0% found this document useful (0 votes)
4 views6 pages

Instakart Services Private Limited: Kalash, Ncr-Bigbox, Patli, Hajipur

This Non-Conformance Report details issues observed in the pole foundation for the NCR Big Box project, including improper soil compaction and casting deficiencies. The report is directed to Pragati Infra Services Limited, with corrective actions required immediately. Responsibilities for addressing the issues are assigned to Jitender Saini and Amit Chaubey.

Uploaded by

Bittu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views6 pages

Instakart Services Private Limited: Kalash, Ncr-Bigbox, Patli, Hajipur

This Non-Conformance Report details issues observed in the pole foundation for the NCR Big Box project, including improper soil compaction and casting deficiencies. The report is directed to Pragati Infra Services Limited, with corrective actions required immediately. Responsibilities for addressing the issues are assigned to Jitender Saini and Amit Chaubey.

Uploaded by

Bittu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

INSTAKART SERVICES PRIVATE LIMITED

KALASH, NCR-BIGBOX, PATLI, HAJIPUR

NON-CONFORMANCE REPORT

PROJECT NAME: NCR Big Box QO NO.: NCR/PISL/NC-07


PROJECT NO: 3454-6208 DATE: 30TH June 2025
NC ISSUED TO PRAGATI INFRA SERVICES LIMITED
DESCRIPTION OF NC:
Subject: Observations Noted in Pole foundation

The following deviations have been observed:-

1. Compaction not Done: It has been observed that The pole foundation soil is not proper compacted.
2. Casting Issue : It has been observed that some pole not casted upto the desire level.

Location of Observations:
External Area
3

CORRECTION/ CORRECTIVE ACTION TAKEN (To be supported with evidence as applicable):


Please get these issues rectified and make sure such issues should not be repeated.

Responsibility of : Jitender Saini Amit Chaubey

To be completed by date: Immediately

Signature:

VERIFICATION REMARKS & ACCEPTANCE:

STATUS OF NC

Open Signature:
Name:
Closed Date:
Picture-01