Site Review PDF

The document is a review of various registers maintained by B. G. Shirke Construction Tech. Pvt. Ltd. for the EE & SM (C) - II/WPZ division, detailing the titles, identification numbers, dates of issue, and compliance remarks. Each register has specific updates and pending actions, with several requiring signatures from responsible personnel. The next review date is set for May 2, 2025.

Uploaded by

vaibhav0072197
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views6 pages

Site Review PDF

The document is a review of various registers maintained by B. G. Shirke Construction Tech. Pvt. Ltd. for the EE & SM (C) - II/WPZ division, detailing the titles, identification numbers, dates of issue, and compliance remarks. Each register has specific updates and pending actions, with several requiring signatures from responsible personnel. The next review date is set for May 2, 2025.

Uploaded by

vaibhav0072197
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Review by CPWD on

MASTER REGISTER RECORD


26.04.2025
Next review date
02.05.2025
Date of first Responsible
Sr. No. Title of Register Volume No. Identification No. Issued by Issued to Date of Issue Material updated upto Remarks Review Remarks
Entry person from BGS

1 Drawing Register I DR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.


15.11.2022
Tech. Pvt. Ltd. All Aes Amith salunke (Rahul & AE Sign)

2 Hinderance Register I HR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.


15.11.2022
Tech. Pvt. Ltd. 15.11.2022
Need to compliance Ingale/Tarik sir

Need to compliance
3 Site Order Book I SOB/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
15.11.2022
Tech. Pvt. Ltd. 15.11.2022 Ingale/Tarik sir To be enter

4 Inspection Register I IR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.


15.11.2022
Tech. Pvt. Ltd.
Need to compliance Ingale/Tarik sir

5 Test Outward And Inward Register (online) I TOI/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
15.11.2022
Tech. Pvt. Ltd. updated MAHESH

6 Dispatch Register (WPZ) I

7 Dispatch Register (WPZ) II

8 Moisture correction Register I MCR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
15.11.2022
Tech. Pvt. Ltd. 29.04.2023 24.02.2025 AE sign pending SAI

9 Moisture correction Register II MCR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
24.02.2025
Tech. Pvt. Ltd. 17.04.2025
contractor,AE sign pending,
Index page is not pasted
SAI

Not updated, AE sign pending
10 Trial Mix-Register Of Work Test Of Concrete I CTM/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
08.03.2023
Tech. Pvt. Ltd. 08.03.2023 04.12.2024 RAGUNATH Tree diagram,Entry missing

11 Particle Size Distribution Of Sand Register I PSDFA/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
15.11.2022
Tech. Pvt. Ltd. 17.04.2023 08.07.2024 Completed GANESH

12 Particle Size Distribution Of Sand Register II PSDFA/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
08.07.2024
Tech. Pvt. Ltd. 08.07.2024 09.04.2025 AE sign is pending GANESH

13 Particle Size Distribution Coarse Aggregate Register I PSDCA/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
17.04.2023
Tech. Pvt. Ltd. 17.04.2023 04.05.2024 Completed GANESH

14 Particle Size Distribution Coarse Aggregate Register II PSDCA/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
06.05.2024
Tech. Pvt. Ltd. 06.05.2024 10.04.2025 AE sign pending GANESH

15 Paint Register I PR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
15.11.2022
Tech. Pvt. Ltd. Update is pending RAGUNATH

16 Sample Approval Register I SA/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
02.02.2023
Tech. Pvt. Ltd. 02.02.2023 11.09.2024 Updates are required RAGUNATH Entry missing

17 Slump Test Register I ST/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
05.01.2023
Tech. Pvt. Ltd. 07.01.2023 03.02.2024
Required slump range not
mentioned
SURESH G

18 Slump Test Register II ST/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const.1.2.2024
Tech. Pvt. Ltd. 03.02.2024 9.12.2024 TPQA sign pending SURESH G

