S E W N: Structural Layout Plan - Ground Floor Beams & 1St Slab

The document outlines the structural layout plan and schedule for the ground floor beams and first slab, detailing the steel reinforcement specifications for various beams and slabs. It includes information on dimensions, steel grades, and construction notes, emphasizing the use of limit state design methods and specific concrete grades. Additional notes highlight de-shuttering times, site conditions, and quality checks required before concrete pouring.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

S E W N: Structural Layout Plan - Ground Floor Beams & 1St Slab

The document outlines the structural layout plan and schedule for the ground floor beams and first slab, detailing the steel reinforcement specifications for various beams and slabs. It includes information on dimensions, steel grades, and construction notes, emphasizing the use of limit state design methods and specific concrete grades. Additional notes highlight de-shuttering times, site conditions, and quality checks required before concrete pouring.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FBR7 FB5 FB4 FBR7

C-09 C-10 C-11


STR

FB1

FB3
FB4
FB1
S1 STR

FB4
FB3
S3
S1
1NOS - 16 MM Ø

C-06 FB5 C-07 FB3 C-08

FB1
EXTRA TOP

S1
S1
FBR7 FB5

C-05

FB3

FB3
FB0
S3

FB6
S1
FB3
FB3

S1 S3
HB
2 NOS - 12 MM Ø
BOTTOM BAR

FBR7 C-01 FB3 FB3 FB3 C-04


C-02 C-03
STIRRUPS AT MIDSPAN

FBR7
FBR7
FBR7

FBR7
8 MM Ø. @ 180 C/C

FBR

S1 S1 S1 S1

FB2 FB2 FB2 FB2


STRUCTURAL LAYOUT PLAN | GROUND FLOOR BEAMS & 1ST SLAB.
1 NOS - 10 MM Ø
CURTAIL BAR

SCHEDULE OF FLOOR BEAMS (G.F 1ST SLAB):-


TOP ANCHOR BAR
2 NOS - 12 MM Ø

STEEL IN BEAMS EXTRA TOP STIRRUPS


SR. CURTAIL BAR
BEAMS C/S SIZE (AT FIXED END) REMARKS
NO. 0.6
AT TOP AT BOTTOM 0.25L AT SUPPORT AT CENTER
6MM @ 150MM FLOOR
1 FB0 230X460 2 NOS - 12MM Ø. 2 NOS - 12MM Ø. 1 NOS - 12MM Ø. 2 NOS - 12MM Ø. 6MM @ 150MM C/C
C/C BEAM-(01)
6MM @ 150MM FLOOR
2 FB1 230X380 2 NOS - 10MM Ø. 2 NOS - 12MM Ø. --- 1 NOS - 10MM Ø. 6MM @ 150MM C/C
C/C BEAM-(03)
8MM @ 150MM FLOOR
3 FB2 230X460 2 NOS - 12MM Ø. 2 NOS - 12MM Ø. 1 NOS - 10MM Ø. 1 NOS - 16MM Ø. 8MM @ 180MM C/C
C/C BEAM-(04)
STIRRUPS AT SUPPORT

8MM @ 150MM FLOOR


8MM @ 180MM C/C
8 MM Ø. @ 150 C/C

4 FB3 230X460 2 NOS - 12MM Ø. 2 NOS - 12MM Ø. 1 NOS - 10MM Ø. 2 NOS - 12MM Ø. BEAM-(10)
C/C
8MM @ 100MM FLOOR
5 FB4 300X530 3 NOS - 16MM Ø. 2 NOS - 16MM Ø. 1 NOS - 16MM Ø. 3 NOS - 16MM Ø. 8MM @ 130MM C/C
C/C BEAM-(03)
8MM @ 100MM FLOOR
6 FB5 230x460 2 NOS - 16MM Ø. 3 NOS - 16MM Ø. 2 NOS - 12MM Ø. 3 NOS - 16MM Ø. 8MM @ 130MM C/C
C/C BEAM-(03)
8MM @ 130MM FLOOR
7 FB6 230X460 2 NOS - 16MM Ø. 2 NOS - 12MM Ø. --- 2 NOS - 12MM Ø. 8MM @ 130MM C/C
C/C BEAM-(01)
8MM @ 130MM CANTILEVER
8 FBR7 300X530 3 NOS - 16MM Ø. 2 NOS - 16MM Ø. --- 2 NOS - 16MM Ø. 8MM @ 130MM C/C
C/C BEAM-(08)
230

