The document outlines the procedure for implementing a Hot Work Permit System at New Mangalore Port Trust, detailing the steps required for safe hot work operations. It emphasizes the necessity of obtaining permits, conducting safety checks, and ensuring proper precautions are taken to mitigate risks associated with hot work activities. Additionally, it includes guidelines for monitoring conditions, emergency preparedness, and coordination with relevant departments.

Uploaded by

chandrusachin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views12 pages

Hot Work Permit Book

The document outlines the procedure for implementing a Hot Work Permit System at New Mangalore Port Trust, detailing the steps required for safe hot work operations. It emphasizes the necessity of obtaining permits, conducting safety checks, and ensuring proper precautions are taken to mitigate risks associated with hot work activities. Additionally, it includes guidelines for monitoring conditions, emergency preparedness, and coordination with relevant departments.

Uploaded by

chandrusachin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

0025

NE
NEW MA

1980

NEW MANGALORE PORT TRUST

HOT WORK PERMIT


PROCEDURE FOR HOT WORK PERMIT SYSTEM
following is the procedure for the implementation of Work Permit System

1) Hot Work Permit shall be in three copies In instances like plant tumaround or

viz, Original,Duplicate and Triplicate, where an activity where work is of continuous nature
only the Original shall be in pink colour. The involving round-the-clock activity, Blanket Hot
Duplicate and Triplicate shall have the word Work Permit could be given if the owner-
COPY printed in large letters. incharge is fully satisfied that the conditions
are totally safe for the multiple jobs
to be
) No hot work shall be undertaken without a performed. But this should not be resorted
work permit except in the areas pre to especially in highly integrated units.
determined and designated by the owner
incharge. All work permits shall be issued by Even when construction activity has to
the person who is designated as responsible be undertaken in non-operating areas in
person for the operation of the area where intergrated units, it is recommended that
work is to be carried out. In respect of the approval be obtained from designated senior
work permits for handling highly criticial types management for issuing Blanket Hot Work
of work and also for long duration work such Permit.
as in construction jobs in a running
installation, the authorising level should be v) It is recommended that Hot Work Permit
elevated be made in the form of books with tear-off
facility. In the case of Hot Work Permit,the
i) The work may be planned to be done either authorised Original copy shall be given to the

departmentally or through a contractor. In receiver, the Duplicate to the Fire & Safety
either case, the work permit should be Section and Triplicate retained in the book.
received and signed by the maintenance/ In case of Hot work permit, the authorised
project/construetion supervisor of the Originalshall be issued to the receiver
company. as he is responsible for the
work of retaining the Duplicate in the book.
the contractor also. Where. no such

independent supervisor exists, for example in It is recommended that plot plans of


small installations, the owner-incharge can the installation and the operating blocks
issuethepermittothecontractor'ssupervisor should be displayed in the Fire and conerned
directly andobtain hissignature. Unit Control Rooms respectively, and site of
hot jobs under progress sholud be indicated
iv)Permit should be issued only for a single on these piot plans with red pins. This helps
shift and its validity should expire at the the incoming supervisor/s (both in Fire and
termination of the shift. However, where the Operating departments) to get a quick idea of
work has to be continued, the same permit the hot jobs being undertaken and help in

may be revalidated in the succeeding shift, by


identifying the areas which require
authorised person after satisfying the normal inspection/attention depending upon the
checks. criticality of the area and job.
(ii)

vi) As a prerequisite to permit issue, Othe activities (routine/non routine) being


particularly in the case of hot worlkvessel entry carried out near by, which can create

