T2 Elevators Details
T2 Elevators Details
8 8
7 7
404.00 404.00
5350 5350 B
5250 100 5150 100 100
200 4950 200 200 4950 200 +966 500 049 253 P.O. Box 67501, Riyadh 11517
WWW.ATA-ARCHITECTS.COM KSA
CMU-300 C.R. No. 3036 / 0
CMU-300
NOTES
900
ROOF DECKFLOOR LEVEL
400
200 F.F.L 56800
200
200
200
2150
300
300
300
300
1. ALL WORK IS TO BE CARRIED OUT IN STRICT ACCORDANCE WITH
B B B B LOCAL AUTHORITY REQUIREMENTS, RELEVANT BUILDING CODES
ELEV.02
4000
4000
AND GOOD BUILDING PRACTICE.
700
700
600
600
600
600
2. THIS DRAWING IS NOT TO BE SCALED. ONLY FIGURED DIMENSIONS
2200
CMU-200 CO-300 CMU-200 CO-300 AND LEVELS ARE TO BE USED.
ELEV. PIT AT -9.35 M ROOF ANNEX FLOOR LEVEL
CMU-200 3. ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS MUST BE
F.F.L 52800 CHECKED ON SITE BEFORE COMMENCEMENT OF
300
300
CMU-200
1800
4. CONSTRUCTION WORK. ANY DISCREPANCIES ARE TO BE REPORTED
TO A.T.A. IMMEDIATELY.
4000
4000
ALL MATERIALS AND PRODUCTS SPECIFIED ON THIS DRAWING,
WHETHER BY BRANDED NAME OR GENERIC DESCRIPTION, ARE TO
2200
CMU-200 CMU-200 CO-350 BE CONSTRUCTED STRICTLY ACCORDING TO THE MANUFACTURERS
12th FLOOR LEVEL RECOMMENDATIONS AND SPECIFICATIONS. A.T.A. TAKES NO
F.F.L 48800 5. RESPONSIBILITY SHOULD THE CONTRACTOR DEVIATE FROM THIS
4100
4100
4100
4100
3900
3900
3900
3900
INSTRUCTION.
1800
ALL REPRESENTATIONS ON THIS DRAWING ARE THE PROPERTY OF
2900
2900
A.T.A.
4000
4000
2600
2600
2600
2600
ELEV.02 ELEV.03 ELEV.02 AND PROTECTED BY COPYRIGHT AND MAY THEREFORE NOT
ELEV.03
2200
BE REPRODUCED.
11th FLOOR LEVEL 6. CONTRACTORE IS RESPONSIBLE TO CHECK &VERIFY WALL TYPES TO
4750 CO-400 4800 F.F.L 44800 ACHIEVE THE REQUIRED FIRE RATING ACCORDING TO THE (FIRE &LIFE
SAFETY CIVIL DEFENSE) DRAWINGS.
1800
490 1250 1180 1250 640 500 1250 1200 1250 600 7. THE ZERO LEVEL IS +666.717 ACCORDING TO THE TOPOGRAPHIC SURVEY
(DLTM).
