300 KLD Civil Drawing
300 KLD Civil Drawing
D
35360
F.F.L + 900 MM Notes
C-03
11800 2000 3500 3500 5500 6060 INT. ROAD LEVEL
1. Do not scale the dimensions, follow the written dimensions (mm), unless
300
P-01 2000 700 700 700 P-02 OF ROYAL SIGNATURE
otherwise mentioned.
FIN LVL. +600 MM
A 2. Dimensions shown in these drawings are structural dimensions, unless
600
500
700
1000
MH
950
1500 4750 1500 NON TOWER LEVEL noted otherwise.
MH
CLEAR WATER TANK
1500
SEWAGE INLET AS DN FIN. P-07 TUBE SETTLER SWD = 3.4m
T.O.S ± 00
3. The drawing to be read in conjunction with relevant Architectural,
FIN. LVL.-2575
BASEMENT LEVEL 01
600
Cutout AREA= 27.5 m2
MBBR-2
BAFFLE WALL
LAUNDER
PER SITE. LVL.+900 Structural and M.E.P. drawings/details.
3050
BAR SCREEN -1 -3 -5 -7 -9 -11 -13 -15 -17 -19 600x600 AREA = 16.6m2
MBBR-1 OPEN TOP C-06 F.F.L - 4650 MM TUBE SETTLER-I
2625
IL=( - )3700 Vol. 56.4 KL
2425
CHAMBER -32 -31 -29 -27 -25 -23 -21 -20 SWD = 3.8m
600 700 C-05 SWD = 3.9m 4. Any discrepancy to be brought to the notice of Architect prior to
150
STP FIN. MH
C-01 Vol. 68 KL RCC TOP
1400
LVL.-4650
ENTRANCE 12 STEPS
440 commencement of work.
5000
5000
Vol. 70 KL
1000
MH OPEN TOP FIN.
UP W=1500 MM P-11
200
T=250 MM LVL.-2575
EQUALIZATION TANK 600 700 OPEN TOP
450
R=172.91 MM
0 MH
AIR VENT U-TYPE SWD = 2.6m
C-06 736 T.O.S -2625 MM 12
600
Cutout 1.0 MT. HIGH RAILING 11
P-09 COMPANY'S CONTACT
600
Vol.153 KL P-04 TOTAL STEPS =32 NOS. MH
CONSULTANTS
500
500
W=1500 MM 600x600 9
P-22
150
RCC TOP T=250 MM
NAME DETAILS
FIN. P-05 -1 TO -20 (R = 173.75 MM)
RCC WALKWAY 1500MM P-20
7 12 STEPS
1800
UP -21 TO -32 (R = 172.92 MM)
1200 C-04 W=1500 MM
1600
LVL.-2575
A T=250 MM
1350
1400 5
C-03 WIDE R=172.91 MM
1450
1200
900
P-23 EQUALIZATION TANK
800
900 O&G FACADE
3
85°
550
MH 300 300 300
400 C-02
300
EQUALIZATION TANK
180
12 11 9 7 5 3 1
UP
1
BOTTOM LVL
TOP LVL
B F.F.L - 4650 MM T.O.S. -7825 MM STRUCTURAL
5200
600
4000
4000
MH FIN.
DRAIN CHANNEL 1475
LVL.-4650
UF PERMEATE SLUDGE
325
SLUDGE HOLDING 1875
DN FIN.
