40 39 8 43.183 103.04 157.22
3 2022-23 5.81 40.69 0 46.50 305 156 149 46.72 40 40 8 16.016 62.74 101.68
RIC 1 2020-21 1.13 0.30 - 1.43 104 48 56 3.53 14 14 - 0.86 4.39 5.82
2 2021-22 0.58 0.21 - 0.80 104 42 62 3.40 11 11 - 0.78 4.18 4.98
3 2022-23 2.33 0.98 - 3.31 104 42 62 3.59 7 7 - 0.69 4.28 7.59
NKIPC 1 2020-21 0.88 1.94 - 2.82 104 51 53 3.97 4 4 - 0.18 4.15 6.09
2 2021-22 0.02 0.80 - 0.82 104 48 56 4.08 3 3 - 0.22 4.30 5.12
3 2022-23 0.57 5.10 - 5.67 86 47 39 4.20 1 1 - 0.14 4.34 10.01
SKIPC 1 2020-21 17.46 0.32 - 17.78 302 142 160 8.06 68 68 - 2.46 10.52 28.30
2 2021-22 62.28 0.08 - 62.36 302 133 169 8.88 56 56 - 2.30 11.18 73.54
3 2022-23 6.04 - - 6.04 302 121 181 9.74 39 39 - 2.25 11.99 18.03
Region 1 2020-21 29.88 51.97 - 81.85 815 399 416 93.60 137 137 7 35.09 128.69 206.02
2 2021-22 70.49 54.82 - 125.31 815 377 438 76.22 110 109 8 46.48 122.71 240.86
3 2022-23 14.76 46.77 - 61.53 797 366 431.00 64.25 87 87 8 19.10 83.35 137.31
मनिषा सं.
उपविभागीय अभि
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 5
मनिषा सं. नायक
उपविभागीय अभियंता,
file:///conversion/tmp/activity_task_scratch/903932019.xlsxForm 5
Proforma 6
Category - wise Assessment and Recovery of Water Charges Report (Rs. In crore)
IDC Sl. Year Assessment of Water Charges Recovery of Wate
No. Domestic Industrial Irrigation Grand Total Domestic
Previous Current Total (4+5) Previous Current Total (7+8) Previous Current Total (6+9+12) Previous Current Total
arrears assessment arrears assessment arrears assessment (10+11) arrears assessment (14+15)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
TIC 1 2020-21 138.09 1,502.56 1,640.65 49.31 3,289.40 3,338.71 444.15 48.51 492.66 5,472.02 23.63 812.58 836.21
TIC 2 2021-22 738.14 1,034.18 1,772.32 560.03 4,127.17 4,687.20 423.50 44.25 467.75 6,927.26 10.14 793.77 803.91
TIC 3 2022-23 857.13 968.81 1,825.94 513.00 5,795.56 6,308.56 521.52 43.70 565.22 8,699.71 57.69 864.02 921.71
RIC 1 2020-21 0.52 1.51 2.04 0.28 5.05 5.33 0.43 0.08 0.51 7.88 0.01 0.91 0.91
RIC 2 2021-22 1.41 1.71 3.12 0.09 6.03 6.12 0.56 0.10 0.66 9.91 0.05 1.77 1.82
RIC 3 2022-23 1.31 2.99 4.30 0.38 9.19 9.57 0.60 0.12 0.71 14.58 0.93 1.37 2.30
NKIPC 1 2020-21 0.08 1.00 1.08 0.71 0.10 0.81 0.05 0.02 0.08 1.97 0.04 0.86 0.90
NKIPC 2 2021-22 0.10 2.90 3.00 0.07 0.31 0.38 0.07 0.02 0.09 3.47 0.05 4.96 5.01
NKIPC 3 2022-23 1.68 3.65 5.33 0.17 0.37 0.54 0.08 0.02 0.10 5.97 1.60 1.04 2.64