permit, gas test for hydrocarbons/oxygen conditions which are unsafe for performance
deficiency/toxic gases shall be conducted as of the permit work, should be taken into
applicable consideration and the concerned persons
vi) Where gas-free conditions are not fully should be alerted accordingly.
assured for the duration of hot work, a system isolated and
v) Equipment electrically
of monitoring either by automatic or by
taggred:
manual periodic verificaton shall be resorted Before issuing permit for mechanica/electrical
to depending upon the prevalent conditions be
work in the operating area, it should
of the operating area.
ensured that electrical switches are locked out
viil) After completion or stoppage of the job, and cautionary tags dulysigned with date and
the person to whom the permit was issued time are attached. Wherever local locking
should thoroughly check the area for clearing the same
arrangement is provided in the field,
of debris, removal of temporary electrical
should be used. Refer format for electrical
installations etc., and then shall sign the work in OISD-Std-137 on
lockoutenergisinggiven
permit and return it to the issuer. Inspection of Electrical equipment
EXPLANATORY NOTES TO HOT vi) Running water hose/Portable extinguisher
WORK PERMIT FORMS provided:
i) Equipment/Area Inspected: fire
Running water hose and portable
Equipment of area where hot work is to be extinguisher are required respectively to flush/
conducted, should be inspected to ensure that dilute in case of release of any hazardous
it is safe to carryout work and assess other
chemical or to quench sparks and to put out
safety requirements/stipulated are complied.
small fires immediately.
In case of vessel box-up permit, the inspection
is required to ensure work is complete, all vii) Fire water system checked for readiness:

personnel are out, no maintenance gear is left In order to meet any contingency, it should be
behind and debris is removed. ensured that the fire water pumps, storage,
i) Surrounding area checked/cleaned: network, etc., is checked and kept ready for

Unsafe conditions for performance of work immediate use.

may arise from surrounding area.


It should vii) Equipment blinded/disconnected/closed
be cleaned up to remove flammable material wedged open EquipmentWessel onwhich the
such as oil, rags, grass. work permit is being issued should be
iii) Sewers, Manholes, CBD etc. and Hot completely isolated from the rest of the plant
Surfaces covered; with which it is connected during normal
Flammable gases may be released from nearby
operation, in order to ensure that there is no
sewers. Hot unisulated surfaces/pipelines may change in the work environment with respect
provide a sourceof ignition. Therefore, these to presence oftoxiclammable gases, liquids,
are to be properly covered to prevent
fires.
hazardous chemicals etc., in the course of the
iv) Considered hazard from other routine/non work.
routine operations and persons alerted:
ii)

traces of acids/
Blinding is one of the most effective ways of It is also employed to remove

isolation. Blinds should be installed as close chemicals. Equipment metallurgy must be


water
to the vessel as possible. If lines cannot be considered before using sea/saline
blinded, they should be installed as close to Sometimes flushing with demineralised water
the vessel as possible. If lines cannot be the
would be necessary depending upon
blinded, they should be disconnected and the metallurgy of the equipment.
open ends should be made safe byinstalnngi) Gas/0xygen deficiency test done and found
pipe caps/plugs, blind flanges, mud packing
OK Gas test includes measurement of:
etc.
Hydrocarbons by Explosivity Meter
(a)
ix) Equipment properly drained/ (b) Oxygen Deficiency by Oxygen Meter.
depressurized after isolation. This will be C)
Toxic gases like Hydrogen Sulphide,
followed by draining/purging/water flushing Carbon Monoxide, Nickel Carbonyl,
etc., as the case may be. techniques like
Chlorine etc., by
Equipment containing liquid hydrocarbons Indicator Tube method, Lead
should be drained completely. There may be
Acetate Paper etc.,
apossiblity of overlooking liquid collected in
Measurement of lead in air is required for
pockets or inaccessible areas such as level
gauges, small nozzles/bleeders on vessels, entering leaded tanks. Octe/Ethyl regulations
laterals in pipe work etc., All low point drains are to be followed while handling leaded

should be in unplugged condition. gasoline.


x) Equipment properly steamed/purged:| Gas tests may be specified for vessel entry

