0% found this document useful (0 votes)
274 views20 pages

Inventory Excel

The document lists various real estate projects along with their respective areas, unit numbers, and prices. Notable projects include Adani Oyster, Chintels Serenity, and Hero Homes, with prices ranging from 1.35 crore to 8.60 crore. The document serves as a comprehensive overview of available properties in different locations.

Uploaded by

Pankaj Garg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
274 views20 pages

Inventory Excel

The document lists various real estate projects along with their respective areas, unit numbers, and prices. Notable projects include Adani Oyster, Chintels Serenity, and Hero Homes, with prices ranging from 1.35 crore to 8.60 crore. The document serves as a comprehensive overview of available properties in different locations.

Uploaded by

Pankaj Garg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 20

PROJECTS AREA UNIT NO.

ADANI OYSTER 2579 B/101


ADANI OYSTER 3200 H/103
CHINTELS SERENITY 1955 T2/1002
DIPLOMATIC GREEN 2200 B2/601
ENIGMA 3880 F/121
ENIGMA 7430 F/141
EMERALD BAY 1550 82/1802
EMERALD BAY 1550 B2/2602
EMERALD BAY 1700 B3/703
EMERALD BAY 2450 A1/2603
EMERALD BAY 2450 A2/402
EMERALD BAY 2450 A2/1802
HEARTSONG 1758 B6/501
HEARTSONG 1758 B2/1102
HEARTSONG 2003 B7/702
HERO HOMES 1099 T2/2601
HERO HOMES 1099 T6/1902
HERO HOMES 1099 T6/2205
HERO HOMES 1099 T2/2605
HERO HOMES 1099 T2/G05
HERO HOMES 1359 T5/1403
HERO HOMES 1359 T5/3304
HERO HOMES 1359 T5/3504
HERO HOMES 1359 T7/1004
HERO HOMES 1389 T2/2603
HERO HOMES 1689 T7/3302
HERO HOMES 1689 T5/3501
HERO HOMES 1689 T1/3402
HERO HOMES 2450 T8/3303
HERO HOMES 2450 T8/803
FIND
PRiCE
3.20cr
4,25cr/ 3,20
3.10cr
3.80cr/Flexlble
5.85cr
8.60cr
2.10cr
1.97cr
2.38cr/Flex
3.8Scr
3.65cr
3.62cr
1.90cr
1.95cr
2.35cr/1.80cr
1.45cr/Flex
1.48cr/1.18cr
1.45cr/85 Lacs
1.50cr
1.50cr
1.89cr/1.10cr
1.86cr
1.86cr
1.89cr
1.90cr
2.32cr
2.34cr
2.20cr
3.55cr/2.57cr
3.85cr
PROJECTS AREA UNIT NO.
SOBHA CITY 1711 B2/092
SOBHA CITY 2424 D4/34
SO8HA CITY 2459 D4/023
SOBHA CITY 2913 Z1/92
SHAPOORJI 915 AME/408
SHAPOORJt 1692 T8/003
SHAPOORJI 1692 T7/203
SHAPOORJI 1852 T6/104
SHAPOORJI 1852 Zade/1604
SHAPOORJI 1852 Zade/1704
SHAPOORJI 1852 T13/2104
TOURMALINE 1750 5191
TOURMALINE 2150 5202
GODREJ MERIDIAN 1625 T7/1803
GODREJ MERIDIAN 1855 T7/602
GODREJ MERIDIAN 2002 T5/902
WINDCHANTS 6565 T5/102
FIND
PRICE
3.45cr
4.84cr/4.24cr
5,40cr
6.40cr
1.35cr
2.1Scr/1.80cr
2.40cr/1.60cr
2.55cr/1.55cr
2.55cr
2.52cr
2.68cr
2.15cr/ 1.90cr
2.4Scr
2.65cr/2cr
2.95cr/2.50cr
3.2Scr/2.10cr
8.95cr/7.10cr
PROJECTS AREA UNIT NO.
ASSOTECH BLITH 1365 C/204
ASSOTECH BLITH 2400 B/1403
BRISK LUMBtNI 1880 E/101
BRISK LUMBtNl 2177 B/32
BRISK LUMBiNI 2177 B/041
BRISK LUMBINI 2836 C/112
CALADIUM 1880 A/151
CALADIUM 3050 D/52
CENTRUM PARK 1427 C/022
CENTRUM PARK 1481 P/073
CENTRUM PARK 1900 K3/174
PARAS DEWS 1385 F/707
PARAS DEWS 1760 B/2102
RAHEJA ATHARVA 1953 G/S02
RAHEJA ATHARVA 1860 E/53
THE HERMITAGE 1960 T8/806
THE HERMITAGE 1991 T3/104
HERITAGE MAX 1942 A/2202
SOLERA 485+80 AI/205
SOLERA 489+60 A1/004
SOLERA 553+80 A7/804
SOLERA 578 AS/902
SOLERA 640+100 C1/304
WOODSHIRE 1943 B2/803
WOODSHIRE 1943 B9/304
WOODSHIRE 2361 A2/604
WOODSHIRE 2361 A2/104
WOODSHIRE 2361 A1/803
WOODSHIRE 2361 A5/602
WOODSHIRE 2361 A2/001
WOODSHIRE 2762 A3/303
FINA
PRICE
1.50cr
2.52cr
1.8Scr
1.99cr
1.97cr
2.5Scr
2cr/Max
3.25cr/Max
1.55cr
1.55cr
2.05cr/1.50cr
1.49cr
1.80cr/1.35cr
1.5Scr
1.58cr
1.18cr/1cr
1.60cr
2.60cr
47 Lacs