B
P-06
P-08
P-10
LVL.-7775 MCC PANEL 2500 TANK HOLDING TANK
P-12
TANK P-18 T.O.S -7325 MM M.E.P
400
2925
-18 -17 -15 -13 -11 -9 -7 -5 -3 -1
3200
3200
2600
SWD = 4.0m C-08 P-03 P-15 P-19
Vol.51 KL
18 STEPS
W=1500 MM
ANOXIC TANK SLUDGE RE-CIR.PUMP FILTER FEED
RCC TOP T=250 MM SWD = 4.0m Vol.40 KL RCC TOP PUMP
EQUALIZATION TANK P-21 EQUALIZATION TANK
P-16 P-17 SCREW PUMPS
FILTER PRESS
R=173.61 MM
BASEMENT LEVEL 02
P-14
BOTTOM LVL
T.O.S. -7825 MM 200
TUBE SETTLER DETAIL LANDSCAPE
P-13
6000
IGBC
600
MH
SUMP PIT F.F.L - 7825 MM GREEN BUILDING
300
SWD = 2.0m UF PLANT MGF
2000
PROVISION FOR CONNECTED
CIP PUMPS
STP FROM BASEMENT
RCC TOP
P-27 P-25
FEED PUMPS
10 SECTION - DD 6mm THICK
P-21 P-22 M.S. PLATE
150
MICRON FILTER
DRAIN CHANNEL
2450
D
P-24 P-29 P-30
M.S. FLANGE
150
DRAIN CHANNEL
2. ALL CIVIL TANK TO BE WATER PROOF COATED & WATER FILL TESTED. M.S. PLATE 6mm THICK M.S. PLATE
TREATED WATER TANK
UF PERMEATE TANK SWD = 4.0m
WELDED WELDED
SWD = 4.0m EQUALIZATION TANK 01 11.8m X 5.0 m X 2.6m + FB 153 KL 3. PVC COATED RUNGS TO BE PROVIDED IN EACH TANK FOR ACCESS. M.S. PIPE M.S. PIPE
Vol. 106 KL
150
TANK SIDE OUT SIDE
30 THREADED TANK SIDE
Vol. 109 KL RCC TOP
47 4. ALL CIVIL WORK INCLUDING WALKWAY MANHOLE COVERS, PUDDLES &
NOMINALØ
RCC TOP ANOXIC TANK 01 5.0m X 2.0m X 4.0m + FB 40 KL CL OF PIPE
C
L OF PIPE
P.C.D
MH INSERTS ARE IN CLIENT SCOPE.
P-31 MBBR TANK-1 01 3.5m X 5.0m X 3.9m + FB 70 KL SLIP ON FLANGE
150
5. POSITION OF EQUIPMENT FOUNDATION MAY BE CHANGED OUT SITE
01 THICKNES (T)
7800 7665 500 MBBR TANK-2 3.5m X5.0m X 3.8m + FB 68 KL 150 150 100 150
ACCORDING TO SITE CONDITIONS. R.C.C. WALL
R.C.C. WALL AS/STR.
TUBE SETTLER TANK 01 5.5m X 5.0m X 2.0m + FB 55 KL 6. DRAIN CHANNELS SHALL BE COVERED WITH GI GRATINGS
AS/STR.
D
CLEAR WATER TANK 01 AREA = 16.6m2 X 3.4m + FB 56.4 KL 7. RAILINGS SHOULD BE PROVIDED FOR THE STAIRCASE AND
DETAIL OF PIPE INSERT FOR PIPES DETAIL OF PIPE INSERT FOR PIPES
01 4.0m X 3.2m X 4.0m + FB 51.2 KL WHEREVER NECESSARY. SCALE = N.T.S
SLUDGE HOLDING TANK SCALE = N.T.S
INT. ROAD LEVEL 10. PROVISION TO BE MADE FOR ADEQUATE VENTILATION OF PLANT 150Ø 275.00 231.25 8 16 12
200Ø 331.25 287.50 8 16 12
300
OF ROYAL SIGNATURE
ROOM TO PROVIDE 30 AIR 250Ø 400.00 350.00 8 20 15
FIN LVL. +600 MM -1
-3
NON TOWER LEVEL -5
VENTILATION SYSTEM SHELL BE IN CLIENT SCOPE. PUDDLE
T.O.S ± 00
-7
-9 12. ALL MANHOLE SIZE 800MM X 800 MM. R0 18.02.25 GOOD FOR CONSTRUCTION A.S. Ajay
B.O.P
-11 P-07 P-09 P-11
2625
Rev.No. Date Description Drawn By Checked by
2425
-15
T=250 MM PUDDLE & CUTOUT LIST REVISIONS & ISSUES
-1 TO -20 (R = 173.75 MM)
-21 TO -32 (R = 172.92 MM)
-17 F.F.L - 7825 MM TO BE CONSIDER AS 00
.± STANDER
X
200
-19
-20 TABLE - E QTY.