Purging of equipment (vessels, pipelines, including open excavation where head of a

compressors, etc.,) is done to free them of man will be below ground level and when hot
flammable hydrocarbons and toxie gases. work is being carried out. The person carrying
Steam is used for gas-freeing of vessels and out gas test must wear proper protective gear.
pipes in refineries and processing units, but
No hot work shall be permitted unless the
in refineries and processing units, but
pipes explosivity meter reading is zero. Vesel entry
It may not be available at other locations.
where no hot work is to be carried out may be
Other means of purging is by displacement
with water and final traces of gas removed by permitted if combustible gases are upto 5%

air eductor. Allhigh point vents should be of lower explosivity limit (LEL). Entry with
an air supplied mask may be permitted with
unplugged while purging. Purging may be done
LEL of up to 50%
continuously or in batches to conserve purge

medium. It should be done equipment/plant The oxygen level should be at least 19.5 Vol.%
and continued till the allowable level of toxic/ and the concentration of toxic gases below

flammable gas concentration is attained. the threshold limits


xi) Equipment water flushed
Water flushing is an effective means of Cooling,
cleaning and even gas-freeing of equipment.
(iv)

xviii) Standby person provided for vessel


xii) Shield against sparks provided: In
order
vessel is being entered or
entry: Whenever a
to protect against welding sparks, which can
work is being carried out in confined space,
provide ignition in operating areas, shields
are

it be necesary to keep standby persons


The shield material should may
to be provided. entry point
(minimum 2) at the manhole
or
be non-flammable. In case tarpaulins are
the safety belt
should be wet with water. holding the rope connected to
used, they kept
of the person inside.
xiv) Proper ventilation and lighting provided: outside
In case of any emergency inside or
Where natural ventilation is not available, fans/
air eductors are provided. Some types of the vessel, the standby will be able to assist
the person out.
works like welding, may generate fumes,
for fire
Facilities may be required for the speedy xix) Standby personnel provided
watch from Process/Maintenance/Contractor/
dispersal of these fumes. Only approved
reduced voltage extension lights (24 volts) are Fire Department: Depending on critically

to be allowed for work inside vessels, from of the work permit issuer shall decide the
job,
which
consideration of personal safety. typeof standby to be provided i.e from
and also
department, of what level, how many
xv) Proper m e a n s of exit provided: Proper
additional fire fighting support facilities
means of exit is required in case of
wet:
emergencies developed on account of the work xx) Iron Sulphide removed/kept
or otherwise. Availability of an alternate route Pyrophoric substances may be present in
of escape should be considered.
operating area equipment handling
hydrocarbon. Iron sulphide scales is the
xvi) Precautionary tags/boards provided: To most common pyrophoric substance
work
prevent any unwarranted entry in the encountered. These should be either
area and also to caution other personnel
removed to safe locations or kept wet all the
taking actions which may endanger people
time to prevent their auto-ignition.
working on the permit job, precautionary tags/
boards are to be provided. Example, 'Noxxi) Area cordoned off
At Work In order to prevent the unauthorised entry
roads or 'Caution-Men
Entry' sign on
of people and to avoid acidents during
Inside' on the manhole of a vessel.
excavation jobs, work area is to be cordoned
equipment/Hose nozzles
xvii) Portable
off.
property grounded:
traffic taken:
static electricity Xxii) Precaution against public
As precaution against
a
On case hot work is to be carried out in the
generation, portable equipment/hose/nozzles,
close proximety of a public road, for example
blasting gun, are to
example: nozzle of a sand in the case of a trunk pipeline, it may be
lines for
be grounded. Use of hydrocarbon desirable to block-off/divert public traffic for
earthing should be avoided.
the duration of the job as a precautionary

measure.
xxii) Clearance obtained for excavation from evening and night shifts, invariably the gap
Technical concerned departments: For any should be closed with steel plate and mud
excavation work which may affect packing at the end of days work.
underground sewers/telephone lines/cables/ xxvi) Checked flame arrester on mobile
pipelines ete., Technical Services Dept., and/ equipment:
or other concerned departments, should be Although only certified vehicles engines are
consulted for obtaining the co-ordinates and permitted in operating areas, it should be
the depth to which excavation can be resorted ensured that the flame arrester is not
to,without damaging the existing facilities. inadvertently removed.
Markers should be put around the area where
xxvii) Checked for oil/gas trapped behind
excavation can be done and the depth can be
lining in equipment:
done and the depth can be indicated in the
Before undertaking hot jobs, a check should
work permit.
be done for oil gas trapped behind lining in
xxiv) Clearance obtained for road cutting from the equipment. Many times oil gas trapped
Technical/Fire/concerned departments Since behind lining depicts itself in the form of
road cutting can hamper the movement of the welling and can be confirmed by way of
fire trucks, initial clearance should be drilling holes.
obtained from fire Department, and final
approval from the higher designated
authorities. If the road is wide, preferably the
road should be cut half at a time.Duration
of cut road should be restrieted as far as
possible.