57 Lacs/ Flex
65 Lacs
85 Lacs
1.87cr
1.85cr/71 Lacs
2.31cr
2.25cr
2.25‹:r
2.18cr
2.05Ccr
2.75cr
Emerald Bay BI-Higher 1550 2.30cr
Emerald Bay B2-Lower 1550 2cr
Emerald Bay B3—Lower 1550 1.95cr
Emerald Bay B2-Middle 1550 2.10cr
Emerald Bay B1-Lower 1550 2.10cr
Emerald Bay B2-Middle 1550 2cr
Emerald Bay B2-Middle 1700 2.30cr
Emerald Bay A3—Higher 2450 4cr
Emerald Bay A2—Higher 2450 3.60cr
Emerald Bay A3—Higher 2450 4cr
Emerald Bay A3—Lower 2450 4.25Cr
Emerald Bay A2—Higher 2450 3.70Cr
Emerald Bay A3—Higher 2450 4cr
Vishnu Sir/Vaibhav Sir
Office
Shapoorji "0"
Office
Vishnu Sir/ Shapoorji "0"
Giri Sir
Office
Office
Shrey Sir
Avik Sir
Office
Office
Office
Hero Homes T2-Middle 1099 1.60cr
Hero Homes T3-Higher 1099 1.35cr
Hero Homes T6—Lower 1099 1.50cr
Hero Homes T3—Lower 1099 1.53cr
Hero Homes T2—Higher 1099 1.50cr
Hero Homes T3—HigheF 1099 1.54cr
Hero Homes TO—Higher 1359 2cr
Hero Homes T5-Middle 1359 1.90cr
Hero Homes T5-Lower 1359 2.15cr
Hero Homes T6—Middle 13g9 2cr
Hero Homes T6—Middle t3g9 2cr
Hero Homes T3—Middle 13g9 .97cr
Hero Homes T5—Higher 16g9 2.35cr
Hero Homes T4-Middle 16g9 2.50cr
Hero Homes TI—Lower 1sg9 2.53cr
Hero Homes T5—Middle 1689 2.50cr
Hero Homes TI-Higher t6g9 2.2gcr
Hero Homes Tg-Higher 2450 3.3gcr