4000
4000
2200
PROJECT NORTH
10th FLOOR LEVEL
300
300
300
300
F.F.L 40800
1800
CMU-300
200 CMU-300
4000
4000
4800 350 200 4800 350
2200
5250 100 5250 100 PART 03
KEY PLAN
PART 02 9th FLOOR LEVEL
5350 5350 F.F.L 36800
ELEV. 02&03 ELEV. 04&05
1800
4000
4000
7 7 T2
2200
404.00
8 404.00
8 8th FLOOR LEVEL
F.F.L 32800
1800
4000
4000
2200
7th FLOOR LEVEL
F.F.L 28800
1800
SCALE 1 : 50 8 SCALE 1 : 50 8
4000
4000
7 1
2200
404.00 404.01 6th FLOOR LEVEL
65700
65200
F.F.L 24800
5350 5350
1800
LEGEND
5250 100 5250 100
4000
4000
200 4950 200 200 4950 200
2200
5th FLOOR LEVEL
F.F.L 20800
1800
150
200
200
200
200
300
300
B B B B
4000
4000
900
2200
750
CMU-300 CMU-300
600
600
600
600
CMU-200 4th FLOOR LEVEL
CO-300 CO-300 F.F.L 16800
CMU-200
150
1800
300
300
300
4000
4000
CMU-200 CO-350
2200
CO-350 CMU-200 PART 02
PART 01 3rd FLOOR LEVEL
F.F.L 12800
1800
4100
4100
4100
4100
3900
3900
3900
3900
4000
4000
2600
2600
2600
2600
2200
3050
ELEV.02 ELEV.03 ELEV.02 ELEV.03
2900
2nd FLOOR LEVEL
F.F.L 8800
1800
4800 4800
4000
4000
580 1250 1150 1250 580 580 1250 1150 1250 580
2200
1st FLOOR LEVEL
F.F.L 4800
300
300
1800
4000
4000
CMU-300 CMU-300
200 4800 350 200 4800 350
2200
GROUNDFLOOR LEVEL
5250 100 5250 100 F.F.L 800
800
800
5350 5350
2500
ZERO LEVEL
F.F.L 0 01 ISSUED FOR CONSTRUCTION SUBMISSION REV.01 11/01/2024
1
4000
4000
00 ISSUED FOR CONSTRUCTION SUBMISSION 06/12/2023
7
2200
404.01 01 TECHNICAL DESIGN SUBMISSION 26/10/2023
404.00
8 8 BASEMENT 01 FLOOR LEVEL 00 TECHNICAL DESIGN SUBMISSION 31/08/2023
F.F.L -4000 01 DESIGN DEVELOPMENT SUBMISSION REV.01 22/06/2023
1800
00 DESIGN DEVELOPMENT SUBMISSION 18/05/2023
REV. REVISIONS DATE
4000
4000
3 ELEV.02&03-GROUNDFLOOR LAYOUT PLAN 4 ELEV.02&03-TYPICAL FLOOR LAYOUT PLAN
2200
BASEMENT 02 FLOOR LEVEL THIS DRAWING IS THE PROPERTY OF ABDULMOHSIN ALTHEYAB & PARTNERS
SCALE 1 : 50 SCALE 1 : 50 F.F.L -8000 AND SHALL NOT BE COPIED OR REPRODUCED IN ANY MANNER WITHOUT
THE WRITTEN CONSENT OF ABDULMOHSIN ALTHEYAB & PARTNERS.
1600
PROJECT
7 8 7 8
404.00 404.00
5380 ZOOD RESIDENTIAL
5350 5250 120
TOWER 2
200
5250
4950
100
200
200 4950 230
7 ELEV.02&03-OVERALL
SCALE 1 : 200
SECTION
SHEET INFORMATION
DISCIPLINE ARCHITECTURE
230
230
230
230
200
200
300
300
B B B B STAGE IFC
CMU-200
680
680
680
FIRST ISSUE DATE 18/05/2023
600
600
600
CMU-300
4950
CMU-200 CO-300 Elevator Level Schedule DRAWN NADA ESMAT
230
230
300
300
4100
4150
4150
FORMAT A1
2nd FLOOR LEVEL +8.80 +8.65
3900
3900
3930
3930
F.F.L. +57.70
3rd FLOOR LEVEL +12.80 +12.65 CLIENT
2700
2700
2700
2600
2600
2600
S.S.L. +52.80
ELEV.02 ELEV.03
4th FLOOR LEVEL +16.80 +16.65
4800 5th FLOOR LEVEL +20.80 +20.65
ZOOD REAL ESTATE
GN-8
580 1250 1150 630 630 580 503.00
6th FLOOR LEVEL +24.80 +24.65
COP.01 7th FLOOR LEVEL +28.80 +28.65 SHEET TITLE
8th FLOOR LEVEL +32.80 +32.65
300
300
330
330
5 ELEV.02&03-ROOFANNEXFLOOR
SCALE 1 : 50
LAYOUT PLAN 6 ELEV.02&03-ROOFDECKFLOOR
SCALE 1 : 50
LAYOUT PLAN 2231 - ATA -IFC - 2D-RE -T2- AR - 404.00
3 / 404.01
+966 500 049 253 P.O. Box 67501, Riyadh 11517
WWW.ATA-ARCHITECTS.COM KSA
2 / 404.01 C.R. No. 3036 / 0
9th FLOOR LEVEL NOTES
F.F.L 36800
1. ALL WORK IS TO BE CARRIED OUT IN STRICT ACCORDANCE WITH
1800
3. ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS MUST BE
ELEV.02 CHECKED ON SITE BEFORE COMMENCEMENT OF
4. CONSTRUCTION WORK. ANY DISCREPANCIES ARE TO BE REPORTED
TO A.T.A. IMMEDIATELY.
