0% found this document useful (0 votes)
27 views11 pages

Surveying Formulae

The document provides a comprehensive overview of surveying concepts and formulas essential for civil engineering. It includes various correction methods, angle measurements, and conversions related to bearings and distances. Additionally, it offers practical applications and methods for accurate measurements in surveying practices.

Uploaded by

Shubham Pawara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views11 pages

Surveying Formulae

The document provides a comprehensive overview of surveying concepts and formulas essential for civil engineering. It includes various correction methods, angle measurements, and conversions related to bearings and distances. Additionally, it offers practical applications and methods for accurate measurements in surveying practices.

Uploaded by

Shubham Pawara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

For civil engineering study material join telegram : @akshaysir808

Surveying
All IMP
Formulas
By Akshay Sir
&
vsmdivioms
10. Direct vernier
smallestdonmaisc at
O 9. Least
count

& 11. Retrograde vernier


on Vos. H div . on M S.
.

&
12. Extended vernier
on v S
. .
=(2-1) div. on Ms .
Vernier scale &

·s 1. Scale
onmaa

Sce
#

~
use

E13. Least count = Smallest div

No of div. on
.
on M S
..

vernier scale min

E ~
.

un
2. Shrunk Shrunk length

·
-

Factor Actual length .

·
8. Correct i measured vom
i
Volume
*

Inmicting
D

Error due to wrong scale 3. Correct mensured


*
Distance shrinkage factor

Error due to shrunk scale


#

Sin
measur
measure
6. Correct
Length 4. Correct Measured Area

sin
=

7. Correct Area vinage factors


Area

*
&
5. Shrunk scale original Scale x s F
.
Gut
wi

16. Slope correction


E~3
14. Correct Actual length of chain measured

-
=
x

Distance Nominal
length of chain disth

Zum3
sm

E length o
17. Slope correction
Chain corrections
= -
L(1-coso)

15. Correct
sind Anal means
=
= 2
=

~ Area
m

mi
miner

E
18. Hypotenusal
Allowance
Chain
I

i **

Chn 24. Correction


for Msl
Surveying
mining
19. Pull correction

23. Correction for


misalignment

So
20. Temperature
correction,
e

mm
21. Sag correction Tape corrections
·
22. Normal Pull
For civil engineering study material join telegram : @akshaysir808

T #
28. Bearing and Included Angle
25. Conversions (WCB - RB):
a) 1st quadrant : RB = W C B. .
. (N-E]
Included
b) 2nd quadrant : RB = 180: W C B . .
. (S-E] Angle =
02-O ,

jo)
[S-W] O
Bearing of 1st Line
°

c) 3rd quadrant : RB .
= W C B .
. .
-
180 =
-

O2 of and Line
d) 4th quadrant Bearing
=
: RB
.
.
= 360 : W C B . .
.
[N-w]

&
Bearing of
any line
=
Bearing of preceding line +

Included Angle .

26. Conversions (RB-WCB): 29. True bearing =


Magnetic Bearing I
a) 1st quadrant magnetic Declination.
Compass Surveying
· W C B.
.
.
= RB
°

b) 2nd quadrant · W C B . .
.
= 180 -
R B . .

I * R-B i
W C B
1800
.
.

c) 3rd quadrant
.
.

· W C B . .
..
= RB . .
+

° + : E & & quadrant I &


quadra
RB
d) 4th quadrant
· W C B
. .
.
= 360 - .
.

-
: W : Ed - :W +: w & -iE .

°
When
·
sun at noon : T B
.
.
= 0 OR

TB
.
.
= 180 :

27. Back bearing =


Fore BearingI 1800 30. Local attraction ·

If /F B -
B B1 = 1800 >
-

Absent
1800
. .
.

+ve : when F B . . <


If IF B . -
B BI + 180 > -

present
F B > 188
.

ve : when
.
-
.
.

