Hot Work Permit Book
Hot Work Permit Book
NE
NEW MA
1980
1) Hot Work Permit shall be in three copies In instances like plant tumaround or
viz, Original,Duplicate and Triplicate, where an activity where work is of continuous nature
only the Original shall be in pink colour. The involving round-the-clock activity, Blanket Hot
Duplicate and Triplicate shall have the word Work Permit could be given if the owner-
COPY printed in large letters. incharge is fully satisfied that the conditions
are totally safe for the multiple jobs
to be
) No hot work shall be undertaken without a performed. But this should not be resorted
work permit except in the areas pre to especially in highly integrated units.
determined and designated by the owner
incharge. All work permits shall be issued by Even when construction activity has to
the person who is designated as responsible be undertaken in non-operating areas in
person for the operation of the area where intergrated units, it is recommended that
work is to be carried out. In respect of the approval be obtained from designated senior
work permits for handling highly criticial types management for issuing Blanket Hot Work
of work and also for long duration work such Permit.
as in construction jobs in a running
installation, the authorising level should be v) It is recommended that Hot Work Permit
elevated be made in the form of books with tear-off
facility. In the case of Hot Work Permit,the
i) The work may be planned to be done either authorised Original copy shall be given to the
departmentally or through a contractor. In receiver, the Duplicate to the Fire & Safety
either case, the work permit should be Section and Triplicate retained in the book.
received and signed by the maintenance/ In case of Hot work permit, the authorised
project/construetion supervisor of the Originalshall be issued to the receiver
company. as he is responsible for the
work of retaining the Duplicate in the book.
the contractor also. Where. no such
permit, gas test for hydrocarbons/oxygen conditions which are unsafe for performance
deficiency/toxic gases shall be conducted as of the permit work, should be taken into
applicable consideration and the concerned persons
vi) Where gas-free conditions are not fully should be alerted accordingly.
assured for the duration of hot work, a system isolated and
v) Equipment electrically
of monitoring either by automatic or by
taggred:
manual periodic verificaton shall be resorted Before issuing permit for mechanica/electrical
to depending upon the prevalent conditions be
work in the operating area, it should
of the operating area.
ensured that electrical switches are locked out
viil) After completion or stoppage of the job, and cautionary tags dulysigned with date and
the person to whom the permit was issued time are attached. Wherever local locking
should thoroughly check the area for clearing the same
arrangement is provided in the field,
of debris, removal of temporary electrical
should be used. Refer format for electrical
installations etc., and then shall sign the work in OISD-Std-137 on
lockoutenergisinggiven
permit and return it to the issuer. Inspection of Electrical equipment
EXPLANATORY NOTES TO HOT vi) Running water hose/Portable extinguisher
WORK PERMIT FORMS provided:
i) Equipment/Area Inspected: fire
Running water hose and portable
Equipment of area where hot work is to be extinguisher are required respectively to flush/
conducted, should be inspected to ensure that dilute in case of release of any hazardous
it is safe to carryout work and assess other
chemical or to quench sparks and to put out
safety requirements/stipulated are complied.
small fires immediately.
In case of vessel box-up permit, the inspection
is required to ensure work is complete, all vii) Fire water system checked for readiness:
personnel are out, no maintenance gear is left In order to meet any contingency, it should be
behind and debris is removed. ensured that the fire water pumps, storage,
i) Surrounding area checked/cleaned: network, etc., is checked and kept ready for
traces of acids/
Blinding is one of the most effective ways of It is also employed to remove
compressors, etc.,) is done to free them of man will be below ground level and when hot
flammable hydrocarbons and toxie gases. work is being carried out. The person carrying
Steam is used for gas-freeing of vessels and out gas test must wear proper protective gear.
pipes in refineries and processing units, but
No hot work shall be permitted unless the
in refineries and processing units, but
pipes explosivity meter reading is zero. Vesel entry
It may not be available at other locations.