1800
ALL MATERIALS AND PRODUCTS SPECIFIED ON THIS DRAWING,
ELEV.02 GN-5 WHETHER BY BRANDED NAME OR GENERIC DESCRIPTION, ARE TO
BE CONSTRUCTED STRICTLY ACCORDING TO THE MANUFACTURERS
4000
4000
T.O.P. +57.70
5. RESPONSIBILITY SHOULD THE CONTRACTOR DEVIATE FROM THIS
3600
INSTRUCTION.
ALL REPRESENTATIONS ON THIS DRAWING ARE THE PROPERTY OF
ELEVATOR LOBBY
4000
900
T2 L08 18 AND PROTECTED BY COPYRIGHT AND MAY THEREFORE NOT
BE REPRODUCED.
3600
ROOF DECKFLOOR LEVEL 6. CONTRACTORE IS RESPONSIBLE TO CHECK &VERIFY WALL TYPES TO
ACHIEVE THE REQUIRED FIRE RATING ACCORDING TO THE (FIRE &LIFE
F.F.L 56800
ELEVATOR LOBBY SAFETY CIVIL DEFENSE) DRAWINGS.
T2 L02 22 7. THE ZERO LEVEL IS +666.717 ACCORDING TO THE TOPOGRAPHIC SURVEY
(DLTM).
PROJECT NORTH
2150
8th FLOOR LEVEL
F.F.L 32800
ELEV.02
2nd FLOOR LEVEL
F.F.L 8800
KEY PLAN
1800
4000
ELEV. 02&03 ELEV. 04&05
3450
ELEVATOR LOBBY
1800
T2 RA 22
T2
4000
3600
ELEVATOR LOBBY
DOOR STRUCTURE OF OPENING= 2200
T2 L07 18
4000
4000
3600
1800
7th FLOOR LEVEL
F.F.L 28800
LEGEND
1st FLOOR LEVEL
F.F.L 4800
1800
4000
3450
1800
ELEVATOR LOBBY
T2 L12 18
4000
3600
DOOR STRUCTURE OF OPENING= 2200
4000
4000
T2 GR 23 T2 L06 12
20800
20800
1800
6th FLOOR LEVEL
24000
24000
F.F.L 24800
20900
GROUNDFLOOR LEVEL
F.F.L 800
1800
4000
800
800
3600
ELEVATOR LOBBY
ZERO LEVEL
F.F.L 0
T2 L11 18
2500
4000
3600
LOBBY ELEVATOR LOBBY
01 ISSUED FOR CONSTRUCTION SUBMISSION REV.01 11/01/2024
T2 L05 18
4250
4000
1800
5th FLOOR LEVEL
F.F.L 20800 THIS DRAWING IS THE PROPERTY OF ABDULMOHSIN ALTHEYAB & PARTNERS
AND SHALL NOT BE COPIED OR REPRODUCED IN ANY MANNER WITHOUT
THE WRITTEN CONSENT OF ABDULMOHSIN ALTHEYAB & PARTNERS.
PROJECT
1800
4000
ZOOD RESIDENTIAL
3600
BASEMENT 01 FLOOR LEVEL ELEVATOR LOBBY
F.F.L -4000
T2 L10 18
TOWER 2
DOOR STRUCTURE OF OPENING= 2200
4000
4000
3600
1800
SHEET INFORMATION
ELEVATOR LOBBY DISCIPLINE ARCHITECTURE
T2 L04 19
LOBBY
3650
STAGE IFC
B02 14 10th FLOOR LEVEL
F.F.L 40800
FIRST ISSUE DATE 18/05/2023
DOOR STRUCTURAL OPENING= 2200
4000
4000
1800
4th FLOOR LEVEL
F.F.L 16800 APPROVED MOHAMED ALAA
SCALE 1 : 50
FORMAT A1
1800
4000
4000
3600
BASEMENT 02 FLOOR LEVEL ELEVATOR LOBBY
F.F.L -8000
T2 L09 18 ZOOD REAL ESTATE
DOOR STRUCTURE OF OPENING= 2200
4000
4000
1600
3600
SHEET NUMBER
1 ELEV.02&03-SECTION_PART-01
SCALE 1 : 50
2 ELEV.02&03-SECTION_PART-02
SCALE 1 : 50
3 ELEV.02&03-SECTION_PART-03
SCALE 1 : 50
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS
STAMPED AND
SIGNED ISSUED FOR CONSTRUCTION AS APPROVED.
