0% found this document useful (0 votes)
13 views13 pages

Sdo Alaminos School Year 2024-2025 Training Plan Computer Systems Servicing (40 Days)

The document outlines a comprehensive training plan for the Joint Delivery Voucher Program focused on Computer Systems Servicing for Senior High School students in the 2024-2025 school year. It details a 40-day face-to-face training schedule that includes various learning competencies, practical demonstrations, and assessments related to computer hardware assembly, operating system installation, network configuration, and maintenance. Each day is structured with specific learning outcomes, activities, and expected outputs to ensure adherence to safety and operational standards.

Uploaded by

dnqb5trbwg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views13 pages

Sdo Alaminos School Year 2024-2025 Training Plan Computer Systems Servicing (40 Days)

The document outlines a comprehensive training plan for the Joint Delivery Voucher Program focused on Computer Systems Servicing for Senior High School students in the 2024-2025 school year. It details a 40-day face-to-face training schedule that includes various learning competencies, practical demonstrations, and assessments related to computer hardware assembly, operating system installation, network configuration, and maintenance. Each day is structured with specific learning outcomes, activities, and expected outputs to ensure adherence to safety and operational standards.

Uploaded by

dnqb5trbwg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

WESTERN HORIZON SKILLS TRAINING AND ASSESSMENT CENTER INC.

Brgy. Bued, City of Alaminos, Pangasinan 2404


Contact No.: 0905 495 2599 / (075)656-4944
Email Address: westernhorizon2022@gmail.com

Region I
SDO ALAMINOS
School Year 2024-2025
TRAINING PLAN
JOINT DELIVERY VOUCHER PROGRAM FOR SENIOR HIGH SCHOOL TECHNICAL VOCATIONAL LIVELIHOOD
COMPUTER SYSTEMS SERVICING (40 Days)
Face-to-Face (Lecture, Skills Demo and Skills Return Demo)
Date Time Learning Competency Code Activity Output

1.1 Plan unit assembly to ensure OHS policies


and
procedures are followed in accordance with
systems requirements
1.2 Prepare unit assembly to ensure OHS
policies
LO 1. Assemble computer TLE_IACSS9- and procedures are followed in accordance
DAY 1 8:00 AM TO 5:00 PM DEMONSTRATION
hardware 12ICCS-Ia-e-28 with
systems requirements
1.3 Identify materials necessary to complete
the
work in accordance with established
procedures
and check against system requirements
1.4 Obtain materials necessary to complete the
work
in accordance with established procedures and
check against system requirements
1.5 Obtain tools, equipment and testing
devices
needed to carry out installation work in
accordance with established procedures and
LO 1. Assemble computer TLE_IACSS9-
DAY 2 8:00 AM TO 5:00 PM check for correct operation and safety DEMONSTRATION
hardware 12ICCS-Ia-e-28
1.6 Assemble computer hardware in
accordance with
established procedures and system
requirements
1.7 Perform BIOS configuration in accordance
with
hardware requirements

2.1 Create portable bootable devices in


accordance
with software manufacturer instruction
2.2 Prepare customized installers in
accordance with
TLE_IACSS9-
DAY 3 8:00 AM TO 5:00 PM LO 2. Prepare installer software utilization guide and end user PRACTICAL DEMONSTRATION
12ICCS-If-j-29
agreement
2.3 Carry out installation of portable
applications in
accordance with software user guide and
software license
3.1 Install Operating System (OS) in accordance
with
established installation procedures and to
comply
with end-user requirements
LO 3. Install operating system
3.2 Install peripherals/ devices in accordance
and drivers for TLE_IACSS9-
DAY 4 8:00 AM TO 5:00 PM with PRACTICAL DEMONSTRATION
peripherals/ devices 12ICCS-IIa-j-30
manufacturer’s instructions and/ or OS
installation procedures
3.3 Configure peripherals/ devices in
accordance with
manufacturer’s instructions and/ or OS
installation procedures
3.4 Access OS and drivers updates/ patches in
accordance with manufacturer’s
recommendations and requirements
LO 3. Install operating system
3.5 Install OS and drivers updates/ patches in
and drivers for TLE_IACSS9-
DAY 5 8:00 AM TO 5:00 PM accordance with manufacturer’s PRACTICAL DEMONSTRATION
peripherals/ devices 12ICCS-IIa-j-30
recommendations and requirements
3.6 Check the quality of the work undertaken
in
accordance with established procedures