where no hot work is to be carried out may be
Other means of purging is by displacement
with water and final traces of gas removed by permitted if combustible gases are upto 5%
air eductor. Allhigh point vents should be of lower explosivity limit (LEL). Entry with
an air supplied mask may be permitted with
unplugged while purging. Purging may be done
LEL of up to 50%
continuously or in batches to conserve purge
medium. It should be done equipment/plant The oxygen level should be at least 19.5 Vol.%
and continued till the allowable level of toxic/ and the concentration of toxic gases below
to be allowed for work inside vessels, from of the work permit issuer shall decide the
job,
which
consideration of personal safety. typeof standby to be provided i.e from
and also
department, of what level, how many
xv) Proper m e a n s of exit provided: Proper
additional fire fighting support facilities
means of exit is required in case of
wet:
emergencies developed on account of the work xx) Iron Sulphide removed/kept
or otherwise. Availability of an alternate route Pyrophoric substances may be present in
of escape should be considered.
operating area equipment handling
hydrocarbon. Iron sulphide scales is the
xvi) Precautionary tags/boards provided: To most common pyrophoric substance
work
prevent any unwarranted entry in the encountered. These should be either
area and also to caution other personnel
removed to safe locations or kept wet all the
taking actions which may endanger people
time to prevent their auto-ignition.
working on the permit job, precautionary tags/
boards are to be provided. Example, 'Noxxi) Area cordoned off
At Work In order to prevent the unauthorised entry
roads or 'Caution-Men
Entry' sign on
of people and to avoid acidents during
Inside' on the manhole of a vessel.
excavation jobs, work area is to be cordoned
equipment/Hose nozzles
xvii) Portable
off.
property grounded:
traffic taken:
static electricity Xxii) Precaution against public
As precaution against
a
On case hot work is to be carried out in the
generation, portable equipment/hose/nozzles,
close proximety of a public road, for example
blasting gun, are to
example: nozzle of a sand in the case of a trunk pipeline, it may be
lines for
be grounded. Use of hydrocarbon desirable to block-off/divert public traffic for
earthing should be avoided.
the duration of the job as a precautionary
measure.
xxii) Clearance obtained for excavation from evening and night shifts, invariably the gap
Technical concerned departments: For any should be closed with steel plate and mud
excavation work which may affect packing at the end of days work.
underground sewers/telephone lines/cables/ xxvi) Checked flame arrester on mobile
pipelines ete., Technical Services Dept., and/ equipment:
or other concerned departments, should be Although only certified vehicles engines are
consulted for obtaining the co-ordinates and permitted in operating areas, it should be
the depth to which excavation can be resorted ensured that the flame arrester is not
to,without damaging the existing facilities. inadvertently removed.
Markers should be put around the area where
xxvii) Checked for oil/gas trapped behind
excavation can be done and the depth can be
lining in equipment:
done and the depth can be indicated in the
Before undertaking hot jobs, a check should
work permit.
be done for oil gas trapped behind lining in
xxiv) Clearance obtained for road cutting from the equipment. Many times oil gas trapped
Technical/Fire/concerned departments Since behind lining depicts itself in the form of
road cutting can hamper the movement of the welling and can be confirmed by way of
fire trucks, initial clearance should be drilling holes.
obtained from fire Department, and final
approval from the higher designated
authorities. If the road is wide, preferably the
road should be cut half at a time.Duration
of cut road should be restrieted as far as
possible.
VALID FROM TO
PERMISSION GRANTED TO SECTIONICONTRACTOR: NAME:
NATURE OF WORK
LOCATION OF WORK
Note: For items marked () clearance to be obtained from higher designated authority.
SPECIAL INSTRUCTIONS
1. Following personal protective equipment are required (check allitems required):
Safety hat/Gloves/Goggles/Safety Shoes Boiler Suit Welding Suit
Dust Respirator/Face Shielf/Fresh Air Mask/Apron/Lifeline/Safety Belt
In case of fire alarm, all work must be stopped. all personnel must leave work site and proceed to Designated areas
In case ofliquidlgas release, stop work and immediately advise concerned Operation personnel
4 Only certified vehicle, engines and permitted type of electrical equipment and tools are allowed in operating areas.
Ensure proper grounding/earthing/insulation of cables
6
This permit must be available at the work site at all times
Additional remarks, if any:
VALID FROM TO
PERMISSION GRANTED TO SECTIONICONTRACTOR: NAME
NATURE OF WORK
.OCATION OF WORK
Note: Foritems marked (") dlearance to be obtained from higher designated authority.