19 Slump Test Register III ST/EE & SM ( C ) - II/WPZ/03 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
07.12.2024
Tech. Pvt. Ltd. 09.12.2024 23.04.2025 Agency and AE sign pending SURESH G

20 Requirement For Fitting And Fixtures I FF/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
15.11.2022
Tech. Pvt. Ltd. Item not executed RAGUNATH

Ben-27.03.24,
Register Of Materials At Site Accounts-Volume water-28.03.25,
21 I(Bentonite,Sika 502PR,Cement
PPC(Both),Flyash,Cement PPC)
I MAS/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd. 17.04.2023 Cement-1.03.2024,
fly ash-26.02.2024-
AE sign is pending MAHESH

completed

Water 7.11.2023 21.04.2025 Ae sign pending MAHESH



Register Of Materials At Site Accounts-Volume
22 II(Sika 440PR,Flyash,Cement(Both),Sika II MAS/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd.
22 II(Sika 440PR,Flyash,Cement(Both),Sika II MAS/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd.
923PR,Cement OPC) Fyl ash 26.02.2024 24.04.2025 Ae sign pending MAHESH

cement- 02.03.2024 16.08.2024 Ae sign pending MAHESH

Water reducing 22.04.2024 21.04.2025 Ae sign pending MAHESH

23
Register Of Materials At Site Accounts-Volume
III(Cement)
III MAS/EE & SM ( C ) - II/WPZ/03 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
14.08.2024
Tech. Pvt. Ltd. 17.08.2025 23.04.2025 Completed MAHESH

24
Register Of Materials At Site Accounts-Volume
IV(PPC cement bags)
IV MAS/EE & SM ( C ) - II/WPZ/04 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
20.11.2023
Tech. Pvt. Ltd. 22.11.2023 19.04.2025 AE sign pending MAHESH

25 Steel Procurement Register I SR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd. 15.02.2023 14.04.2025 Completed RAM

26 Observation/ Weight Register I OR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd. 15.02.2023 14.04.2025 Remarks pending RAM

27 Bentonite Register I BCR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd. 17.04.2023 23.07.2024 Completed RAM/MAHESH

28 RMC Receipt Register-M40(Cast in situ) I RMC/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
18.04.2023
Tech. Pvt. Ltd. 18.04.2023 19.03.2025 AE sign pending RAM/MAHESH Todakar AE sign

29 RMC Receipt Register-M50(Precast & Cast in situ) I RMC/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
06.11.2023
Tech. Pvt. Ltd. 06.11.2023 31.03.2025 Ae sign pending RAM/MAHESH

30 RMC Receipt Register-M40(Precast & Cast in situ) I RMC/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const. Tech. Pvt. Ltd. 13.06.2024 31.03.2025 EE & AE sign is pending RAM/MAHESH

31 RMC Receipt Register-M50(SCC) EE & SM ( C ) - II/WPZ B. G. Shirke Const.
01.05.2024
Tech. Pvt. Ltd. 02.05.2024 31.03.2025 AE sign is pending RAM/MAHESH

32 RMC Receipt Register-M40(SCC) EE & SM ( C ) - II/WPZ B. G. Shirke Const. Tech. Pvt. Ltd. 03.03.2025 31.03.2025 EE sign pending RAM/MAHESH

33 RMC Receipt Register-M20 I RMC/EE & SM ( C ) - II/WPZ/03 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.10.2023
Tech. Pvt. Ltd. 16.10.2023 24.03.2025 Completed RAM/MAHESH

34 RMC Receipt Register-M60 I RMC/EE & SM ( C ) - II/WPZ/04 EE & SM ( C ) - II/WPZ B. G. Shirke Const. Tech. Pvt. Ltd.
25.05.2024 25.05.2024 31.03.2025 Contractor and AE sign pending RAM/MAHESH

35 Cement consumption Register I CCR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd. 29.04.2023 31.03.2023 AE sign pending RAM/MAHESH