SEWAGE INLET AS -21
WITH SIDE PURPOSE OF DRAWING
MH
500
600
DIMENSION-X (B.O.P)
700
-23
PER SITE. IL=( - )3700 1500 LOCATION
1100
1100
-25 400
FIN. BOTTOM OF PUDDLE NB. (MM)
Plant Room
7325
2800
500
-29
LVL.-4650
-31 TUBE SETTLER A) BAR SCREEN CHAMBER CLIENT NAME & ADDRESS
1200
-32
P- 01
3900
3400
TANK
325
2600
EQUALIZATION TANK B)
500 EQUALIZATION TANK
300
EQUALIZATION TANK
BOTTOM LVL P- 03 DRAIN - 7825 mm GI 80 NB OUT SIDE 01
T.O.S. -7825 MM
P- 04 OVERFLOW - 5225 mm GI 100 NB OUT SIDE 01 PROJECT NAME & ADDRESS
P- 05 SUMP WATER INLET - 5125 mm GI 80 NB OUT SIDE 01
P-12 C- 01 SEWAGE INLET TOP SLAB OF TANK 250mm X 250mm 01
OF ROYAL SIGNATURE
FIN LVL. +600 MM
P- 07 OUTLET - 3325 mm GI 100 NB MBBR SIDE 01
600
E) MBBR TANK - 1
2425
F) MBBR TANK - 2
2025
P-04
P-05
-15
J)
4000
TUBE SETTLER
-13 18 STEPS
P-06
P-08
P-10
P-12
P-13
P-14
SLUDGE -11
W=1500 MM
T=250 MM P- 12 SLUDGE OUTLET - 7325 mm GI 150 NB OUT SIDE 01
T.O.S -7325 MM
HOLDING TANK R=173.61 MM
3175
P-03
-9
C- 06 OUTLET (CUTOUT) - 3425 mm 600mm Wide X 150mm deep 01
-7
-5
EQUALIZATION TANK
BOTTOM LVL
FIN.
LVL.-7775
-3 K) CLEAR WATER TANK
T.O.S. -7825 MM -1
P- 13 OUTLET - 7225 mm GI 100 NB OUT SIDE 01
P- 14 DRAIN - 7325 mm GI 80 NB OUT SIDE 01
P- 15 OVER FLOW - 3925 mm GI 80 NB OUT SIDE 01
SUMP PIT
SECTION - BB
L) SLUDGE HOLDING TANK
GR FLOOR LEVEL
F.F.L + 900 MM P- 16 OUTLET - 7225 mm GI 80 NB OUT SIDE 01
P- 17 INLET - 3225 mm GI 80 NB OUT SIDE 01
INT. ROAD LEVEL
P- 18 DRAIN - 7325 mm GI 80 NB OUT SIDE 01
300
OF ROYAL SIGNATURE
FIN LVL. +600 MM
C- 08 AIR INLET TOP SLAB OF TANK 150mm X 150mm 01
600
500
DRAWING TITLE
7625
P-28
P-26
P-29
UF PERMEATE TREATED WATER TANK P- 25 OUTLET - 7225 mm GI 100 NB OUT SIDE 01 SEWERAGE TREATMENT PLANT LAYOUT
5200
4000
P-24
P-27
P-25
P-30
TREATED WATER
TANK BOTTOM LVL
P- 27 DRAIN - 7325 mm GI 80 NB OUT SIDE 01 300KLD (300 KLD X 1 PHASE)
T.O.S -7325 MM P- 28 LEVEL CONTROLLER - 3225 mm GI 50 NB NONE 01
DRAWING NUMBER
P- 29 OVER FLOW - 3325 mm GI 100 NB OUT SIDE 01
P- 30 OUTLET (SPARE) - 7225 mm GI 100 NB OUT SIDE 01
T.O.S. -7825 MM
SEW_OMX_STP_1100
P) DISTRIBUTION PUDDLES
SCALE REV. NO. NORTH
P- 31 FLUSHING,IRRIGATION - 600 mm GI 100 NB OUT SIDE 03
SECTION - CC A1@1:100
GR FLOOR LEVEL
DATE
18-04-2025 R0