Skipc 1 2020-21 0.31 0.05 0.36 - 0.01 0.01 0.50 0.15 0.65 1.02 - 0.00 0.00
Skipc 2 2021-22 0.36 0.04 0.40 - 0.01 0.01 0.59 0.11 0.70 1.10 - 0.00 0.00
Skipc 3 2022-23 2.01 0.03 2.04 - - - 0.65 0.09 0.74 2.78 0.03 0.73 0.76
Region 1 2020-21 139.00 1,505.13 1,644.13 50.31 3,294.55 3,344.86 445.14 48.76 493.90 5,482.89 23.67 814.35 838.02
2 2021-22 740.02 1,038.82 1,778.84 560.19 4,133.52 4,693.71 424.73 44.47 469.20 6,941.74 10.24 800.50 810.74
3 2022-23 862.12 975.49 1,837.61 513.55 5,805.12 6,318.66 522.85 43.92 566.77 8,723.05 60.26 867.15 927.41
1,753.53 4,785.74 509.96 7,049.23 858.72
49% 77% 4,988.99
6,472.55
8,156.27
6,539.27
Proforma 6
Category - wise Assessment and Recovery of Water Charges Report (Rs. In crore)
IDC Sl. Year Recovery of Water Charges Outstanding arrears at end
No. Industrial Irrigation Grand Total Domestic Industrial Irriogation Total
Previous Current Total Previous Current Total (6-16) (9-19) (12-22)
arrears assessment (17+18) arrears assessment (20+21)
1 2 3 17 18 19 20 21 22 23 24 25 26 27
TIC 1 2020-21 17.13 2,784.50 2,801.63 9.42 8.49 17.91 3,655.75 804.44 537.08 474.75 1,816.27
TIC 2 2021-22 556.88 3,173.09 3,729.97 0.82 0.65 1.47 4,535.36 968.41 957.22 466.28 2,391.91
TIC 3 2022-23 136.37 4,351.74 4,488.11 1.38 0.40 1.78 5,411.60 904.23 1,820.45 563.44 3,288.12
RIC 1 2020-21 0.12 5.07 5.19 0.01 0.07 0.09 6.19 1.12 0.14 0.43 1.69
RIC 2 2021-22 - 5.74 5.74 0.01 0.06 0.07 7.62 1.31 0.38 0.60 2.29
RIC 3 2022-23 0.05 8.04 8.08 0.02 0.07 0.09 10.48 2.00 1.48 0.62 4.11
NKIPC 1 2020-21 - 0.09 0.09 0.00 0.01 0.01 1.00 0.18 0.72 0.07 0.97
NKIPC 2 2021-22 - 0.54 0.54 0.01 0.00 0.01 5.56 -2.01 -0.16 0.08 -2.10
NKIPC 3 2022-23 0.17 0.11 0.28 0.01 0.01 0.01 2.94 2.68 0.26 0.09 3.03
Skipc 1 2020-21 0.00 0.06 0.06 0.00 0.06 0.06 0.12 0.36 -0.05 0.59 0.90
Skipc 2 2021-22 0.01 0.03 0.05 0.01 0.03 0.05 0.10 0.40 -0.04 0.65 1.01
Skipc 3 2022-23 0.00 0.04 0.04 0.00 0.04 0.04 0.84 1.29 -0.04 0.70 1.94
Region 1 2020-21 17.25 2,789.71 2,806.97 9.44 8.63 18.06 3,663.06 806.10 537.89 475.84 1,819.83
2 2021-22 556.90 3,179.41 3,736.31 0.85 0.75 1.60 4,548.64 968.10 957.40 467.60 2,393.10
3 2022-23 136.59 4,359.93 4,496.52 1.41 0.51 1.92 5,425.85 910.20 1,822.14 564.85 3,297.19
3,679.93 7.20 4,545.85 64%
3,644.99 73% 4%
4,547.04 70% 0% मनिषा सं. नायक
5,423.93 67% 0% उपविभागीय अभियंता,
4,538.66 69% 1% जलसंपदा विभाग, कोकण प्रदेश, मुंबई.
