0% found this document useful (0 votes)
21 views12 pages

Vertical Aluminium Formwork-R4

Schach Engineers is an Indian company based in Mumbai that specializes in aluminum formwork systems for the construction industry, focusing on quality and safety. The company aims to be a leading choice for formwork solutions globally, utilizing innovative design and technology to enhance construction efficiency. Their aluminum formwork is designed for mass construction, offering durability, cost-effectiveness, and reduced labor requirements.

Uploaded by

ghoshpralay427
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views12 pages

Vertical Aluminium Formwork-R4

Schach Engineers is an Indian company based in Mumbai that specializes in aluminum formwork systems for the construction industry, focusing on quality and safety. The company aims to be a leading choice for formwork solutions globally, utilizing innovative design and technology to enhance construction efficiency. Their aluminum formwork is designed for mass construction, offering durability, cost-effectiveness, and reduced labor requirements.

Uploaded by

ghoshpralay427
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

ALUMINIUM

VERTICAL FORMWORK
EMERGING TECHNOLOGY FOR A BETTER FUTURE
COMPANY
PROFILE

Schach Engineers is an Indian company that specializes in the design, manufacturing and installation
of high-quality aluminum formwork systems. The company is based in Mumbai and has been
providing innovative formwork solutions to the construction industry.

At Schach Engineers, we understand the importance of quality and safety when it comes to aluminium
formwork system. That's why we only use the best materials and cutting-edge technology to
manufacture our products. Our team of experts is committed to ensuring that our products meet the
highest standards of quality and safety, making us your trusted partner in Formwork, scaffolding and
aerial work platform solutions.

In conclusion, we invite you to discover the quality and reliability of Schach Engineers Formwork,
scaffolding and aerial work platform solutions. We are confident that our products and services will
meet and exceed your expectations.

COMPANY
VISION & MISSION

Vision
To be the first choice of all customers and end users for ‘work at
height & Formwork solutions' across the globe. We at SCHACH
engineers are committed to set the highest standards of safety
at site.

Mission
SCHACH engineers are passionate about delivering superior
Aluminum Formwork system and take pride in achieving same by
developing the ideas, innovation. We believe in innovations, in way of
updated Designing & Planning Software's, Production New
Technology, Quality Assurance and Site Execution Report System to
provide the best Formwork solutions.

www.schachengineers.com
Page No - 01
About
SCHACH
Aluminium Vertical Formwork
Formwork systems are plays the major role in the success of a construction project in terms
of speed, quality, cost and safety of the works.

Aluminum formwork is a construction system for forming cast in place concrete structure of
a Building. Aluminum formwork is used for RCC(reinforced cement concrete), load-bearing,
multistoried buildings. This increases efficiency, and also produces an extraordinarily strong
structure with excellent concrete finish. This is one of the systems identified to be very much
suitable for Indian conditions for mass construction, where quality and speed can be
achieved at a high level. Vertical Formwork used to form vertical supporting elements of the
structure such as columns, core wall and shear walls etc.

SCHACH Formwork, we aim to partner with construction companies, civil contractors,


Consultant and Architecture Firms right from the planning stage of project so that we can
design, manufacture and deliver Aluminum Formwork that fulfill and exceed expectations of
client and End Users.

Our well experienced Sales management & Plant Operation teams accompany from designing
phase till the site execution. We provide solutions for the challenges faced by the
construction industry with quality and Safety being priority. The labors can effectively handle
this system to speed up the construction with no use of cranes , to assure quality control
and durability.

RCC Mahalaxmi Project ,Devangere,Karnataka

www.schachengineers.com
Page No - 02
Why?
SCHACH
 Our Sales Team has a been trained to develop a consultant bent of mind. They shall Guide
and Coordinate for your all project needs. Right from project cost control solutions to
design & drawings clearances to exact crystallization of your Formwork requirement.