SPECIAL INSTRUCTIONS
Following personal protective equipment are required (check all items required):
Safety hat/Gloves/Goggles/Safety Shoes Boiler SuitWelding Suit
Dust Respirator/Face Shielf/Fresh Air Mask/Apron/Lifeline/Safety Belt
2 Incase of fre alarm, all work must be stopped. all personnel must leave work site and proceed to Designated areas.
In case of liquid/gas release, stop work and immediately advise concerned Operation personnel
Only certfied vehidle, engines and permitted type of electrical equijpment and tools are allowed inoperating areas.
Ensure proper grounding/earthing/insulation of cables.
This permit must be available at the work site at all times
Additional remarks, if any
TRUST
NEW MANGALORE PORT
PANAMBUR
N o 2401
BOX-UP /EXCAVATION
HOT WORK/VESSEL ENTRY/VESSEL
(Strike out boxes not applicable)
SI No
TO
VALID FROM
NAME:
PERMISSION GRANTED TO SECTION/CONTRACTOR:
NATURE OF WORK
LOCATION OF WORK
ISSUING THE PERMIT
THE FOLLOWING ITMES SHALL BE CHECKED BEFORE
Not
Not Done
Item Done
Regd.
Item Reqd
Provided
area inspected 15. Proper means of exit
1 Equipment/work
Provided
are checked/cleaned
16. Precautionary tags/boards
2 Surrounding
up/oil/rags/grass etc. removed
17. Portable equipment/nozzles
grounded
3. Sewers, manholes, CBD etc, and
hot surface nearby covered 18. Standby personnel provided
for vessel entry
Considered hazard from other routine
operations and concerned persons alerted. 19 Standby personnel provided for fire
watch from Main/Contractor Ifire Dept
5. Equipment electrically Isolated and tagged
Sulphide removed/kept wet
20 Iron
6 Fire water hose/portable extinguisher
21. Area Cordoned off
Provided
checked for readiness 22. Precautions against public
Fire water System Traffic taken.
8 Equipment blinded disconnected/ 23. Clearance obtained for excavation
Closed./isolated/wedged open from Technical/Corcerned Depts.
Note: For items marked (") clearance to be obtained from higher designated authority.
SPECIAL INSTRUCTIONS
1. Following personal protective equipment are required (check all items required):
Safety hat/Gloves/Goggles/Safety Shoes Boiler Suit Welding Suit
Dust Respirator/Face Shielf/Fresh Air Mask/Apron/Lifeline/Safety Belt
In case of fire alarm, all work must be stopped. all personnel must leave work site and proceed to Designated areas.
In case ofliguid/gas release, stop work and immediately advise concerned Operation personnel.
4 Onlycertified vehicle, engines and permitted type of electrical equipment and tools are allowed in operating areas
Ensure proper grounding/earthing/insulation of cables.
This permit must be available at the work site at all times
Additional remarks, if any
No 2401
GAS TEST (HYDROCARBON/TOXIC AD ITIONAL SIGNATURE
PERMIT
GASIOXYGEN EXTENDED
DEFICIENCY) DONE
PRECAUTIONS
UPTOS REQUIRED IF ANY
NOTE HOT WORK INCLUDES WELDING, BURNING GRINDING sOLDERING, SAND BLASTING, CHIPPING
RIVITTING, DRILLING, CAMERA FLASHING, POWER TOOLS, IC ENGINE OPERATIONS ENTY, OPEN FLAME
AM
WORK COMPLETED/STOPPEDIAREA CLEARED AT
PM DATE
By
(Signature)
No 2401 SIGNATURE
GAS TEST (HYDROCARBONTOXIC PERMIT ADDITIONAL
GAS/OXYGEN EXTENDED PRECAUTIONS
DEFICIENCY) DONE UPTOS REQUIRED IF ANY
AM
WORK COMPLETED/STOPPEDIAREA CLEARED AT
PM DATE
By
(Signature)
on Sulplide removs
Prov raa Cordersd of
Fire walr8 sm ce
arce obianeo fo
NOTE: HOT WORK INCLUDES WELDING, BURNING GRINDING, SOLDERING, SAND BLASTING, CHIPPING
RIVITTING,DRILLING, CAMERA FLASHING, POWER T0OLS, IC ENGINE OPERATIONS ENTY, OPEN FLAME
Checked o R gas irep
in AM kp
WORK COMPLETED/STOPPED/AREA CLEARED AT
PM DATE
t e i e d tom het seser
Foa gb
Dust espratoeao ebra