Po 11

The document contains a bending schedule detailing various reinforcement bars for construction, including specifications such as diameter, length, quantity, and shape. It outlines the requirements for high tensile steel bars used in the first-floor beams of a parish building extension project. The document is structured with sections and includes information on specific bar markings and their respective dimensions.

Uploaded by

Yaw Krah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

Po 11

The document contains a bending schedule detailing various reinforcement bars for construction, including specifications such as diameter, length, quantity, and shape. It outlines the requirements for high tensile steel bars used in the first-floor beams of a parish building extension project. The document is structured with sections and includes information on specific bar markings and their respective dimensions.

Uploaded by

Yaw Krah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 1a 2 2a 3 4 5 6 BENDING SCHEDULE

22420 BAR
250 MARK DIA. LENG. QTY. SHAPE
4030 7120 2870 5300 3100 100
R1000 R10 1150 50 400
75+75
4T25
200
R1001 R10 1350 228 75+75
A 400
150

1250 3560 3560


300
2780 R1002 R10 1850 35 550
75+75
B
450

2T1600 300
300

R10 R1003 R10 1350 35 75+75


4T2501 3T1603 4T2002 2T1602 3T2001
300

R1201 100 100


R12 3400 2 3200
100
R1202 R12 3400 2
2T16 7T2003 2T1602 4T1605 3300
2T1601 2T1604
SECT A-A 20-R1001@200c/c 35-R1002@200c/c B 52-R1001@200c/c
R1203 R12 2800 2 STRAIGHT
R1204 R12 2000 2 STRAIGHT
35-R1003@200c/c
R1205
350 A R12 2500 2 STRAIGHT
1st Floor Beam on gl B ( 1 Nos.) R1206 R12 9000 2 STRAIGHT
3T16 R1601
250 2870 5300 R16 9000 2 STRAIGHT

- High Tensile Steel bars


150

R1602 R16 2500 2 STRAIGHT


4T20 4T2005
C 2T1603 T1601 T16 4400 9 STRAIGHT
600

R10
T1602
150
2T16 T16 3000 4 STRAIGHT
450

Reinforcement ( Fy - 400N/mm )
2T1602 3T2004

2
T1603 T16 4000 5 STRAIGHT
450

38-R1001@200c/c T1604 T16 3400 8


300

150 R10 STRAIGHT


7T20 C D T1605 T16 5600 4 STRAIGHT
SECT B-B 2R12 T1606 T16 7300 2
3T20
1st Floor Beam on gl A2 ( 1 Nos.) 3100
STRAIGHT
T1607 T16 5600 3 STRAIGHT
250 SECT C-C T1608 STRAIGHT
2R1201 T16 5600 4
450

R10 T1609 T16 6000 4 STRAIGHT


2R12
2T1604 T2001 T20 4500 3 STRAIGHT
150

T2002 T20 6000 4 STRAIGHT


14-R1001@200c/c
T2003 STRAIGHT
450

T20 7500 7
2R16
300

R10 1st Floor Beam on gl A1 ( 1 Nos.) T2004 T20 5600 3 STRAIGHT


SECT H-H E T2005 T20 4200 4 STRAIGHT
D T2501 STRAIGHT
2T16 4030 7120 2870 5300 3100 T25 6000 4

SECT D-D
3560 3560

2R1202 3T1607 2R1204 4T1609 2R1203 4T1601 250 Client

MARTYRS OF UGANDA PARISH


3T16
3T1601 2T1606 2T1604 4T1608 2T1604
E Project

150
104-R1001@200c/c EXTENSION TO PARISH BUILDING

450
1st Floor Beam on gl A ( 1 Nos.)

300
R10
H
Title

10110
1ST FLOOR BEAMS DETAILS
2R1205 2R1206
2T16
Drawn by
SECT E-E Sheet no Designed by

2R1602 2R1601 H
50-R1000@200c/c ING. FREDERICK
11 OWUSU-ADDO

1st Floor Beam on gl Ao ( 1 Nos.)


Scale: 1:100