Dp2 Illumination
Dp2 Illumination
A. Mall Entrance
B. Mall Corridor A
Area = 93.4 m·10.81058 m = 1009.7081 m2 L = 30.7 Watts·128.8 = 3954.16 Lumens SpacingL = 3.736 m
E = 150 lux CCT = 4000K = 1.868 m
UF = 0.64 N = 74.8105 ≈ 75 Lamps SpacingW = 3.6035 m
MF = 0.8 NL ≈ 25 , NW ≈ 3 = 1.8017 m
C. Mall Corridor B
Area = 18.4999 m·13.6394 m = 252.3291 m2 L = 42.4 Watts·128.8 = 3954.16 Lumens SpacingL = 3.6999 m
E = 150 lux CCT = 4000K = 1.8499 m
UF = 0.64 N = 18.6953 ≈ 20 Lamps SpacingW = 3.4098 m
MF = 0.8 NL ≈ 5 , NW ≈ 4 = 1.7049 m
D. Supermarket A
Area = 2.85 m·17.15 m = 48.8775 m2 L = 42.4 Watts·132.6 = 5622.24 Lumens SpacingL = 2.85 m
E = 300 lux CCT = 4000K = 1.425 m
UF = 0.64 N = 5 ≈ 6 Lamps SpacingW = 2.8583 m
MF = 0.8 NL ≈ 1 , NW ≈ 6 = 1.4291 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
E. Supermarket B
Area = 23.55 m·8.56 m = 201.558 m2 L = 42.4 Watts·132.6 = 3954.16 Lumens SpacingL = 3.3642 m
E = 300 lux CCT = 4000K = 1.868 m
UF = 0.64 N = 21.0090 ≈ 75 Lamps SpacingW = 3.8533 m
MF = 0.8 NL ≈ 7 , NW ≈ 3 = 1.4266 m
F. Supermarket C
Area = 31.35 m·13.4 m = 420.09 m2 L = 43.1 Watts·145.2 = 6258.12 Lumens SpacingL = 3.135 m
E = 300 lux CCT = 5000K = 3.35 m
UF = 0.64 N = 39.3323 ≈ 40 Lamps SpacingW = 1.5675 m
MF = 0.8 NL ≈ 10 , NW ≈ 4 = 1.675 m
G. Supermarket D
Area = 9.85 m·10.15 m = 99.9775 m2 L = 43.1 Watts·145.2 = 6258.12 Lumens SpacingL = 3.2833 m
E = 150 lux CCT = 5000K = 1.6416 m
UF = 0.64 N = 9.3607 ≈ 9 Lamps SpacingW = 3.3833 m
MF = 0.8 NL ≈ 3 , NW ≈ 3 = 1.6916 m
H. Money Exchanger
Area = 2.7 m·6.25 m = 16.875 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.35 m
CCT = 4000K = 0.675 m
E = 300 lux
N = 4.8232 ≈ 6 Lamps SpacingW = 2.0833 m
UF = 0.64
NL ≈ 2 , NW ≈ 3 = 1.0416 m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
2
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
I. Health Service Lobby
Area = 8.1 m·4.0501 m = 7.8917 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 2.7 m
E = 150 lux CCT = 4000K = 1.35 m
UF = 0.64 N = 4.6884 ≈ 6 Lamps SpacingW = 2.0250 m
MF = 0.8 NL ≈ 3 , NW ≈ 2 = 1.0125 m
L. Bank
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
M. Tellers Area A
N. Tellers Area B
O. Vault
P. 4 - Restaurant Kitchen
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Q. 4 - Restaurant Comfort Room
Area = 2.95 m·2 m = 5.9 m2 L = 15.5 Watts·118.4 = 1835.2 Lumens SpacingL = 1.475 m
E = 300 lux CCT = 4000K = 0.7375 m
UF = 0.64 N = 1.8837 ≈ 2 Lamps SpacingW = 2 m
MF = 0.8 NL ≈ 2 , NW ≈ 1 =1m
R. 4 - Restaurant Counter
S. 2 - Restaurant Dining I A
T. 2 - Restaurant Dining I B
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
U. 2 - Restaurant Dining I C