36 Fly ash consumption Register I FCR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd. 29.04.2023 31.03.205 AE sign pending RAM/MAHESH

37 Admixture Register(502PR-Sika) I ACR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd. 29.04.2023 31.03.2025 AE sign pending RAM/MAHESH

38 Admixture Register(440PR-Sika) I ACR/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
13.12.2023
Tech. Pvt. Ltd. 13.12.2023 31.03.2025 AE sign is pending RAM/MAHESH

39 Cement Register(PPC) I CR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
22.11.2023
Tech. Pvt. Ltd. 22.11.2023 18.01.2024 Completed GANESH

40 Silt Content Of Sand Register I SC/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
16.01.2023
Tech. Pvt. Ltd. 17.04.2023 10.04.2025 contractor & AE sign pending GANESH

I CCR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
14.12.2023
Tech. Pvt. Ltd. 14.12.2023 Not updated, AE sign pending MAHESH

Fosroc HDPE membrane
14.12.2023 14.12.2023 12.04.2025 AE sign pending MAHESH

41
Chemical Register(Rendroc RG,Nitobond
AR,Nitobond 600PF)
Nito proof 600 PF14.12.2023 14.12.2023 03.04.2025 AE sign pending MAHESH

Rendroc RG 14.12.2024 05.2.2023 17.12.2024 AE sign pending MAHESH

Nitobond AR 14.12.2025 05.12.2023 18.12.2024 AE sign pending MAHESH

42 Register Of Work Test Of Concrete(Volume-I) I CT/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
07.01.2023
Tech. Pvt. Ltd. 07.01.2023 01.08.2023 Completed RAM

43 Register Of Work Test Of Concrete(Volume-II) II CT/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
31.07.2023
Tech. Pvt. Ltd. 01.08.2023 22.09.2023 Completed RAM

44 Register Of Work Test Of Concrete(Volume-III) III CT/EE & SM ( C ) - II/WPZ/03 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
20.09.2023
Tech. Pvt. Ltd. 22.09.2023 01.11.2023 Completed RAM

45 Register Of Work Test Of Concrete(Volume-IV) IV CT/EE & SM ( C ) - II/WPZ/04 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
01.11.2023
Tech. Pvt. Ltd. 01.11.2023 19.12.2023 Completed RAM

46 Register Of Work Test Of Concrete(Volume-V) V CT/EE & SM ( C ) - II/WPZ/05 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
18.12.2023
Tech. Pvt. Ltd. 19.12.2023 06.02.2024 Completed RAM

47 Register Of Work Test Of Concrete(Volume-VI) VI CT/EE & SM ( C ) - II/WPZ/06 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
05.02.2024
Tech. Pvt. Ltd. 06.02.2024 15.04.2024 Completed RAM

48 Register Of Work Test Of Concrete(Volume-VII) VII CT/EE & SM ( C ) - II/WPZ/07 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
12.04.2024
Tech. Pvt. Ltd. 15.04.2024 01.06.2024 Completed RAM

49 Register Of Work Test Of Concrete(Volume-VIII) VIII CT/EE & SM ( C ) - II/WPZ/08 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
01.06.2024
Tech. Pvt. Ltd. 01.06.2024 08.08.2024 Completed,Remark is pending RAM

50 Register Of Work Test Of Concrete(Volume-IX) IX CT/EE & SM ( C ) - II/WPZ/09 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
08.08.2024
Tech. Pvt. Ltd. 08.08.2024 25.10.2024 Completed RAM

51 Register Of Work Test Of Concrete(Volume-X) X CT/EE & SM ( C ) - II/WPZ/10 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
23.10.2024
Tech. Pvt. Ltd. 25.10.2024 21.12.2024 Remarks pending RAM

52 Register Of Work Test Of Concrete(Volume-XI) XI CT/EE & SM ( C ) - II/WPZ/11 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
21.12.2024
Tech. Pvt. Ltd. 21.12.2024 30.01.2025 Ae sign pending RAM