 Design Team shall provide complete Support to Architecture, RCC or other stake holders.
Drawing know how shall be shared to convert your dream into reality. All necessary help
shall be provided to surmount project execution related challenges.

 We provide Friction Welded Panels (barring special panels) which results in high
strength, long life and durability of Aluminum Panels.

 Site Support for installation. Assistance and proper training to your technical staff.

 Use of 6061-T6 alloy of Aluminum for manufacturing, which allows up to 250 repetitions if
panels are used, stored and maintained properly.

 Auto Gauging Technology for cutting, punching, slotting which ensures consistent quality
of panels every single time.

Technical
Specification

 Standard Panel Weight ː 26.5 to 27 Kg


(600 W 2400)

 Average Vertical System Weight ː 18.5 to 22 kgs/m2


per SQM

 Raw Material Type / Grade ː Aluminum Alloy 6061-T6


 Fabrication ː CNC Cutting, Friction Welding , CNC pressing and Milling Machine ,
Buffing Machine, Panel Straightening Machine, Lacquering Machine
 Side Rail ː 65mm (Height) x 8mm (Thickness)
 Panel Section ː 4mm±0.1mm(thickness)
 Load Bearing Capacity ː 60KN / m2
 Repetition ː more than 250 times ( if maintained with Proper care)
 Cleaning ː Sulphuric Base Chemical
 Coating ː Polyurethane Clear Lacquer
 Standard Wall Panel Size ː 600mm/450mm/300mm(Width)X 2400mm(Height) X Depth 65mm

www.schachengineers.com
Page No - 03
Vertical Formwork
COMPONENTS

Wall Top Panel Internal Corner

Kicker Corner Kicker


External Corner

Rocker External Corner

Standard Wall Panel Kicker


600(Width)x2400(Height)

www.schachengineers.com
Page No - 04
Vertical Formwork
Accessories

Stub Pin Wedge Sacrificial Wall Tie


Wall Tie

Reusable PP Sheet Tubing Roll Waller Alignment


PVC Sleeve for Wall Tie for Wall Tie Clamp

Panel Hole Bari Wall Tie Sleeve Vertical Soldier


Puller Puller Pusher (MS Pipe-48x48)

Double Waller Tie Rod Platform Bracket


(MS Pipe-50x50x2mm(T)) with Disc Nut
(16mmDia)
MS Prop

www.schachengineers.com
Page No - 05
Process Flowchart
Aluminium Formwork
RAW MATERIAL
INSPECTION CUTTING(SHEARING) & PUNCHING & MILLING
(CHECKING DIMENSION BARCODE PASTING /SLOTTING
AND THICKNESS)

FITTING
WELDING OF RAIL &
FRICTION WELDING (FITTING OF FRAME OR STIFFNER
RAIL AND STIFFNER)

GRINDING
100% INSPECTION CLEANING, BUFFING
(GIVING FINISHING AND LAQUARING
(QUALITY CHECKING)
TOUCH)

PALLET PACKING IF LOADING OF FINISHED


MOCKUP IF REQUIRED
REQUIRED GOODS

We shall also conduct the following:


Patrol inspection at all running process at interval of one hour.

Welding Bend test on UTM

DP (Dye Penetration Test) test on weekly basis

www.schachengineers.com
Page No - 06
Formwork Design
Process Flowchart
1. ARCHITECTURAL & STRUCTURAL DRAWING
DRAWING FROM
2. ELEVATION DRAWING & STAIRCASE DETAILS
SALES TEAM
3. TYPICAL FLOOR PLAN

1. ELEVATION DESIGN
DRAWING STUDY & 2. MAIN DOOR DESIGN
SHELL PLAN 3. WINDOW DESIGN
PREPARATION 4. STAIRCASE DETAILS
5. SHEAR WALL DETAIL
Changes 6. DUCT PORTION DETAIL
SHELL PLAN RE-DESIGN OF SHELL PLAN 7. FLOOR LEVEL DETAIL
APPROVAL FROM 8. AREA CALCULATION
CLIENT SIDE Revised

PREPARATION OF
DRAWING AND BOQ
FOR PRODUCTION

www.schachengineers.com
Page No - 07
Aluminium Formwork
Features And Benefits
Aluminium Formwork System is highly suited to Structural wall construction whereas traditional
formwork consisting of plywood and timber is not suitable for the high pressures of free Flowing
concrete on the wall.