V. 2 - Restaurant Dining II A
W. 2 - Restaurant Dining II B
X. 2 - Restaurant Dining II C
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Y. Utility Closet
Area = 5.45 m·2.85 m = 15.5325 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 2.725 m
E = 100 lux CCT = 4000K = 1.3625 m
UF = 0.64 N = 1.4798 ≈ 2 Lamps SpacingW = 2.85 m
MF = 0.8 NL ≈ 2 , NW ≈ 1 = 1.425 m
Z. 3 - Food Stall I
Area = 2.85 m·4.4798 m = 12.7674 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.425 m
E = 300 lux CCT = 4000K = 0.7125 m
UF = 0.64 N = 3.6492 ≈ 4 Lamps SpacingW = 2.2399 m
MF = 0.8 NL ≈ 2 , NW ≈ 2 = 1.1199 m
Area = 4.45 m·4.27 m = 99.9775 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.4833 m
E = 300 lux CCT = 4000K = 0.7416 m
UF = 0.64 N = 7.2062 ≈ 9 Lamps SpacingW = 1.4233 m
MF = 0.8 NL ≈ 3 , NW ≈ 3 = 0.7116 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Ca. 3 - Food Stall IV
Ea. Cafeteria A
Fa. Cafeteria B
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Ga. Cafeteria C
Area = 4.2 m·6.2416 m = 26.2147 m2 L = 31.9 Watts·127.2 = 4057.68 Lumens SpacingL = 2.1 m
E = 300 lux CCT = 4000K = 1.05 m
UF = 0.64 N = 3.7854 ≈ 4 Lamps SpacingW = 3.1208 m
MF = 0.8 NL ≈ 2 , NW ≈ 2 = 1.5604 m
Area = 7.5 m·5.5064 m = 41.298 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.875 m
CCT = 4000K = 0.9375 m
E = 300 lux
N = 11.8039 ≈ 12 Lamps SpacingW = 1.8354 m
UF = 0.64
NL ≈ 4 , NW ≈ 3 = 0.9177 m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Ka. 2 - Retail Store I Counter
Area = 7.6 m·4.8894 m = 37.1595 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.9 m
E = 300 lux CCT = 4000K = 0.95 m
UF = 0.64 N = 10.6210 ≈ 12 Lamps SpacingW = 1.6298 m
MF = 0.8 NL ≈ 4 , NW ≈ 3 = 0.8149 m
Area = 2.85 m·2 m = 5.7 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.425 m
CCT = 4000K = 0.7125 m
E = 300 lux
N = 1.6291 ≈ 2 Lamps SpacingW = 2 m
UF = 0.64
NL ≈ 2 , NW ≈ 1 =1m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Oa. 2 - Retail II Storage
Area = 4.85 m·5.6694 m = 12.7674 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.6166 m
E = 300 lux CCT = 4000K = 0.8083 m
UF = 0.64 N = 7.8591 ≈ 9 Lamps SpacingW = 1.8898 m
MF = 0.8 NL ≈ 3 , NW ≈ 3 = 0.9449 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Ib. Retail Store V
Area = 4.825 m·6.25 m = 30.1562 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.6083 m
E = 300 lux CCT = 4000K = 0.8041 m
UF = 0.64 N = 8.6193 ≈ 9 Lamps SpacingW = 2.0833 m
MF = 0.8 NL ≈ 3 , NW ≈ 3 = 0.1.0416 m
Area = 2.85 m·2 m = 5.7 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.425 m
E = 300 lux CCT = 4000K = 0.7125 m
UF = 0.64 N = 1.6291 ≈ 2 Lamps SpacingW = 2 m