Proforma 7
Reduction / Increase in Revenue due to concession / incentives / Penalties (Rs. In crore)
Reduction / Increase in revenue due to concession / incentives offered to
IDC Sl. No. Year
Domestic Uses Industrial Uses Total
Agriculture uses
Absence of Absence of
Excess use Pollution Total Excess use Pollution Total 4+8+12
meter meter
1 2 3 4 5 6 7 8 9 10 11 12 13
TIC 1 2020-21 0 0 1.101 0 0.101 0 6.870 0 6.870 6.970
2 2021-22 0 0 1.142 0 0.142 0 10.020 0 0.870 1.014
3 2022-23 0 0 0.141 0 0.141 0 8.650 0 8.650 8.791
RIC 1 2020-21 0 0 16.109 0 16.11 0 0 0 0 16.109
2 2021-22 0 0 17.702 0 17.7 0 0 0 0 17.702
3 2022-23 0 0 28.396 0 28.4 0 0 0 0 28.396
NKIPC 1 2020-21
2 2021-22 Nil
3 2022-23
SKIPC 1 2020-21
2 2021-22 Nil
3 2022-23
Region 1 2020-21
2 2021-22 Nil
3 2022-23
RIC Nil
NKIPC Nil
SKIPC Nil
1 2 3 4 5 6 7 8 9
1 2020-21 2.86 3.75 0 188.125 0 194.735
TIC 2 2021-22 11.268 15.532 0 1058.31 0 1085.11
3 2022-23 18.298 19.912 0 1569.202 0 1607.412
RIC 1 2020-21 8.140 0.000 3.100 40.834 9.950 62.024
2 2021-22 8.450 0.000 3.492 43.094 10.732 65.768
3 2022-23 9.800 0.000 3.388 39.374 7.315 59.877
NKIPC 1 2020-21 0.550 0.000 0.000 0.840 0.000 1.390
2 2021-22 0.550 0.000 0.000 2.039 0.000 2.589
3 2022-23 0.550 0.000 0.000 2.005 0.000 2.555
Skipc 1 2020-21
2 2021-22
3 2022-23
Region 1 2020-21 11.550 3.750 3.100 229.799 9.950 258.149
2 2021-22 20.268 15.532 3.492 1103.443 10.732 1153.467
3 2022-23 28.648 19.912 3.388 1610.581 7.315 1669.844
#NAME?
Industrial Tariff 2017-18
Source Process Raw
Tariff in % Water Drawl Total Revenue Tariff in % Water Drawl Total Revenue
Rs. / m3 in Mm3 in Rs. Millions Rs. /10 m3 in Mm3 in Rs. Millions
Assured Water Supply 4.80 0.00 0.00 0.00 120.00 0.18 0.72 86.40
Regulated Water Supply 9.60 72.27 281.51 2702.50 240.00 0.07 0.29 69.68
Partly Assured Water Supply 2.40 1.88 7.31 17.54 60.00 0.03 0.13 7.86
Reservoir Constructed by WUE 0.77 25.56 99.57 76.47 19.20 0.00 0.01 0.19
99.71 388.39 2796.51 0.28 1.15 164.13
Total 2960.64 against 2142.04
file:///conversion/tmp/activity_task_scratch/903932019.xlsx Ind_2017-18
Domestic Tariff 2017-18
Source GP ULB MC Township
Tariff in Water Total Tariff in Water Drawl Total Tariff in Water Drawl Total Tariff in Water Drawl Total Revenue
Rs. /m3 Drawl in Revenue in Rs. /m3 in Mm3 Revenue in Rs. /m3 in Mm3 Revenue in Rs. /m3 in Mm3 in Rs. Millions
Mm 3
Rs. Millions Rs. Millions Rs. Millions
Assured Water Supply 0.15 4.20 0.63 0.18 3.47 0.62 0.25 9.35 2.34 1.25 0.00 0.00
Regulated Water Supply 0.30 45.98 13.79 0.36 80.58 29.01 0.50 532.40 266.20 2.50 123.56 308.90
Partly Assured Water 0.08 3.48 0.26 0.09 0.17 0.02 0.13 5.77 0.72 0.63 5.46 3.42
Supply
Reservoir Constructed 0.02 0.00 0.00 0.03 0.00 0.00 0.04 872.83 34.91 0.20 0.41 0.08
by WUE
53.67 14.68 84.22 29.65 1420.34 304.17 129.43 312.40
Total 660.90 against 798.73 137.83
file:///conversion/tmp/activity_task_scratch/903932019.xlsx Dom_2017-18
अ. क्र. घटक सिंचन घरगुती औद्योगिक एकूण
1 देखभाल दुरुस्ती खर्चाचे विभाग निहाय वितरण(%)19.00 22.00 59.00 100.00
2 देखभाल दुरुस्ती खर्च (रु.दशलक्ष) 834.00 966.00 2590.00 4390.00
3 पाणी वापर दलघमी (Net water use) #NAME? 1278.24 242.61 #NAME?