4.1 Install Application Software based on


software
installation guides, end-user requirements and
TLE_IACSS9-
DAY 6 8:00 AM TO 5:00 PM LO 4. Install application software software license agreement PRACTICAL DEMONSTRATION
12ICCS-IIIa-e31
4.2 Carry out variation to application software
in
accordance to customer/ client requirements

4.3 Access software updates in accordance


with
manufacturer’s recommendations and
TLE_IACSS9-
DAY 7 8:00 AM TO 5:00 PM LO 4. Install application software requirements PRACTICAL DEMONSTRATION
12ICCS-IIIa-e31
4.4 Install software updates in accordance with
manufacturer’s recommendations and
requirements
5.1 Test devices/ systems and/or installation to
determine whether it conforms to
requirements
TLE_IACSS9-
DAY8 8:00 AM TO 5:00 PM
LO 5. Conduct testing and documentation 5.2 Conduct stress test to ensure reliability of PRACTICAL DEMONSTRATION
12ICCS-IIIf-j-32
equipment in accordance with manufacturer’s
instructions and system requirements

5.3 Follow 5S and 3Rs according to


environmental
policies
TLE_IACSS9- 5.4 Follow procedures in forwarding
DAY 9 8:00 AM TO 5:00 PM
LO 5. Conduct testing and documentation PRACTICAL DEMONSTRATION
12ICCS-IIIf-j-32 documentation
to appropriate personnel and/or authority on
the
test conducted.

1.1 Plan cable routes in accordance with


network
design and actual installation site
1.2 Determine cable routes in accordance with
LO 1 Install network cables TLE_IACSS9-
DAY 10 8:00 AM TO 5:00 PM network design and actual installation site PRACTICAL DEMONSTRATION
12SUCN-IVa-j-33
1.3 Identify necessary network materials in
accordance with established procedures and
check against system requirements
1.4 Obtain necessary network materials in
accordance with established procedures and
check against system requirements
1.5 Obtain tools, equipment, and testing
devices in
accordance with established procedures
1.6 Check tools, equipment and testing devices
LO 1 Install network cables TLE_IACSS9- in
DAY 11 8:00 AM TO 5:00 PM PRACTICAL DEMONSTRATION
12SUCN-IVa-j-33 accordance with established procedures
1.7 Follow OHS policies
1.8 Use appropriate PPE
1.9 Perform copper cable splicing based on
Electronic
Industries Alliance / Telecommunications
Industry Association (EIA/TIA) standards
1.10 Install network cables and cable raceways
in
accordance with established procedures and
installation requirements
1.11 Perform installation work and check for
unnecessary damage that has occurred and
LO 1 Install network cables TLE_IACSS9-
DAY 12 8:00 AM TO 5:00 PM complies with requirements PRACTICAL DEMONSTRATION
12SUCN-IVa-j-33
1.12 Follow OHS standards and 5S principles
according to enterprise requirements
1.13 Dispose excess components and materials
based on WEEE directives and 3Rs waste
management program

2.1 Check network connectivity of each


terminal in
accordance with network design
2.2 Diagnose and repair any problem or fault in
TLE_IACSS9-
DAY 13 8:00 AM TO 5:00 PM LO 2: Set network configuration the PRACTICAL DEMONSTRATION
12SUCN-Ia-e-34
network system in line with standard operating
procedures
2.3 Configure Network Interface Card (NIC) in
accordance with the network design
2.4 Carry out communication check between
terminals in accordance with operating
systems
TLE_IACSS9-
DAY 14 8:00 AM TO 5:00 PM LO 2: Set network configuration network configuration guides PRACTICAL DEMONSTRATION
12SUCN-Ia-e-34
2.5 Respond to unplanned events or conditions
in
accordance with established procedures