xxv) Clearance obtained for the dike cutting:


when the dike is cut, any mishap in the tank
farm can lead to a fre flow of oil to outside
the bund. A high level authority should be
designated for authorizing dike cutting.
Further it should be ensured that dike would
be reconstructed in the shortest possible time.
For example, if pipes have to be laid through
the dikes, the pipes should be laid quickly
and plugged/capped so that the dike can be
closed. Thereafter balance or pipe fabrification
can continue without any risk. Standby
personnel should be available at the work site,
who should posses a suitable size steel plate
for blocking the opening in case of a mishap/
tank failure. If no work is undertaken in
ORIGINAL 1/2

NEW MANGALORE PORT TRUSTT


PANAMBUR No2101
HOT WORK/VESSEL ENTRY/VESSEL BOX-UP /EXCAVATION

(Strike out boxes not applicable) SI. No.

VALID FROM TO
PERMISSION GRANTED TO SECTIONICONTRACTOR: NAME:

NATURE OF WORK
LOCATION OF WORK

THE FOLLoWING ITMES SHALL BE CHECKED BEFORE ISSUING THE PERMIT


Not Not
Item Done ltem Done
Reqd. Reqd.
1. Equipmentwork area inspected 15. Proper means of exit Provided

Surrounding are checked/cleaned 16. Precautionary tags/boards Provided


up/oil/rags/grass etc. removed
17. Portable equipment/nozzles
3. Sewers, manholes, CBD etc, and groundedd
hot surface nearby covered
18. Standby personnel provided
4. Considered hazard from other routine for vessel entry
operations and concerned persons alerted.
19. Standby personnel provided for fire
5 Equipment electrically Isolated and tagged watch from Main/Contractor /fire Dept.
20. Iron Sulphide removed/kept wet
6. Fire water hose/portable extinguisher
Provided 21 Area Cordoned of
7. Fire water System checked for readiness 22. Precautions against public
Traffic taken.
8. Equipment blinded disconnected
23. Clearance obtained for excavation
Closed./isolated/wedged open from Technical/Concerned Depts.
9 Equipment properly drained 24. Clearance obtained for road
depressurised. cutting from Technical/Firel
10. Equipment properly steamed/ purged Concerned Depts.
25. Clearance obtained for dike
11. Equipment waterflushed
Cutting
12. Gas/Oxygen deficiency test done and
26. Checked Flame arrester on
found ON. mobile equipment
13. Shielf against sparks provided
27. Checked for oil gas trapped behind
14. Proper ventilation and lighting provided lining on equipment

Note: For items marked () clearance to be obtained from higher designated authority.
SPECIAL INSTRUCTIONS
1. Following personal protective equipment are required (check allitems required):
Safety hat/Gloves/Goggles/Safety Shoes Boiler Suit Welding Suit
Dust Respirator/Face Shielf/Fresh Air Mask/Apron/Lifeline/Safety Belt
In case of fire alarm, all work must be stopped. all personnel must leave work site and proceed to Designated areas
In case ofliquidlgas release, stop work and immediately advise concerned Operation personnel
4 Only certified vehicle, engines and permitted type of electrical equipment and tools are allowed in operating areas.
Ensure proper grounding/earthing/insulation of cables
6
This permit must be available at the work site at all times
Additional remarks, if any:

Name and Name and


Signature of Receiver Signature of Issuer
cOPY 1/2
NEW MANGALORE PORT TRUST
PANAMBUR No:2401
HOT WORK/VESSEL ENTRY/VESSEL BOX-UP/EXCAVATION
(Strike out boxes not applicable) SI. No.