MF = 0.8 NL ≈ 2 , NW ≈ 1 =1m
Area = 1.85 m·3.25 m = 6.0125 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.85 m
E = 150 lux CCT = 4000K = 0.925 m
UF = 0.64 N = 0.8592 ≈ 1 Lamps SpacingW = 3.25 m
MF = 0.8 NL ≈ 1 , NW ≈ 1 = 1.625 m
Lb. Lobby A
Area = 50.46 m·17.8m = 898.188 m2 L = 59.1 Watts·124.5 = 7357.95 Lumens SpacingL = 5.046 m
CCT = 3000K = 2.523 m
E = 150 lux
N = 35.7628 ≈ 40 Lamps SpacingW = 4.45 m
UF = 0.64
NL ≈ 10 , NW ≈ 4 = 2.225 m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Mb. Lobby B
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Qb. Stock Room II
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Ub. Changing Area
Area = 17.025 m·4.65 m = 79.1662 m2 L = 31.6 Watts·129.1 = 4079.56 Lumens SpacingL = 4.2562 m
E = 100 lux CCT = 4000K = 2.1281 m
UF = 0.64 N = 3.7901 ≈ 4 Lamps SpacingW = 4.65 m
MF = 0.8 NL ≈ 4 , NW ≈ 1 = 2.325 m
Area = 16.725 m·4.8 m = 80.28 m2 L = 31.6 Watts·129.1 = 4079.56 Lumens SpacingL = 4.1812 m
CCT = 4000K = 2.0906 m
E = 100 lux
N = 3.8434 ≈ 4 Lamps SpacingW = 4.8 m
UF = 0.64
NL ≈ 4 , NW ≈ 1 = 2.4 m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Yb. Mall Storage I Area C
Area = 6.7 m·2.66 m = 5.852 m2 L = 31.6 Watts·129.1 = 4079.56 Lumens SpacingL = 6.7 m
E = 100 lux CCT = 4000K = 3.35 m
UF = 0.64 N = 0.8532 ≈ 1 Lamp SpacingW = 2.66 m
MF = 0.8 NL ≈ 1 , NW ≈ 1 = 1.33 m
Area = 16.875 m·9.45 m = 42.6317 m2 L = 31.6 Watts·129.1 = 4019.56 Lumens SpacingL = 4.2187 m
E = 100 lux CCT = 4000K = 2.1093 m
UF = 0.64 N = 7.6347 ≈ 8 Lamps SpacingW = 4.725 m
MF = 0.8 NL ≈ 4 , NW ≈ 2 = 2.3625 m
Area = 10.2 m·5.45m = 55.59 m2 L = 20.5 Watts·96 = 1968 Lumens SpacingL = 2.55 m
E = 150 lux CCT = 3000K = 1.275 m
UF = 0.64 N = 8.2754 ≈ 8 Lamps SpacingW = 2.725 m
MF = 0.8 NL ≈ 4 , NW ≈ 2 = 1.3625 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Cc. Staff Lounge C
Area = 1.8 m·1.998 m = 3.5964 m2 L = 20.5 Watts·99 = 2029.5 Lumens SpacingL = 1.8 m
E = 150 lux CCT = 3500K = 0.9 m
UF = 0.64 N = 0.5191 ≈ 1 Lamp SpacingW = 1.998 m
MF = 0.8 NL ≈ 1 , NW ≈ 1 = 0.999 m
Area = 6.25 m·5.25 m = 41.076 m2 L = 16.3 Watts·126.3 = 2058.69 Lumens SpacingL = 3.125 m
E = 100 lux CCT = 5000K = 1.5625 m
UF = 0.64 N = 3.1129 ≈ 4 Lamps SpacingW = 2.625 m
MF = 0.8 NL ≈ 2 , NW ≈ 2 = 1.3125 m
Area = 6.25 m·5.45 m = 34.0625 m2 L = 16.3 Watts·126.3 = 2058.69 Lumens SpacingL = 3.125 m
CCT = 5000K = 1.5625 m
E = 100 lux
N = 3.2315 ≈ 4 Lamps SpacingW = 2.725 m
UF = 0.64
MF = 0.8 NL ≈ 2 , NW ≈ 2 = 1.3625 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Gc. Power Room II
Area = 6.8 m·4.52 m = 30.736 m2 L = 16.3 Watts·126.3 = 2058.69 Lumens SpacingL = 3.4 m
E = 100 lux CCT = 5000K = 1.7 m
