0% found this document useful (0 votes)
11 views1 page

First Factory

The document contains a detailed layout of a facility, including various areas such as a packed goods hall, packing area, and toilet block, with specific dimensions provided for each section. It also includes information on amenities like a drinking cooler and a pantry, along with their respective square footage. Overall, the document serves as a comprehensive blueprint for the facility's design and spatial organization.

Uploaded by

prerana11.iitkgp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

First Factory

The document contains a detailed layout of a facility, including various areas such as a packed goods hall, packing area, and toilet block, with specific dimensions provided for each section. It also includes information on amenities like a drinking cooler and a pantry, along with their respective square footage. Overall, the document serves as a comprehensive blueprint for the facility's design and spatial organization.

Uploaded by

prerana11.iitkgp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

4' 1 1

11'-12" 3' 3'-102" 6' 5' 6' 5' 6' 5' 6' 9'-3" 3' 14'-111" 6'
1
12'-52"
2
D1 D1 1
W W W W W 42"
5'-3"
1'-3" DUMP WAITER 1'-6"
10'-9"X9'-0" W W W W
6' W 1
2' 6' 7'-6" 6' 6'-5" 6' 5'-12" 6'

2'-101"
5'-3" 2 41"
2
1'-6"
1
W W 42"
6' W 6' 8'-71" 6' 6'-3"
PACKED GOODS HALL 2 1'-6"
70'-1½"X63'-7½"
W W
1
2'-12" 4'-101" 6' 4'-9" 6'
5'-101"
PACKING AREA 2
2
1'-3" 1
2'-102"

6' W
1
1'-112"
1'-9"
wall tiles area
3' 2'-10" 3'
180 sft
V V
UR
12'-41" W..C.
BASIN UR UR UR W.C.
2 4'-0"X
UR D2 4'-6"X4'-0"
6'-0"
9'-11"
D2 2
D1 UR D2 W..C.
1'-3" V V 4'-6"X4'-0"
UR
9'-4"
OPEN TOILET BLOCK
22'-6"

BASIN
6' W W 6'
10' 11'-9"X14'-0"

area=20800 sft D1
4'

DRINKING
8' 7'-41" area=80 sft
2

cooler
water
area=300 sft

3'-6"
6'-9" 6'-9" 6'-9" 6'-9"

3'-6" 3'-6" 3'-6" 3'-6" VERANDAH


CH. 10'-0" WIDE CORRIDOR
10'-0"X10'-6"
area=160 sft
UP
UP
23'-6"
area=220 sft LIFT
3'-6" 6'-6"X5'-6"

2'-6"
PANTRY 4'

area=280 sft granite 6'-6"X6'-6" area=250 sft


D2 4'
granite
2'-6"
1'-3"

6' W 6' W
1
4'-62"
3'
4'-3" 4'

6' 6' W
W

W W W
D D
5'-6" 7'-1"
1'-3" 20' 6' 7' 4'-6" 6'-6" 6' 14'-111" 6' 5' 4'-6" 7'-8" 4'-6" 7'-2" 6' 15'-6" 6'
3'-9" 2

6' W D 4'-6"
6' W

24'-3" 4'-6" D 3'-6"


6'-6"
area=3225 sft OPEN HALL(SHED)
1'-3" 129'-0"X25'-0"
6' W
6' W
10'-3"
RAILING
4'-9"
3'-9" W W W W W W

1'-6" 2' 2' 1'-6" 1'-6"

You might also like