VALID FROM TO
PERMISSION GRANTED TO SECTIONICONTRACTOR: NAME
NATURE OF WORK
.OCATION OF WORK

THE FOLLoWINGITMES SHALL BE CHECKED BEFORE ISSUINGTHEPERMIT


Not Not
Item Done tem Done
Reqd. Reqd
Equipment/work area inspected 1 5 . Proper means of exit Provided
Surrounding are checked/cleaned
up/oilrags/grass etc. removed
16 Precautionary tags/boards Provided
17. Portable equipment/nozzles
3 Sewers, manholes, CBD etc, and grounded
hot surface nearby covered
18. Standby personnel provided
4. Considered hazard from other routine for vessel entry
operations and concerned persons alerted. 19. Standby personnel provided for fire
watch from Main/Contractor Ifire Dept.
5 Equipment electricall Isolated and tagged
6 Fire water hose/portable extinguisher 20 Iron Sulphide removed/kept wet
Provided 21 Area Cordoned off

7. Fire water System checked for readiness 22 Precautions against public


Traffic taken.
8 Equipment blinded disconnected/ 23. Clearance obtained for excavation
Closed./isolated/wedged open from Technical/Concerned Depts.
9 Equipment properly drained 24. Clearance obtained for road
depressurised. cutting from Technical/Firel
10. Equipment properly steamed/ purged Concerned Depts.
25. Clearance obtained for dike
11. Equipment water flushed
Cutting
12. Gas/Oxygen deficiency test done and 26. Checked Flame arrester on
found ON. mobile equipment
13. Shielf against sparks provided
14. Proper ventilation and lighting orovided
27 27 Checked for oil gas trapped behind
lining on equipment

Note: Foritems marked (") dlearance to be obtained from higher designated authority.
SPECIAL INSTRUCTIONS
Following personal protective equipment are required (check all items required):
Safety hat/Gloves/Goggles/Safety Shoes Boiler SuitWelding Suit
Dust Respirator/Face Shielf/Fresh Air Mask/Apron/Lifeline/Safety Belt
2 Incase of fre alarm, all work must be stopped. all personnel must leave work site and proceed to Designated areas.
In case of liquid/gas release, stop work and immediately advise concerned Operation personnel
Only certfied vehidle, engines and permitted type of electrical equijpment and tools are allowed inoperating areas.
Ensure proper grounding/earthing/insulation of cables.
This permit must be available at the work site at all times
Additional remarks, if any

Name and Name and


Signature of Receiver Signature of Issuer
COPY

TRUST
NEW MANGALORE PORT
PANAMBUR
N o 2401

BOX-UP /EXCAVATION
HOT WORK/VESSEL ENTRY/VESSEL
(Strike out boxes not applicable)
SI No
TO
VALID FROM
NAME:
PERMISSION GRANTED TO SECTION/CONTRACTOR:

NATURE OF WORK
LOCATION OF WORK
ISSUING THE PERMIT
THE FOLLOWING ITMES SHALL BE CHECKED BEFORE
Not
Not Done
Item Done
Regd.
Item Reqd
Provided
area inspected 15. Proper means of exit
1 Equipment/work
Provided
are checked/cleaned
16. Precautionary tags/boards
2 Surrounding
up/oil/rags/grass etc. removed
17. Portable equipment/nozzles
grounded
3. Sewers, manholes, CBD etc, and
hot surface nearby covered 18. Standby personnel provided
for vessel entry
Considered hazard from other routine
operations and concerned persons alerted. 19 Standby personnel provided for fire
watch from Main/Contractor Ifire Dept
5. Equipment electrically Isolated and tagged
Sulphide removed/kept wet
20 Iron
6 Fire water hose/portable extinguisher
21. Area Cordoned off
Provided
checked for readiness 22. Precautions against public
Fire water System Traffic taken.
8 Equipment blinded disconnected/ 23. Clearance obtained for excavation
Closed./isolated/wedged open from Technical/Corcerned Depts.