UF = 0.64 N = 2.9159 ≈ 4 Lamps SpacingW = 2.26 m
MF = 0.8 NL ≈ 2 , NW ≈ 2 = 1.13 m
Area = 6.25 m·5.45 m = 34.0625 m2 L = 16.3 Watts·148.5 = 2420.55 Lumens SpacingL = 2.0833 m
E = 300 lux CCT = 5000K = 1.0416 m
UF = 0.64 N = 8.2454 ≈ 9 Lamps SpacingW = 1.8166 m
MF = 0.8 NL ≈ 3 , NW ≈ 3 = 0.9083 m
Area = 6.25 m·5.25 m = 32.8125 m2 L = 16.3 Watts·148.5 = 2420.55 Lumens SpacingL = 2.0833 m
E = 300 lux CCT = 5000K = 1.0416 m
UF = 0.64 N = 7.9428 ≈ 9 Lamps SpacingW = 1.75 m
MF = 0.8 NL ≈ 3 , NW ≈ 3 = 0.875 m
Area = 6.8 m·5.52 m = 37.536 m2 L = 16.3 Watts·126.3 = 2058.69 Lumens SpacingL = 3.4 m
CCT = 5000K = 1.7 m
E = 100 lux
N = 3.5611 ≈ 4 Lamp SpacingW = 2.76 m
UF = 0.64
NL ≈ 2 , NW ≈ 2 = 1.38 m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Kc. 2 - Toilet I
Area = 4.85 m·6.8894 m = 33.4136 m2 L = 15.5 Watts·118.4 = 1835.2 Lumens SpacingL = 2.425 m
E = 150 lux CCT = 4000K = 1.2125 m
UF = 0.64 N = 5.3341 ≈ 6 Lamps SpacingW = 2.2964 m
MF = 0.8 NL ≈ 2 , NW ≈ 3 = 1.1482 m
Lc. Toilet II A
Area = 4.85 m·7.4894 m = 36.3236 m2 L = 31.6 Watts·129.1 = 4079.56 Lumens SpacingL = 2.425 m
E = 300 lux CCT = 4000K = 1.2125 m
UF = 0.64 N = 5.7986 ≈ 6 Lamps SpacingW = 2.4964 m
MF = 0.8 NL ≈ 2 , NW ≈ 3 = 1.2482 m
Mc. Toilet II B
Area = 0.725 m·5.46 m = 3.9585 m2 L = 31.6 Watts·129.1 = 4079.56 Lumens SpacingL = 0.725 m
E = 300 lux CCT = 4000K = 0.3625 m
UF = 0.64 N = 6.1026 ≈ 6 Lamps SpacingW = 0.91 m
MF = 0.8 NL ≈ 6 , NW ≈ 1 = 0.455 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Oc. Stair I
Area = 4.2 m·5.8 m = 24.36 m2 L = 31.9 Watts·127.2 = 4057.68 Lumens SpacingL = 4.2 m
E = 150 lux CCT = 4000K = 2.1 m
UF = 0.64 N = 1.7588 ≈ 2 Lamps SpacingW = 2.9 m
MF = 0.8 NL ≈ 1 , NW ≈ 2 = 1.45 m
Pc. Stair II
Area = 5.8 m·4.2 m = 24.36 m2 L = 31.9 Watts·127.2 = 4057.68 Lumens SpacingL = 2.9 m
E = 150 lux CCT = 4000K = 1.45 m
UF = 0.64 N = 1.7588 ≈ 2 Lamps SpacingW = 4.2 m
MF = 0.8 NL ≈ 1 , NW ≈ 2 = 2.1 m
Area = 21.3 m·2.5m = 53.25 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 2.6625 m
CCT = 4000K = 1.3312 m
E = 150 lux
N = 7.61 ≈ 8 Lamps SpacingW = 2.5 m
UF = 0.64
NL ≈ 8 , NW ≈ 1 = 1.25 m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR GROUND FLOOR
Sc. Health Service Room B
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 GROUND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Wc. Mall Corridor C
Area = 10.15 m·48.8m = 495.32 m2 L = 30.7 Watts·128.8 = 3954.16 Lumens SpacingL = 3.3833 m
E = 150 lux CCT = 4000K = 1.6916 m
UF = 0.64 N = 36.6988 ≈ 39 Lamps SpacingW = 3.7538 m
MF = 0.8 NL ≈ 3 , NW ≈ 13 = 1.8769 m
Area = 10.15 m·15.85m = 160.8775 m2 L = 30.7 Watts·128.8 = 3954.16 Lumens SpacingL = 3.38333 m