53 Register Of Work Test Of Concrete(Volume-XII) XII CT/EE & SM ( C ) - II/WPZ/12 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
30.01.2025
Tech. Pvt. Ltd. 30.01.2025 10.3.2025
Ae sign pending, Remarks
pending
RAM

54 Register Of Work Test Of Concrete(Volume-XIII) XIII CT/EE & SM ( C ) - II/WPZ/10 EE & SM ( C ) - II/WPZ B. G. Shirke Const. Tech. Pvt. Ltd. 10.03.2025 17.04.2025
EE sign pending,Contractor and
Ae sign pending,Remarks
RAM

55 Register Of Work Test Of Concrete(Volume-XIV) XIV CT/EE & SM ( C ) - II/WPZ/10 EE & SM ( C ) - II/WPZ B. G. Shirke Const. Tech. Pvt. Ltd. 17.04.2025 23.04.2025
EE sign , AE sign &Contractor
sign
RAM

56 Admixture Register(923PR-Sika) I ACR/EE & SM ( C ) - II/WPZ/03 EE & SM ( C ) - II/WPZ B. G. Shirke Const. Tech. Pvt. Ltd.
02.05.2024 02.05.2024 31.03.2025 AE sign pending RAM/MAHESH

57 Integral Crystaline Admixture Register(Penetron) I ICAR/EE & SM ( C ) - I/WPZ/01 EE & SM ( C ) - I/WPZ B. G. Shirke Const.
01.03.2024
Tech. Pvt. Ltd. 25.05.2024 Not shown MAHESH

58 Admixture Test Register(Specific gravity) I SGA/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const. Tech. Pvt. Ltd.
29.01.2024 29.01.2024 21.04.2025 Contrator and AE sign pending RAM

59 Flow register I 02.05.2024 02.05.2024
23.04.2025
contrator, Ae sign pending SURESH G

60 UPV Test Register I UPV/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
02.02.2024
Tech. Pvt. Ltd. 02.02.2024 06.06.2024 AE/TPQA sign pending VINAYAK/ALI

61 UPV Test Register II UPV/EE & SM ( C ) - II/WPZ/02 EE & SM ( C ) - II/WPZ B. G. Shirke Const. 04.05.2024
Tech. Pvt. Ltd. 06.06.2024 09.09.2024 AE sign pending VINAYAK / ALI

62 UPV Test Register III UPV/EE & SM ( C ) - II/WPZ/03 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
06.08.2024
Tech. Pvt. Ltd. 10.09.2024 19.12.2024 AE sign pending VINAYAK / ALI

63 UPV Test Register IV UPV/EE & SM ( C ) - II/WPZ/03 EE & SM ( C ) - II/WPZ B. G. Shirke Const.
20.12.2024
Tech. Pvt. Ltd. 20.12.2024 09.01.2025 Agency, TPQA sign pending VINAYAK / ALI

64 Bitumen paint register I BPR/EE & SM ( C ) - II/WPZ/01 EE & SM ( C ) - II/WPZ B. G. Shirke Const. Tech. Pvt. Ltd.
06.03.2024 06.03.2024 18.09.2024 Completed MAHESH

Adhesion of coating,Coating thickness,Continuity of
65 I 23.10.2023 01.12.2023 Completed GANESH Not shown
coating Test File