4 प्रति घन मीटर दर (रु.) (2/3) #NAME? 0.76 10.68 #NAME?
5 मागील दर (रु.) 1.36 0.47 #NAME? #NAME?
6 वाढीची टक्केवारी (%) #NAME? 61 #NAME? #NAME?
सिंचन क्षेत्र ( हजार हेक्टर )
अ. क्र. उदभव एकूण
खरीप रब्बी उन्हाळ दुहंगामी फळबागा उस/केळी
1 क्षेत्र
प्रकल्प 37.633 8.141 4.362 0 1.714 0 51.85
विहिरी 0 1.024 1.024 0 0 0 2.048
नदी नाले 1.714 3.267 0.965 0 0.947 0 6.893
एकूण 39.347 12.432 6.351 0 2.661 0 60.791
पाणी वापर दलघमी
पाणी वापर 5.54 413.06 89.83 0 0 0 508.43
7.10 0.03 0.07 #DIV/0! #DIV/0! #DIV/0! 0.12
अ. प्रकल्प सिंचित क्षेत्र
क्र प्रकार
. प्रकल्पावरील
विहीरीवरीलनदी नाल्यावरील एकुण
1 मोठे 24.97 2.05 0.53 27.55
2 मध्यम 10.11 0.00 0.29 10.40
लघु 16.35 0.00 4.23 20.58
.
3 उपसा 0.42 0.00 1.84 2.26
अ) एकुण 51.85 2.05 6.89 60.79
प्रकल्प सिंचीत क्षेत्र हजारप्रति हे.दर (देखभाल दुरुस्ती)
रक्कम रु. कोटी
मोठे प्रकल्प 27.55 2000 5.51
मध्यम प्रकल्प रु. 10.40 2000 2.08
लघु प्रकल्प रु. 20.58 1332 2.74
उपसा योजना रु. 2.26 2000 0.45
डोंगराळ भाग (7.5%) 0 0 0.81
विद्युत देयके 0 0 1.55
एकूण 13.14
अ. क्र. उद्भव ग्रामपंचायत नगरपालिका महापालीका
क्षेत्रे (GP) क्षेत्रे (ULB) क्षेत्रे (MC)
बाजरी 415.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
गहु 0.00 0.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00
ज्वारी 415.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
भुसार
1
पिके
मका 415.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
भात 415.00 0.00 0.00 750.00 0.00 0.00 1330.00 0.00 0.00
सरासरी दर = 415.00 0.00 0.00 750.00 0.00 0.00 1330.00 0.00 0.00
भुईमुग 415.00 0.00 0.00 750.00 0.00 0.00 1330.00 0.00 0.00
कांदे 900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
मिरची 0.00 180.00 0.00 0.00 360.00 0.00 0.00 540.00 0.00
सोयाबिन 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
मुग 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
तुर 0.00 180.00 0.00 0.00 360.00 0.00 0.00 540.00 0.00
आले 0.00 180.00 0.00 0.00 360.00 0.00 0.00 540.00 0.00
2 नगदी पिके कपाशी व इतर 0.00 675.00 0.00 0.00 1350.00 0.00 0.00 2025.00 0.00
केळी 0.00 0.00 1575.00 0.00 0.00 3150.00 0.00 0.00 4710.00
पपई 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
हळद 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
भाजीपाला 900.00 0.00 0.00 1800.00 0.00 0.00 2700.00 0.00 0.00
फळबाग व इतर 0.00 0.00 1185.00 0.00 0.00 2370.00 0.00 0.00 3525.00
सरासरी दर = 738.33 303.75 1445.00 1275.00 607.50 2890.00 2015.00 911.25 4315.00
भाववाढ निर्देशांकानुसार येणारे दर = 817.05 336.14 1599.06 1410.94 672.27 3198.13 2229.83 1008.41 4775.06
उन्हाळी उन्हाळी
अ. क्र. प्रस्तावित दर खरीप खरीप दुहंगामी खरीप बारमाही रब्बी रब्बी दुहंगामी रब्बी बारमाही उन्हाळी