E = 150 lux CCT = 4000K = 1.6916 m
UF = 0.64 N = 11.9196 ≈ 12 Lamps SpacingW = 3.9625 m
MF = 0.8 NL ≈ 3 , NW ≈ 4 = 1.9812 mm
Area = 29.6166 m·9.85 m = 291.7241 m2 L = 30.7 Watts·128.8 = 3954.16 Lumens SpacingL = 3.702 m
E = 150 lux CCT = 4000K = 1.851 m
UF = 0.64 N = 21.6142 ≈ 24 Lamps SpacingW = 3.2833 m
MF = 0.8 NL ≈ 8 , NW ≈ 3 = 1.6416 m
Area = 9.3833 m·15.85 m = 15.1201 m2 L = 30.7 Watts·128.8 = 3954.16 Lumens SpacingL = 3.1277 m
CCT = 4000K = 1.5638 m
E = 150 lux
N = 11.0192 ≈ 12 Lamps SpacingW = 3.9625 m
UF = 0.64
NL ≈ 3 , NW ≈ 4 = 1.9812 m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Ad. Mall Corridor G
Area = 11.7 m·13.5894 m = 12.6574 m2 L = 30.7 Watts·128.8 = 3954.16 Lumens SpacingL = 3.9 m
E = 150 lux CCT = 4000K = 1.95 m
UF = 0.64 N = 11.7802 ≈ 12 Lamps SpacingW = 3.3973 m
MF = 0.8 NL ≈ 3 , NW ≈ 4 = 1.6986 m
Area = 61.05 m·10.8105 m = 659.9859 m2 L = 30.7 Watts·128.8 = 3954.16 Lumens SpacingL = 3.5911 m
E = 150 lux CCT = 4000K = 1.7955 m
UF = 0.64 N = 48.8991 ≈ 51 Lamps SpacingW =3.6035 m
MF = 0.8 NL ≈ 17 , NW ≈ 3 = 1.8017 m
Area = 8.3499 m·7.7894 m = 65.0416 m2 L = 42.4 Watts·132.6 = 5622.24 Lumens SpacingL = 4.1749 m
E = 150 lux CCT = 4000K = 2.0874 m
UF = 0.64 N = 3.3892 ≈ 4 Lamps SpacingW = 3.8947 m
MF = 0.8 NL ≈ 2 , NW ≈ 2 = 1.9473 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Ed. 2 - Retail Store VII
Area = 10.6 m·7.8 m = 82.68 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.7666 m
E = 300 lux CCT = 4000K = 0.8333 m
UF = 0.64 N = 23.6318 ≈ 24 Lamps SpacingW = 1.95 m
MF = 0.8 NL ≈ 6 , NW ≈ 4 = 0.975 m
Area = 7.216 m·5.85 m = 42.2171 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.8041 m
E = 300 lux CCT = 4000K = 0.9020 m
UF = 0.64 N = 12.0666 ≈ 12 Lamps SpacingW = 1.95 m
MF = 0.8 NL ≈ 4 , NW ≈ 3 = 0.975 m
Area = 7.525 m·5.4894 m = 41.3078 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.8812 m
E = 300 lux CCT = 4000K = 0.9406 m
UF = 0.64 N = 11.8067 ≈ 12 Lamps SpacingW = 1.8298 m
MF = 0.8 NL ≈ 4 , NW ≈ 3 = 0.9149 m
Area = 2.85 m·2 m = 5.7 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.425 m
CCT = 4000K = 0.7125 m
E = 300 lux
N = 1.6291 ≈ 2 Lamps SpacingW = 2 m
UF = 0.64
NL ≈ 2 , NW ≈ 1 =1m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Id. 2 - Retail Store IX Storage
Area = 4.825 m·5.6694 m = 42.6317 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.6083 m
E = 150 lux CCT = 4000K = 0.8041 m
UF = 0.64 N = 7.8186 ≈ 9Lamps SpacingW = 1.8898 m
MF = 0.8 NL ≈ 3 , NW ≈ 3 = 0.9449 m
Area = 12.075 m·6.25m = 75.4687 m2 L = 20.5 Watts·105 = 2152.5 Lumens SpacingL = 1.725 m
CCT = 4000K = 0.8625 m
E = 300 lux
N = 20.5435 ≈ 21 Lamps SpacingW = 2.0833 m
