Section D-D Section E-E Drain Pipe Layout Plan: Legend
Section D-D Section E-E Drain Pipe Layout Plan: Legend
W A L L
Repair shall be
extended to the last See Retaining Wall
damage portion) Detail
R E T A I N I N G
E E
A B
STD. STEEL SHEET PILE (400mm x 100mm x STD. STEEL SHEET PILE (400mm x 100mm x 2-4" (150mm) Ø
10mm x 6.0m length SKSP TYPE II) 10mm x 6.0m length SKSP TYPE II) Weep Holes
2-4" (150mm) Ø Weep Holes Ss=0.5% between every counter fort See Retaining Wall
Ss=0.5% between
(Perforated on half of its face) Detail
every counter fort
Counter Fort
(Perforated on
half of its face)
N
Counter Fort
Counter Fort
Counter Fort
Counter Fort
Counter Fort
Counter Fort
Counter Fort
6" (150mm) Ø Main
Drain (Perforated on SCALE 1 : 50 m
half of its face)
Selected
Earth Fill (Compacted every
200mm thick w/ MDD of
2-2" (50mm) Ø Weep 95-100% w/ a moisture content
Holes Ss=0.5% CONCRETE PAVER
w/in + 3% of the Optimum) BLOCKS
Between every
ELEV. 37.22
counter fort 2-2" (50mm) Ø Weep
211 kg/ sq.cm Reinf. Holes Ss=0.5%
100mm Ø PVC Between every
Concrete w/ 12mm Ø 150mm Ø PVC Pipe (S-1000) Pipe (S-1000) counter fort
RSB Sp. @ 30cm O.C.
B.W. (Remove and
replace the damage STD. STEEL SHEET PILE
concrete) STD. STEEL SHEET PILE (400mm x 100mm x (400mm x 100mm x 10mm
10mm x 6.0m length SKSP TYPE II) x 6.0m length SKSP TYPE
II)
Selected
Earth Fill (Compacted every
200mm thick w/ MDD of 3/8" Ø
WS ELEV. 33.03
95-100% w/ a moisture content PERFORATED SP. 1 AT QTR. POINTS P E R S P E C T I V E
w/in + 3% of the Optimum) STAGG. AT 45° SCALE: NDTS (FACING UPSTREAM)
P E R S P E C T I V E
Note: For Inclined
SCALE: NDTS (SHOWING COUNTER FORT)
Wall repair it shall
be based on actual 2.0m SPACING CENTER
field condition (If 150mm x 100 mm Ø PVC TEE TO CENTER
ever found during ELEV. 30.02 Pipe (S-1000)
construction that
the damage is
beyond this limit,
Repair shall be
extended to the last See Retaining Wall
damage portion) Detail
45°
SECTION E-E
SCALE: 1:100
15 cms THK. FINE AGG - CONC. SAND
15
15
30
15
15
15 30 15
15 15
ILTER DETAIL
r