*

36. Sensitivity of bubble tube
35. Reciprocal levelling ·

bi S

=
Jo
o
-x -

sensitivity rad n > no · of div


-

shifted of

=
206265"
=
bubble .
nd

31. Height of instrument


-sinc BoMo + B
= . S .

b, 1
"

True diff .
= (d , -
+ 192 -
b2)

2
*

32. RL of a point
Levelng Reading
=
H I
.
.
-

Staff .

34. Corrections ·

as currature corrections = C =

- *
C = -
0 .

0784d2[m]
6) Refraction correction = Cr =

+ &

&

33. Checks o

C = + 0 .
01121d2
[ ] a) H I method
. . :

2 B S . -
EF S = Last R L -

1st R . L

-
. . . . .
.

2) combined correction = c =

b) Rise & Fall method


:

EF Last R L -1StR L

[am]
& B S S =

0672d2
. - . . .
.

c = -0 .

=
ERise-EFall .
For civil engineering study material join telegram : @akshaysir808

Contouring

T T

&

38. Interpolation #

37. Gradient =
change in Vertical distance
-
B
change in horizontal distance L
c cred ! R-L) X X(C A)
= -

· (B -
Al
X
>
A
D
39. Angle measurement:
45. Balancing of traverse
bet" A & B
If
angle is two
reading on M S
.
.
② Bowditich Rule : -

then Exact (N
reading A + X Least count) .

.
=

4 C ED 1
.

= 51 = .

where El .

N = Line on Vernies scale which

scale
coincides with main .

② Transit method :-

1
(
t (
= El = ED

or
. .

DT

T
Axis method : -

40. Latitude and Departure: = Y Closing error

Latitude = 1 COSO
.

Length of Axis .

Departure= 1 sin O .

Canine Crom Somb


Departure (East (+ ) WestC-1]

ote
,

44. Adjustment of bearings


correction for nth line
He
=

12
41. Checks: N-> Total lines .

a) closed Traverse :

21 = 0 2D = 0
,

b) Open Traverse :-
43. Relative error
2 =
Last Latitude 1st Latitude

te
-

RE Klosing
=
error
.

. . =

2D = Last Departure
-
1st Departure
perimeter.
.

42. Closing error

e = + (55
Ja
Direction = 6 = tan"
[]
T 49. Subtense bar method
46. Fixed hair method
#
D = KS + C D
1 Binrad
-

=
.

=
k c= f+ d
D =
2 x 206265 Bin seconds .

D = 2
B Sing "

47. Movable hair method


*

Fs fed
Tacheometer
D
= +

*
50. Inclined line of sight
* i staff held vertical :

D = KSCoS20 + CCOSO

48. Tangential method


V = KS
i20 + <sinc

ii) Staff held -

Angle of
Normal

divationo
is Both :

D = (KS + c) COSO I Sind


V = (KS + c) Sin 0 .

T
ii) of
Both Angle depression :

D
=-Fund ,

51. Anallactic lenses


iii) One elevation & one depression in

+
S
n = f
D =

tanc , + tanDe
For civil engineering
study material join
telegram :
@akshaysir808 Curves
* T
T

51. Elements of curve 52. Degree of curve 53. Offsets

* * #
i) Length of
I
curve =

som
ii)
i) Ox =

00-2 (from long choda

Tangent length = R tan #


2
ii) Ou
= (from
targent
-

iii) of T,
Chainage =
Chainage or v T L
.
- .

of Tz
Chainage of T L iii) On
"(C + >") (from chord
0 C
.
Chainage + produced
.
= .
=
,

iv) Length of Long chord = 2R


sin
External dist" =
v)
R(Sec-1
(ApeX dist)

vi) Mid Ordinate


R(1-COS)
=
57. Trapezoidal formula 54. Scale of photograph

My
* *

m
*
58. Simpson’s formula

Do 55. Relief Displacement

= =
d or n

59. Planimeter
.
A = M(F -
I [10N + 1)
Miscellaneous
A 56. Time interval between exposure
60. Prismoidal formula *

3600
T
&(A Az + 1Am]
=
v = , +

For civil engineering study material join telegram : @akshaysir808

You might also like