Adhesion of coating,Coating thickness,Continuity of


66 II 21.12.2023 29.3.2024 Completed GANESH Not shown
coating Test File

Adhesion of coating,Coating thickness,Continuity of


67 III 26.04.2024 07.11.2024 Completed GANESH Not shown
coating Test File

68 flyash fineness Test Register file I 01.01.2024 01.01.2024 21.04.2025


Signed by TPQA AND AE
(randomly )
YASHRAJ

69 Cement test Register-Volume I I 08.09.2023 11.09.2023 10.11.2023 Completed GANESH

70 Cement test Register-Volume II II 10.11.2023 10.11.2023 26.12.2023 Completed GANESH

71 Cement test Register-Volume III III 25.12.2023 26.12.2023 30.01.2024 Completed GANESH

72 Cement test Register-Volume IV IV 29.01.2024 31.01.2024 17.03.2024 Completed GANESH

73 Cement test Register-Volume V V 18.03.2024 19.03.2024 31.05.2024 Completed GANESH

74 Cement test Register-Volume VI VI 30.05.2024 31.05.2024 12.08.2024 Completed GANESH

75 Cement test Register-Volume VII VII 13.08.2024 14.08.2024 23.10.2024 AE sign pending GANESH

76 Cement test Register-Volume VIII VIII 18.10.2024 25.10.2024 14.12.2024 BGS and AE pending GANESH

77 Cement test Register-Volume IX IX 14.12.2024 06.02.2025 EE sign pending,AE sign GANESH

78 Cement test Register-Volume X X 07.02.2025 08.04.2025
EE sign pending, Contratotor and
AE sign pendiung
GANESH

79 Cement test Register-Volume XI XI 09.04.2025 17.04.2025
EE sign pending, Contratotor and
AE sign pendiung
GANESH

80 Fine Aggregate test Register-Volume I I 25.10.2023 26.10.2023 30.11.2023 Completed GANESH

81 Fine Aggregate test Register-Volume II II 04.12.2023 30.12.2023 Index page missing,Completed GANESH

82 Fine Aggregate test Register-Volume III III 28.12.2023 01.01.2024 28.02.2024 Completed GANESH

83 Fine Aggregate test Register-Volume IV IV 24.02.2024 28.02.2024 27.04.2024 Completed GANESH

84 Fine Aggregate test Register-Volume V V 26.04.2024 30.04.2024 02.07.2024 Completed GANESH

85 Fine Aggregate test Register-Volume VI VI 02.07.2024 03.07.2024 06.09.2024 Completed GANESH

86 Fine Aggregate test Register-Volume VII VII 03.09.2024 06.09.2024 09.11.2024 Completed GANESH

87 Fine Aggregate test Register-Volume VIII VIII 06.11.2024 09.11.2024 12.02.2025 Completed GANESH

EE sign pending, ate of issue
88 Fine Aggregate test Register-Volume IX IX 13.02.2025 15.04.2025 pending,agency and AE sign
pending
GANESH

89 10mm Aggregate test Register-Volume I I 25.10.2023 26.10.2023 30.11.2023 Completed GANESH

90 10mm Aggregate test Register-Volume II II 01.12.2023 02.12.2023 16.01.2024 Completed GANESH

91 10mm Aggregate test Register-Volume III III 16.01.2024 17.01.2024 01.03.2024 Completed GANESH

92 10mm Aggregate test Register-Volume IV IV 01.03.2024 02.03.2024 22.05.2024 Completed GANESH

93 10mm Aggregate test Register-Volume V V 22.05.2024 04.09.2024 EE sign pending GANESH

94 10mm Aggregate test Register-Volume VI VI 03.09.2024 06.09.2024 07.12.2024 Completed GANESH

95 10mm Aggregate test Register-Volume VII VII 07.12.2024 25.03.2025
AE sign pending,EE issue sign
pending
GANESH

96 10mm Aggregate test Register-Volume VIII VIII 25.03.2025 16.04.2025
AE sign pending -Not signed ,EE
issue sign pending
GANESH

97 20mm Aggregate test Register-Volume I I 25.10.2023 26.10.2023 30.11.2023 Completed GANESH

98 20mm Aggregate test Register-Volume II II 01.12.2023 02.12.2023 16.01.2024 Completed GANESH

99 20mm Aggregate test Register-Volume III III 16.01.2024 17.01.2024 27.02.2024 Completed GANESH