UF = 0.64
NL ≈ 7 , NW ≈ 3 = 1.0416 m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Md. Retail Store XII
Area = 6.825 m·6.25m = 42.6562 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 1.7062 m
E = 300 lux CCT = 4000K = 0.8531 m
UF = 0.64 N = 12.1921 ≈ 12 Lamps SpacingW = 2.083 m
MF = 0.8 NL ≈ 4 , NW ≈ 3 = 1.0416 m
Area = 5.4 m·16.90204m = 91.2710 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 2.7 m
E = 100 lux CCT = 4000K = 1.35 m
UF = 0.64 N = 8.6957 ≈ 10 Lamps SpacingW = 3.3804 m
MF = 0.8 NL ≈ 2 , NW ≈ 5 = 1.6902 mm
Area = 14.0034 m·3.7 m = 51.8128 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 2.8006 m
E = 100 lux CCT = 4000K = 1.4003 m
UF = 0.64 N = 4.9364 ≈ 5 Lamps SpacingW = 3.7 m
MF = 0.8 NL ≈ 5 , NW ≈ 1 = 1.85 m
Area = 25.15 m·5.9 m = 148.385 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 3.1437 m
CCT = 4000K = 1.5718 m
E = 100 lux
N = 14.1372 ≈ 16 Lamps SpacingW = 2.95 m
UF = 0.64
MF = 0.8 NL ≈ 8 , NW ≈ 2 = 1.475 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Qd. Theater Hallway IV
Area = 21.5 m·4.7 m = 101.05 m2 L = 42.4 Watts·132.6 = 3954.16 Lumens SpacingL = 5.375 m
E = 100 lux CCT = 4000K = 2.6875 m
UF = 0.64 N = 3.5104 ≈ 4 Lamps SpacingW = 4.7 m
MF = 0.8 NL ≈ 4, NW ≈ 1 = 2.35 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Ud. Theater Tickets I
Wd. Theater I A
Xd. Theater I B
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Yd. Theater I C
Ae. Theater II A
Be. Theater II B
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Ce. Theater II C
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Ge. Theater III C
Area = 8.3499 m·7.7894 m = 65.0416 m2 L = 42.4 Watts·132.6 = 5622.24 Lumens SpacingL = 4.1749 m
E = 150 lux CCT = 4000K = 2.0874 m
UF = 0.64 N = 3.3892 ≈ 4 Lamps SpacingW = 3.8947 m
MF = 0.8 NL ≈ 2 , NW ≈ 2 = 1.9473 m
Je. Elevator
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Ke. Toilet II A
Area = 4.85 m·7.4894 m = 41.3078 m2 L = 15.5 Watts·118.4 = 1835.2 Lumens SpacingL = 2.425 m
E = 150 lux CCT = 4000K = 1.2125 m
UF = 0.64 N = 5.7986 ≈ 6 Lamps SpacingW = 2.4964 m
MF = 0.8 NL ≈ 2 , NW ≈ 3 = 1.2482 m
Le. Toilet II B
Area = 0.725 m·5.26 m = 3.9585 m2 L = 15.5 Watts·118.4 = 1835.2 Lumens SpacingL = 0.725 m
E = 150 lux CCT = 4000K = 0.3625 m
UF = 0.64 N = 6.1026 ≈ 6 Lamps SpacingW = 0.91 m
MF = 0.8 NL ≈ 1 , NW ≈ 6 = 0.455 m
Area = 8.7 m·4.85 m = 42.195 m2 L = 12.4 Watts·120.5 = 1494.2 Lumens SpacingL = 2.175 m
E = 150 lux CCT = 4000K = 1.0875 m
UF = 0.64 N = 8.2732 ≈ 8 Lamps SpacingW = 2.425 m
MF = 0.8 NL ≈ 4 , NW ≈ 2 = 1.2125 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR SECOND FLOOR
Oe. Theater Storage Room