3.1 Configure client device systems settings in


accordance with manufacturer’s instructions
and
LO 3: Set end user preference
router/Wi-fi/wireless access TLE_IACSS9- 3.2 Configure LAN in accordance with
DAY 15 8:00 AM TO 5:00 PM PRACTICAL DEMONSTRATION
point/repeater configuration 12SUCN-If-j-IIae-35 manufacturer’s
instructions and network design
3.3 Configure WAN in accordance with
manufacturer’s instructions and network
design

3.4 Configure wireless settings in accordance


with
manufacturer’s instructions, network design,
and
LO 3: Set
end-user preferences
router/Wi-fi/wireless access TLE_IACSS9-
DAY 16 8:00 AM TO 5:00 PM 3.5 Configure security/firewall/advanced PRACTICAL DEMONSTRATION
point/repeater configuration 12SUCN-If-j-IIae-35
settings in
accordance with manufacturers instruction
and
end-user preferences
4.1 Undertake final inspection of the
configuration to
LO 4: Inspect and test the
TLE_IACSS9- conform to the manufacturer’s
DAY 17 8:00 AM TO 5:00 PM configured DEMONSTRATION
12SUCN-IIf-j-36 instructions/manual
computer networks
4.2 Ensure the configuration conforms to the
manufacturer’s instructions/manual

4.3 Check computer networks to ensure safe


operation
LO 4: Inspect and test the
TLE_IACSS9- 4.4 Prepare reports according to company
DAY 18 8:00 AM TO 5:00 PM configured DEMONSTRATION
12SUCN-IIf-j-36 requirements
computer networks
4.5 Complete reports according to company
requirements

1.1 Create user folder in accordance with


TLE_IACSS9- Network
DAY 19 8:00 AM TO 5:00 PM LO 1: Set up user access 12SUCS-IIIa-e37 operating system features DEMONSTRATION
1.2 Configure user access level based on NOS
features

1.3 Establish network access policies/end user


TLE_IACSS9- requirements
DAY 20 8:00 AM TO 5:00 PM LO 1: Set up user access 12SUCS-IIIa-e37 1.4 Perform security check in accordance with DEMONSTRATION
established network access policies/end user
requirements
2.1 Check normal server function in
accordance with
TLE_IACSS9- manufacturer’s instructions
DAY 21 8:00 AM TO 5:00 PM LO 2: Configure network services DEMONSTRATION
12SUCS-IIIf-jIVa-j-38 2.2 Install and update required modules/add-
ons on
NOS installation procedures

2.3 Confirm network services based on


user/system
requirements
2.4 Check operation of network services based
TLE_IACSS9-
DAY 22 8:00 AM TO 5:00 PM LO 2: Configure network services on DEMONSTRATION
12SUCS-IIIf-jIVa-j-38
user/system requirements
2.5 Respond to unplanned events or conditions
in
accordance with established procedures

3.1 Undertake predeployment procedures


based on
enterprise policies and procedures
3.2 Undertake operation and security check
based on
LO 3: Perform testing,
TLE_IACSS9- end-user requirements
DAY 23 8:00 AM TO 5:00 PM documentation, and DEMONSTRATION
12SUCS-Ia-j-39 3.3 Prepare reports according to enterprise
predeployment procedures
policies
and procedures
3.4 Complete reports according to enterprise
policies
and procedures
1.1 Plan maintenance and/ or diagnosis of
faults in
line with job requirements
1.2 Prepare maintenance and/ or diagnosis of
faults
LO 1. Plan and prepare for
TLE_IACSS9- in line with job requirements
DAY 24 8:00 AM TO 5:00 PM maintenance and DEMONSTRATION
12MRCN-IIa-e40 1.3 Obtain tools, equipment, and testing
repair
devices
needed for correct operation and safety
1.4 Check tools, equipment, and testing
devices
needed for correct operation and safety