Load Carrying Capacity


1 The load-carrying capacity of Aluminum formwork is around 60KN/m2 per square meter.

Striking Time
2 The striking time of vertical (wall) formwork is 12-24 hours after concreting and horizontal
(deck) formwork is 36-72 hours after concreting.

Durability
3 As the panels of Aluminum formwork are made of structural grade aluminum alloy, they are
very durable and sturdy.

Cycle Time
4 High speed of construction can be achieved by this system that means faster completion of
the project. Approximately, the times required to cast floor is 7 days.

Labors
5 This System require relatively less labor with faster construction.

Cost Effective
6 This System is cost effective for Large volume of work and can be reused with minimum
maintenance.

www.schachengineers.com
Page No - 07
08
Projects
Aluminium Formwork

Mock Up
Curved Balcony Wall,
Heavy Column Round Column Radius Column Cenetral Park Project
Prime Square MI Constructions JP Enterprises

Concrete Finish,
Curved Balcony Wall,
Cenetral Park Project

Lift Wall , RDS Shear Wall , Aakash Associates

Heavy Column , RCC Mahalaxmi

Concrete Finish of Heavy Column


Akash Associates

Round Column , NCC Curvature Column


Parking Wall , KK Creation
Ahead Engineers

www.schachengineers.com
Page No - 09
OUR
CLIENTS

SWASTIK INFRACON ,PUNE,MAHARASHTRA


PAR HITECH CONSTRUCTIONS, PUNE, MAHARASHTRA
DISHA LANDMARK LLP, PUNE, MAHARASHTRA
MI CONSTRUCTIONS, MUMBAI ,MAHARASHTRA
KK CREATION, MUMBAI ,MAHARASHTRA
AK CONSTRUCTIONS , NAVI MUMBAI ,MAHARASHTRA
KHETALIYA INFRAVENTURE LLP, MUMBAI, MAHARASHTRA
B V CONSTRUCTION, MUMBAI ,MAHARASHTRA
MADHURE INFRA ENGINEERING PVT. LTD, PUNE, MAHARASHTRA
SHARMA CONSTRUCTION
SHWETA & SANTANA INFRA, PUNE, MAHARASHTRA
JP ENTERPRISES , Mumbai
AAKASH ASSOCIATES, Mumbai
AHEAD ENGINEERS , Udaipur
JAGO CONSTRUCTION, Navi Mumbai
G & J CONSTRUCTION, Mumbai

www.schachengineers.com
Page No - 10
COMPANY INFRASTRUCTURE

Mumbai Office Factory


201, Hari Om Plaza, Mahatma Gandhi Servey No -94, Jabarpada Pelhar,
Rd, Sukarwadi, Borivali East, Mumbai Road, near Patel Dairy,Vasai-Virar

Hyderabad Office Pune Office


Add - H NO 11-50/3, Survey No 511,Spot 18 Mall, Shivar Garden
447, Ghatkesar, Hyderabad Artillery Rd, Mana-mandir Society,
Rahatani, Pimpri-Chinchwad, Pune

Indore Office Bengaluru Office


408, Fourth Floor Apollo Premier 105/3, Behind Old SLV Kalyana
Building, Vijay Nagar Square, Indore Mantapa, Hennagara Cross, Hosur
Main Road, Bommasandra, Bengaluru
Noida Office
G 401, AVJ Heights Sector Zeta 1,
Greater Noida

You might also like