RESIDENTIAL PROPOSAL
10kW PV WITHOUT INVERTER
ONGRID SOLAR POWER SYSTEM
Block C, Floor 110, Business square, Office #1, Gulberg Greens
Islamabad
+92- 311-1122655
www.solariapk.com
Executive Summary
Dear Valued Customer,
This 7kW ONGRID installation and proposal outlines the benefits and cost
savings of implementing a solar power system in your home. It includes a
customized system detail, system price and the warranty periods of the
components. The proposed system will cost PKR 750,000/-
Sincerely,
Ali Ahmed
Sales
Manager
0305-
3577771
Warranty Details
Components Warranty Details
25 Years Performance and 12 Years Product Warranty
Solar Panel
(As per OEM)
Inverter 5 Year Replacement Warranty (As per OEM)
Workmanship 01 Year Service Warranty
Page
System Details
Category Description Quantity Unit Amount
Tier-1, Grade-A, 580/585w,
Solar Panel Bificial, Halfcut (Jinko Ntype) 17 Nos 320,000
Inverter Nos
Copper Rod, With Earthing
Powder With Boring and separate
Earthing AC / DC 1 Job 40,000
Earthing
Special Elevated Structure Grider
12 Guage Mughal Brand and
Structure pipes for support C Channel with 1 Lot 200,000
civil pads
Supplies (Fast DC Cable / AC
Cables,/ Schenider
Breakers,Surge Protection
BoS Device, Boxes, Conduit 1 Lot 110,000
And Accessories)
Installation, Commissioning,
Material Delivery Services, Green
meter installation, Change of
name (CON) , Extension of
Services Load(EOL), Demand 1 Job 60,000
Notice (DN)
Safety Device Lightning Arrestor 1 Job 20,000
After Sales O&M Services (4x
Maintenance Quarterly Visits) 1 Year Free
Total Amount 750,000
Page
Terms and Conditions
Price is valid for 02 days of submission of this proposal.
Price Validity
30% advance payment, 50% payment on panel delivery and 10% on system
Payment Terms commissioning on same day and 10% on netmetering.
All payments to be made in the name of Solaria. Online Transfer or Cheque Accepted
Payment Mode Only.
Deployment Time Within 10 working days of confirmation of order (after advance payment received)
General Terms and It is assumed that the roof shall bear the loading of the solar
Conditions mounting and panels.
Standard bore will be done manually; any machine use will incur
additional charges to be paid by the customer and for buildings taller
than 45 feet, the customer will cover the lightning arrestor
installation cost.
Prices are exclusive of sales tax, service tax, WHT, duties, and any
other applicable taxes or fees.
The customer will be responsible for paying all additional and necessary
charges imposed by Wapda, Nepra, or the government
Solaria will exclusively operate within the Main Electrical Panels,
and the customer is responsible for their interconnection.
Solaria shall not be held accountable for any modifications to concealed
wiring made during load distribution.
All warranties are subject to the company's policy, aligned with the
respective product. Original Equipment Manufacturer (OEM) warranty
policy will be applied.
Upon delivery, the customer must inspect and sign for receipt of the
equipment and installation materials.
There could be minor changes based on site conditions without affecting
energy output.
Any delay in installation due to force majeure events such as strikes,
weather conditions, etc. will not be the responsibility of the
contractor.
Solaria reserves the right to terminate this agreement in the event of
non- compliance with payment terms, fluctuations in the solar market
exchange rates such as $/PKR, or any unforeseen circumstances beyond
the control of either party, with prompt notification provided to the
customer.
The final invoice, panel documents, and warranty card will be issued and
sent to the customer’s email address within 5 working days after full
payment has been received
Client Scope: The turnkey project includes what's outlined here. Any
extra supplies or services will be discussed, and price differences agreed
upon before starting. The proposal covers 10 feet of AC cable from the
inverter to the DB. If more cable is needed, it will be charged based on
actual site measurements. You need a stable 3-phase grid with a
sanctioned load at least two-thirds of the solar system size. We can help
manage this, but the cost is on you. The net metering meter must be in
your name and free from dues. You’ll need a strong Wi-Fi connection near
the inverter for online monitoring and warranty. Keep a fire extinguisher
nearby for safety. Any DISCO approval fees (Rs 1000/ KW) and housing
society permissions are your responsibility
Solaria will provide assistance in the preparation of net metering
documents and their submission to the relevant DISCO. They will also
arrange for the inspection of the system and the submission of
applications to NEPRA. Solaria will follow up on the case process until the
license is received and the bi-directional meter is installed. It should be
noted that the standard net- metering process takes 1 months, unless
there is a delay due to a government department. Additionally,
approval of net metering will be subject to NEPRA and local DISCO laws.
Page
Acknowledgement
I hereby acknowledge that I have carefully read and fully understand the terms
and conditions outlined in this proposal. I agree to all the terms and
conditions set forth herein and confirm my commitment to fulfill all payment
criteria and additional obligations as described. By signing this proposal, I
confirm that I am not relying on any other representations made by the
company.
Name:
CNIC:
Date:
Name: Ali Ahmed
CNIC: 41302-7184899-1
Date:
Account Title: Solaria
Bank: Soneri
IBAN: PK71SONE0507430000907991
Page