9 Equipment properly drained 24 Clearance obtained for road


depressurised. cutting from Technical/Firel
10. Equipment properly steamed/ purged
Concerned Depts.
25. Clearance obtained for dike
11. Equipment water flushed
Cutting
12. Gas/Oxygen deficiency test done and 26. Checked Flame arrester on g
R found ON 4 CAAHAFUAS emobile equipmentATONS EN
13. Shielf against sparks provided 27. Checked for oil gas trapped behind
lining on equipment
4 Proper ventilation and lighting provided

Note: For items marked (") clearance to be obtained from higher designated authority.
SPECIAL INSTRUCTIONS
1. Following personal protective equipment are required (check all items required):
Safety hat/Gloves/Goggles/Safety Shoes Boiler Suit Welding Suit
Dust Respirator/Face Shielf/Fresh Air Mask/Apron/Lifeline/Safety Belt
In case of fire alarm, all work must be stopped. all personnel must leave work site and proceed to Designated areas.
In case ofliguid/gas release, stop work and immediately advise concerned Operation personnel.
4 Onlycertified vehicle, engines and permitted type of electrical equipment and tools are allowed in operating areas
Ensure proper grounding/earthing/insulation of cables.
This permit must be available at the work site at all times
Additional remarks, if any

Name and ETURN PERMIE TO66R Nameand


Signature of Receiver Signature of Issuer
COPY 2/2

No 2401
GAS TEST (HYDROCARBON/TOXIC AD ITIONAL SIGNATURE
PERMIT
GASIOXYGEN EXTENDED
DEFICIENCY) DONE
PRECAUTIONS
UPTOS REQUIRED IF ANY

DATE TIME TAKEN BY REMARKSS DATE TIME ISSUER RECEIVER

NOTE HOT WORK INCLUDES WELDING, BURNING GRINDING sOLDERING, SAND BLASTING, CHIPPING
RIVITTING, DRILLING, CAMERA FLASHING, POWER TOOLS, IC ENGINE OPERATIONS ENTY, OPEN FLAME

AM
WORK COMPLETED/STOPPEDIAREA CLEARED AT
PM DATE

By
(Signature)

(PLEASE RETURN PERMIT TO ISSUER) NAME


COPY 2/2

No 2401 SIGNATURE
GAS TEST (HYDROCARBONTOXIC PERMIT ADDITIONAL
GAS/OXYGEN EXTENDED PRECAUTIONS
DEFICIENCY) DONE UPTOS REQUIRED IF ANY

DATE TIME TAKEN BY REMARKS DATE TIME ISSUER RECEIVER

SOLDERING, SAND BLASTING, CHIPPINGG


NOTE: HOT WORK INCLUDES WELDING, BURNING GRINDING,IC ENGINE OPERATIONS ENTY, OPEN FLAME
RIVITTING, DRILLING, CAMERA FLASHING, POWER TOOLS,

AM
WORK COMPLETED/STOPPEDIAREA CLEARED AT
PM DATE

By
(Signature)

(PLEASE RETURN PERMIT TO ISSUER) NAME


2/2
COPY
7R0ST
NEW MANGALORE PO No 2401 SIGNATURE
PANANUR
ADDITIONAL
GAS TEST (HYDROCARBON/TOXIC PERMIT
GAS/OXYGEN EXTENDED PRECAUTIONS
DEFICIENCY) DONE UPTOS REQUIRED IF ANY

TIME TAKEN BY REMARKS DATE TIME ISSUER RECEIVER


DATE

adiered atsco ffor oter so/

on Sulplide removs
Prov raa Cordersd of

Fire walr8 sm ce
arce obianeo fo

eproat 37om echncai

NOTE: HOT WORK INCLUDES WELDING, BURNING GRINDING, SOLDERING, SAND BLASTING, CHIPPING
RIVITTING,DRILLING, CAMERA FLASHING, POWER T0OLS, IC ENGINE OPERATIONS ENTY, OPEN FLAME
Checked o R gas irep
in AM kp
WORK COMPLETED/STOPPED/AREA CLEARED AT
PM DATE
t e i e d tom het seser

Foa gb
Dust espratoeao ebra

oied epih po opoirsicricelenuipht matrolt (Signature)

(PLEASE RETURN PERMIT TO ISSUER) NAME


Sratere of ss4or

You might also like