8MM @ 150MM CANTILEVER


9 FBR 230X460 2 NOS - 12MM Ø. 2 NOS - 12MM Ø. --- 1 NOS - 12MM Ø. 8MM @ 150MM C/C
C/C BEAM-(01)
8MM @ 150MM HIDDEN
10 HB 230X460 2 NOS - 12MM Ø. 2 NOS - 12MM Ø. --- 1 NOS - 12MM Ø. 8MM @ 150MM C/C
C/C BEAM-(01)
460
SCHEDULE OF SLAB (G.F 1ST SLAB):-

SR. THICKNESS STEEL IN SLAB EXTRA TOP


SLAB (MM) DISTRIBUTION STEEL REAMARKS
NO. L/4
SHORT SPAN LONG SPAN
8MM @ 150MM C/C ALT 8MM @ 300MM C/C 6MM @ 150MM C/C
1 S1 125 --- 1 - WAY SLAB
B/UP
8MM @ 130MM C/C ALT 8MM @ 260MM C/C 8MM @ 150MM C/C
2 S2 150 --- 1 - WAY SLAB
B/UP
8MM @ 130MM C/C ALT 8MM @ 130MM C/C 8MM @ 260MM C/C
3 S3 125 --- 2 - WAY SLAB
B/UP ALT B/UP
12MM @ 110MM C/C ALT 12MM @ 220MM C/C 8MM @ 100MM C/C
4 STR 180 --- STAIRCASE SLAB
B/UP

ADDITIONAL NOTES:-
* STRUCTURAL DESIGN IS DONE BASED ON ARCHITECTURAL DRAWING. * DE-SHUTTERING TIME PERIOD : - SLAB, BEAM BOTTOM - 14 DAYS, BEAMS &
* ALL SECTIONS ARE DESIGNED USING LIMIT STATE DESIGN METHOD. COLUMN (SIDES) - 24-48 HOURS. (AS PER THE ENGINEER IN CHARGE)
* ALL WORKS BELOW GROUND LEVEL SHALL BE EXECUTED IN DRY CONDITIONS. * ALL BEAMS TOP LEVEL MUST BE FLUSHED, BOTTOM LEVELS MAY VARY.
* MECHANICAL MIXER SHOULD BE USED FOR CONCRETE.
* POURING OF CONCRETE SHALL BE DONE AFTER CHECKING & SATISFACTION
OF SITE ENGINEER. * FIRE RATING CONSIDERED IS FOR 1 HOUR MAXIMUM.
* SECONDARY BEAMS ARE DESIGNED AS SIMPLY SUPPORTED BEAMS AT * STEEL SHOULD BE CHECKED BEFORE CONCRETING
DISCONTINUOUS ENDS THEREFORE EXTRA TOP BARS AT DISCONTINUOUS END * REFER DETAILED CONSTRUCTION NOTES BEFORE EXECUTION.
SHOULD BE NEGLECTED DURING LAYING THE REINFORCEMENT OF BEAMS.

ORIENTATION GENERAL NOTE'S:- PROJECT DETAILS:-

* GRADE OF CONCRETE M - 25 & GRADE OF STEEL Fe500


* SBC OF HARD MURUM IS CONSIDERED AS 200 kN/Sq. M. TO BE
S

VERIFIED WITH SITE SOIL TESTING REPORT.


W

* COVER TO REINFORCEMENT FOR FOOTING IS 50 mm,


* COVER TO COLUMNS IS 40 MM, BEAMS IS 25 MM, SLAB IS 20MM
* STRUCTURAL DESIGN IS FOR G+3 FLOOR ONLY.
E

* DIMENSIONS ARE NOT TO BE SCALED.


* MECHANICAL MIXER SHOULD BE USED FOR CONCRETE.
N

* STEEL SHOULD BE CHECKED BY ENGINEER BEFORE CONCRETING.


SHEET NO:- 07 | JOB ID: P_148 DATE:- 20 SEPT 2024 | REV. : 00