100 20mm Aggregate test Register-Volume IV IV 23.02.2024 27.02.2024 07.05.2024 Completed GANESH

101 20mm Aggregate test Register-Volume V V 08.05.2024 09.05.2024 01.07.2024 Completed GANESH

102 20mm Aggregate test Register-Volume VI VI 02.07.2024 03.07.2024 04.09.2024 Completed GANESH

103 20mm Aggregate test Register-Volume VII VII 03.09.2024 04.09.2024 20.11.2024 Completed GANESH

104 20mm Aggregate test Register-Volume VIII VIII 18.11.2024 21.11.2024 07.02.2025 Completed GANESH

105 20mm Aggregate test Register-Volume IX IX 08.02.2025 17.04.2025 EE sign missing, Ae sign pending

Vol1(13.12.2023 to
19.04.2024)Vol2(20.04.2024 to
29.06.2024)Vol3(01.07.2024 to
30.09.2024)Vol4(01.10.2024 to
30.11.2024)Vol5(02.12.2024 to
RMC batching slip file(Precast factory) 31.12.2024)Vol6(01.01.2025 to 07.01.2023 TPQA,AE sign pending AJAY Not shown

31.01.2025)Vol7(01.02.2025 to
28.02.2025)Vol8(01.03.2025 to
31.03.2025)Vol9(01.04.2025 to
30.04.2025)Vol10(01.05.2025 to till
date)

Non tower podium Volume 1


(27.05.2023 to 30.12.2024) Volume 2
(01.01.2024 to 10.06.2024)Volume 3
(01.01.2024 to 10.06.2024)Volume 4
(18.10.2024 to 30.01.2025)Volume 5
(01.01.2024 to 10.06.2024)

A wing Volume 1 (03.07.2023 to


04.11.2023)Volume 2 (06.11.2023 to
26.12.2023)Volume 3 (06.11.2023 to
26.12.2023)Volume 4 (01.04.2024 to
16.04.2024)Volume 5 (06.11.2023 to
26.12.2023)

B wing Volume 1 (26.05.2023 to


20.09.2023)Volume 2 (21.09.2023 to
20.09.2023)Volume 3 (19.01.2024 to
07.02.2024)Volume 4 (21.09.2023 to
RMC batching slip file(Residential qtrs)
20.09.2023)

106 C wing Volume 1 (11.05.2023 to


31.10.2023)Volume 2 (01.11.2023 to
28.03.2024)

D wing Volume 1 (18.04.2023 to


17.08.2023)Volume 2 (01.11.2023 to
28.03.2025)Volume 3 (29.03.2023 to
28.03.2025)
E wing Volume 1 (25.07.2023 to
31.10.2023)

F wing Volume 1 (14.08.2023 to


31.10.2023)Volume 2 (01.11.2023 to
03.01.2024)Volume 3 (06.01.2024 to
02.02.2024)

PCC office complex


Vol1(M20)(18.04.2024- ),Other RCC
Vol-1(06.07.23-28.09.23),Vol2-
(28.09.23 -
31.10.2023),Vol3(01.11.23 -
11.12.23),Vol4(12.12.23-
11.01.24),Vol5-(12.1.2024-
01.2.24),Vol6-(01.02.24 -13.05.2024),
RMC batching slip file(Office complex) Vol7-(16.05.2024-31.07.2024), Reviewed upto volume-14
Vol8(01.08.2024 -30.09.2024),Vol9-
(01.10.2024 -
30.010.2024),Vol10(04.11.2024-
29.11.2024), VOl11(03.12.2024-
31.12.2024), Vol12 (04.01.2025-
31.01.2025),Vol13(04.02.2025-
28.02.2025),VOl14(01.03.2025-
31.03.2025)
107 Road roller register )
108 Wall Putty Register
109 Ready Mix Plaster Register
110 PU Coating Regsiter
111 Pressure Test register for pipe line
Test of water proofing register
Pressure grouting register