दुहंगामी बारमाही
1 भुसार पिके #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 नगदी पिके #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
प्रवाही सिंचना करीता हंगाम निहाय, पिक निहाय, क्षेत्र निहाय परिगणित जलदर
1 बाजरी 415.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 गहु 415.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 ज्वारी 415.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 मका 415.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 भात 0.00 750.00 1330.00 0.00 0.00 0.00 0.00 0.00 0.00
6 भुईमुग 0.00 750.00 1330.00 0.00 0.00 0.00 0.00 0.00 0.00
7 कांदे 900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 मिरची 0.00 0.00 0.00 180.00 360.00 540.00 0.00 0.00 0.00
9 सोयाबिन 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 मुग 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 तुर 0.00 0.00 0.00 180.00 360.00 540.00 0.00 0.00 0.00
12 आले 0.00 0.00 0.00 180.00 360.00 540.00 0.00 0.00 0.00
13 कपाशी व इतर 0.00 0.00 0.00 675.00 1350.00 2025.00 0.00 0.00 0.00
15 केळी 0.00 0.00 0.00 0.00 0.00 0.00 1575.00 3150.00 4710.00
16 पपई 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17 हळद 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 भाजीपाला 900.00 1800.00 2700.00 0.00 0.00 0.00 0.00 0.00 0.00
19 फळबाग व इतर 0.00 0.00 0.00 0.00 0.00 0.00 1185.00 2370.00 3525.00
हंगाम खरीप रब्बी उन्हाळी खरीप / रब्बी / उन्हाळी दुहंगामी खरीप / रब्बी / उन्हाळी बारमाही
दिनांक 1 फेब्रुवारी 2018 ते दिनांक 30 जून 2020 साठी उपसा सिंचनाचे दर ( रुपये प्रती हेक्टर )
अ.
वर्गवारी पाणीपुरवठा स्त्रोत
क्र. ऊस / केळी फळबाग अन्य पिके
दिनांक 1 फेब्रुवारी 2018 ते दिनांक 30 जून 2020 साठी उपसा सिंचनाचे दर ( रुपये प्रती हेक्टर )
अ.
वर्गवारी पाणीपुरवठा स्त्रोत
क्र. ऊस / केळी फळबाग अन्य पिके
अ.
हंगाम नोंदणीकृत पाणी वापर संस्था वैयक्तिक लाभधारकांकरीता
क्र.
अ. क्र. प्रस्तावित दर
खरीप रब्बी उन्हाळी
आश्वासित
1 #NAME? #NAME? #NAME?
पाणीपुरवठा
अंशत:आश्वासित पाणी
3 2% 8.5 0.00% 0.003
पुरवठा
#NAME?
च्चा माल
निव्वळ देय पाणीपट्टी आकारणीचा
तपशील
दर/प्रती पाणीपट् लोकल फंड एकूण
युनीट टी रु. (8X0.20 (8+9)
(6X7) )
#NAME?
#NAME?
#NAME?
#NAME?
1
#NAME?
अ. क्र. उदभव ग्रामपंचायत क्षेत्रे (GP) नगरपालिका क्षेत्रे (ULB) महापालीका क्षेत्रे (MC)
% पाणीवापर % पाणीवापर % पाणीवापर
1 आश्वासित पाणीपुरवठा 0.00% 4.384 0.00% 5.359 1.00% 9.960
2 वहन व्ययासह नियंत्रित पाणीप 3.00% 45.91 5.00% 84.0021 37.00% 665.34
3 अंशत: आश्वासित पाणी पुरवठा 0.00% 3.37 0.00% 0.17 1.00% 14.554
4 स्वामित्व दराने पाणी पुरवठा 0.00% 0.01 0.00% 0 54.00% 974.69
एकूण 3.00% 53.673 5.00% 89.531 92.00% 1664.544
एकूण पाणी वापर (दलघमी) 1807.75