Area = 2.728 m·7.2965 m = 19.9048 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 2.728 m
E = 150 lux CCT = 4000K = 1.364 m
UF = 0.64 N = 2.8446 ≈ 3 Lamps SpacingW = 2.4321 m
MF = 0.8 NL ≈ 1 , NW ≈ 3 = 1.216 m
Area = 4.45 m·4.345 m = 19.3352 m2 L = 16.3 Watts·126.3 = 20.58.69 Lumens SpacingL = 4.45 m
E = 100 lux CCT = 4000K = 2.225 m
UF = 0.64 N = 1.8343 ≈ 2 Lamps SpacingW = 2.1725 m
MF = 0.8 NL ≈ 1 , NW ≈ 2 = 2.0862 m
Area = 4.45 m·4.345 m = 19.3352 m2 L = 16.3 Watts·126.3 = 20.58.69 Lumens SpacingL = 4.45 m
E = 100 lux CCT = 4000K = 2.225 m
UF = 0.64 N = 1.8343 ≈ 2 Lamps SpacingW = 2.1725 m
MF = 0.8 NL ≈ 1 , NW ≈ 2 = 2.0862 m
Area = 4.6 m·13.6 m = 62.56 m2 L = 59.1 Watts·131.2 = 7753.92 Lumens SpacingL = 4.6 m
CCT = 4000K = 2.3 m
E = 150 lux
N = 2.3637 ≈ 3 Lamps SpacingW = 4.5333 m
UF = 0.64
NL ≈ 1 , NW ≈ 3 = 2.2666 m
MF = 0.8
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 SECOND FLOOR ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR BASEMENT PARKING
Se. Parking A
Area = 129.3 m·15.83 m = 2046.819 m2 L = 43.1 Watts·152.2 = 6559.82 Lumens SpacingL = 5.8772 m
E = 100 lux CCT = 4000K = 2.9386 m
UF = 0.64 N = 60.942 ≈ 66 Lamps SpacingW = 5.2766 m
MF = 0.8 NL ≈ 22 , NW ≈ 3 = 2.6383 m
Te. Parking B
Area = 129.3 m·21.58 m = 2790.294 m2 L = 43.1 Watts·152.2 = 6559.82 Lumens SpacingL = 5.8772 m
E = 100 lux CCT = 4000K = 2.9386 m
UF = 0.64 N = 83.0783 ≈ 88 Lamps SpacingW = 5.395 m
MF = 0.8 NL ≈ 22 , NW ≈ 4 = 2.6975 m
Ue. Parking C
Area = 41.1081 m·9.99 m = 410.6704 m2 L = 43.1 Watts·152.2 = 6559.82 Lumens SpacingL = 5.8725 m
E = 100 lux CCT = 4000K = 2.9362 m
UF = 0.64 N = 12.2273 ≈ 14 Lamps SpacingW = 4.995 m
MF = 0.8 NL ≈ 7 , NW ≈ 2 = 2.4975 m
Ve. Parking D
Area = 74.08 m·9.99m = 740.0592 m2 L = 43.1 Watts·152.2 = 6559.82 Lumens SpacingL = 5.6984 m
CCT = 4000K = 2.8492 m
E = 100 lux
N = 22.0345 ≈ 26 Lamps SpacingW = 4.995 m
UF = 0.64
MF = 0.8 NL ≈ 13 , NW ≈ 2 = 2.4975 m
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 BASEMENT PARKING ILLUMINATION
PLACE LAGUNA 123-456-789-000
ILLUMINATION FOR BASEMENT PARKING
We. Parking Stair A
Area = 10.1 m·9.45m = 95.445 m2 L = 20.5 Watts·100 = 2050 Lumens SpacingL = 2.525 m
E = 150 lux CCT = 4000K = 1.2625 m
UF = 0.64 N = 13.6401 ≈ 16 Lamps SpacingW = 2.3625 m
MF = 0.8 NL ≈ 4 , NW ≈ 4 = 1.1812 mm
ELECTRICAL ENGINEERING
PROFESSIONAL ENGINEER
LOCATION: CHECKED BY: DATE:
MARANAN, JULIUS C.
NOSCAL, CARL JOSHUA P.
PENA, ROLAND JOHN D.
1
REYES, MIKKO R.
13
DEPARTMENT PRC NO. 1458923
SHEET CONTAINS:
PTR NO. 2024123456 DATE: DEC 8 2023
CALAMBA, LAGUNA ENGR. MARA JESSA B. MACARAIG MAY 16, 2025 BASEMENT PARKING ILLUMINATION
PLACE LAGUNA 123-456-789-000