Centrum Park N—Lower" 14gi i.gscr


Centrum Park L—Middle 14gz .45cr
Centrum Park P—Middle I4g i.socr
Centrum Park Gl—Lower 2g s 3.1scr
Centrum Park G2—Lower 2gzs 2.90cr
Hermitage Tg-Middle 1450 1.15cr
Hermitage T7—Lower tgs6 2cr
Hermitage T6—M idd le 2655 2cr
Triumph 2—Lower 2290 2.74cr
Triumph 3—Hïgher 2290 2.7Scr
Triumph 2—H igher 2290 3cr
Triumph 2—Midd le 2290 3cr
Triumph 4—Midd le 2290 3cr
Triumph 2—Hïgher 2290 3.43cr
Triumph 1—H igher 229c 2.g0cr
Triumph 4—Power 2290 3cr
Triumph l—Higher 2290 3cr
Triumph 3—Midd le 2290 3.10cr
Triumph 8—Middle 3150 4cr
Triumph 7—Higher 3150 4cr
Vishnu Sir/Office
Yeshvir Sir
Ashok Malik Sir
Avik Sir
Giri Sir
Ashok Malik Sir
Ashok Malik Sir
Sanjeev 5ir/Ashok Sir
Ashok Malik Sir
office
Ashok Malik Sir
Office
Office
Ashok Malik Sir
Ashok Malik Sir
Ashok Malik Sir
Sanjeev Sir
Office

Office
Mukut Sir
Avik Sir
Office
Office
Mukut Sir
Office
Office
Giri Sir
Sanjeev Sir
Vishnu Slr/Office
Office
Office
Office
Office
Office
Office
Mukut Sir
Office
Office
PROJECT UNIT NO. AREA PRICE
Meridien T2-Higher 1366 2.11cr
Meridien T7-Lower 1366 2.10cr
Meridien T2-Lower 1366 2cr
Meridien T7-Higher 1625 2.45cr
Meridien T2-Lower 1625 3cr
Meridien T6-Middle 1855 2.95cr
Meridien T6-Lower 1gss 3. ocr
Meridien T7-Lower 1gss 2.70cr
Meridien TI-Lower tgss 3.25cr
Meridien T2-Higher tgss 3.25cr
Meridien T2-Middle 1gss 3.24cr
Meridien T6-Middle lgss 3cr
Meridien T6-Higher 1gss 3cr
Meridien T7-Higher 1855 3.25cr
Meridien T7-Middle 1gss 2.90cr
Meridien T7-Middle lgss 3cr
Meridien TI-Higher Igss 2.gscr
Meridien TI-Lower 1855 3.20cr
Meridien T5-Middle 2002 3.50cr
Meridien T3-M iddle 2002 3.50cr
Meridien T3-Higher 2002 3.40cr
Meridien T4-Higher 2002 3.30cr
Meridien T5-Middle 2002 3.50cr
Meridien T5-Higher 2002 3.60cr
Meridien T3-Higher 2002 4cr
Meridien TS-Higher 2002 3.30cr
Meridien T5-Higher 2002 3.60cr
Meridien T5-Higher 2002 4.25cr
Meridien T3-Lower 2720 4.25cr
Meridien T4-Higher 2720 Scr
Meridien T3-Higher 2720 5.44cr
Meridien T4-M iddle 2720 Scr
Meridien T4-Lower 2720 4.70cr
RI\g
Yeshvir Sir
Yeshvir Sir
Office/Vaibhav Sir
Sanjeev Sir
Office
Office
Office
Office
Office
Sanjeev Sir
Office/Vaibhav Sir
vaibhav Sir
Office/Vaibhav Sir
Office /Vaibhav Sir
Vaibhav Sir
vaibhav Sir
vaibhav Sir
Office
Office /Vaibhav Sir
Ashok Malik Sir
Office
Sanjeev Sir
Vaibhav Sir
Office /Vaibhav Sir
Vaibhav Sir
Office
Office
Office
SaVita Ma'arla
Office /Vaibhav Sir
Ashok Malik Sir
Ashok Malik Sir
Vaibhav Sir

You might also like