1.5 Obtain materials necessary to complete the


work
in accordance with established procedures and
check against job requirements
LO 1. Plan and prepare for
TLE_IACSS9- 1.6 Follow OHS policies and procedures in line
DAY 25 8:00 AM TO 5:00 PM maintenance and DEMONSTRATION
12MRCN-IIa-e40 with
repair
job requirements
1.7 Check computer systems and networks for
maintenance against job/ service order or
instructions and specifications
2.1 Use appropriate PPE in line with standard
procedures
2.2 Check normal function of computer
LO 2. Maintain computer systems and
TLE_IACSS9-
DAY 26 8:00 AM TO 5:00 PM systems and networks in accordance with manufacturer’s DEMONSTRATION
12MRCN-IIf-j-41
networks instructions
2.3 Perform scheduled/ periodic maintenance
in
accordance with manufacturer’s requirements

2.4 Repair materials when needed in


accordance
with established procedures
2.5 Replace materials when needed in
LO 2. Maintain computer
TLE_IACSS9- accordance
DAY 27 8:00 AM TO 5:00 PM systems and DEMONSTRATION
12MRCN-IIf-j-41 with establish procedures
networks
2.6 Respond to unplanned events or conditions
in
accordance with established procedures
3.1 Use appropriate personal protective
equipment in
line with standard procedures
LO 3. Diagnose faults of
3.2 Diagnose faults or problems in the
computer systems TLE_IACSS9-
DAY 28 8:00 AM TO 5:00 PM computer DEMONSTRATION
and networks 12MRCN-IIIa-h42
systems and networks according to
requirements
and in line with the standard procedures

3.3 Manage contingency measures in


accordance
with established procedures
LO 3. Diagnose faults of
3.4 Implement contingency measures in
computer systems TLE_IACSS9-
DAY 29 8:00 AM TO 5:00 PM accordance DEMONSTRATION
and networks 12MRCN-IIIa-h42
with established procedures
3.5 Respond to unplanned events or conditions
in
accordance with established procedures
4.1 Use appropriate PPE in line with standard
procedures
4.2 Replace defective components or parts
LO 4. Rectify/ correct defects without
TLE_IACSS9-
DAY 30 8:00 AM TO 5:00 PM in computer damage to the surrounding environment or DEMONSTRATION
12MRCN-IIIh-jIVa-e-43
systems and networks services
4.3 Install correct components or parts without
damage to the surrounding environment or
services

4.4 Make the necessary adjustments in


accordance
LO 4. Rectify/ correct defects with established procedures
TLE_IACSS9-
DAY 31 8:00 AM TO 5:00 PM in computer 4.5 Respond to unplanned events or conditions DEMONSTRATION
12MRCN-IIIh-jIVa-e-43
systems and networks in
accordance with established procedures

5.1 Undertake final inspection so that the


configuration conforms to the manufacturer’s
LO 5. Inspect and test the instructions/manual
TLE_IACSS9-
DAY 32 8:00 AM TO 5:00 PM computer systems 5.2 Ensure that the configuration conforms to DEMONSTRATION
12MRCN-IVf-j-44
and networks the
manufacturer’s instructions/manual
5.3 Check/ test computer systems and
networks to
ensure safe operation
LO 5. Inspect and test the 5.4 Follow OHS standards and 5S principles
TLE_IACSS9-
DAY 33 8:00 AM TO 5:00 PM computer systems according to enterprise policies DEMONSTRATION
12MRCN-IVf-j-44
and networks 5.5 Clean worksite and make sure it is clear
from all
debris and left in safe condition in accordance
with company procedures

5.6 Dispose of excess components and


materials
based on WEEE directives and 3Rs waste
LO 5. Inspect and test the
TLE_IACSS9- management program
DAY 34 8:00 AM TO 5:00 PM computer systems DEMONSTRATION
12MRCN-IVf-j-44 5.7 Prepare report according to company
and networks
requirements
5.8 Complete report according to company
requirements

GRADED
PERFORM COMPETENCIES REQUIRED FOR
Day 35-40 8:00 AM TO 5:00 PM INSTITUTIONAL ASSESMENT DEMONSTRATION / ORAL
ASSESSEMENT
QUESTIONING

Prepared By: NOTED:

BIEN CHRISTIAN V. BONA GARY B. CASTAÑEDA


Training Center JDVP Focal Person School Head
WESTERN HORIZON SKILLS TRAINING AND ASSESSMENT CENTER INC. WESTERN HORIZON SKILLS TRAINING AND ASSESSMENT CENTER INC.

You might also like