CONSULTANT/DESIGNER
B
900
ROOF DECKFLOOR LEVEL
400
F.F.L 56800
+966 500 049 253 P.O. Box 67501, Riyadh 11517
2150
WWW.ATA-ARCHITECTS.COM KSA
C.R. No. 3036 / 0
4000
4000
NOTES
2200
ROOF ANNEX FLOOR LEVEL
1. ALL WORK IS TO BE CARRIED OUT IN STRICT ACCORDANCE WITH
F.F.L 52800 LOCAL AUTHORITY REQUIREMENTS, RELEVANT BUILDING CODES
1800
AND GOOD BUILDING PRACTICE.
2. THIS DRAWING IS NOT TO BE SCALED. ONLY FIGURED DIMENSIONS
7 7 7
4000
4000
AND LEVELS ARE TO BE USED.
405.00 14 405.00 14 405.00 14 3. ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS MUST BE
2200
CHECKED ON SITE BEFORE COMMENCEMENT OF
12th FLOOR LEVEL 4. CONSTRUCTION WORK. ANY DISCREPANCIES ARE TO BE REPORTED
F.F.L 48800 TO A.T.A. IMMEDIATELY.
1800
3050 ALL MATERIALS AND PRODUCTS SPECIFIED ON THIS DRAWING,
3050 3050 WHETHER BY BRANDED NAME OR GENERIC DESCRIPTION, ARE TO
2950 100
4000
4000
BE CONSTRUCTED STRICTLY ACCORDING TO THE MANUFACTURERS
2950 100 2950 100
RECOMMENDATIONS AND SPECIFICATIONS. A.T.A. TAKES NO
2200
200 2550 300 200 2550 300 200 2550 300 5. RESPONSIBILITY SHOULD THE CONTRACTOR DEVIATE FROM THIS
11th FLOOR LEVEL INSTRUCTION.
CMU-300 CMU-300 CMU-300 F.F.L 44800 ALL REPRESENTATIONS ON THIS DRAWING ARE THE PROPERTY OF
A.T.A.
1800
AND PROTECTED BY COPYRIGHT AND MAY THEREFORE NOT
200
200
200
200
200
200
200
BE REPRODUCED.
4000
4000
300
300
300
300
300
B B B B B B 6. CONTRACTORE IS RESPONSIBLE TO CHECK &VERIFY WALL TYPES TO
2200
ACHIEVE THE REQUIRED FIRE RATING ACCORDING TO THE (FIRE &LIFE
10th FLOOR LEVEL SAFETY CIVIL DEFENSE) DRAWINGS.
700
PRES.SHAFT PRES.SHAFT
600
600
600
600
600
600
600
PRES.SHAFT F.F.L 40800 7. THE ZERO LEVEL IS +666.717 ACCORDING TO THE TOPOGRAPHIC SURVEY
CO-300 CO-300 (DLTM).
1800
300
300
300
300
300
PROJECT NORTH
4000
4000
2200
CO-300 CO-300 CO-300
PART 03
CO-300 PART 02 9th FLOOR LEVEL
F.F.L 36800
CMU-200 CMU-200
1800
4100
3500
4100
4100
4100
4100
4100
CMU-200
KEY PLAN
3900
3900
3900
3900
3900
3900
4000
4000
2200
FIRE ELEV.06 FIRE ELEV.06 FIRE ELEV.06
2600
2600
2600
2600
2600
2600
2600
2600
8th FLOOR LEVEL ELEV. 01 ELEV. 06
F.F.L 32800
1800
2550 T2
4000
4000
2550 2550
2200
700 1250 600 700 1250 600 650 1250 650
7th FLOOR LEVEL
F.F.L 28800
1800
300
300
300
300
300
300
4000
4000
66650
2200
CMU-300 CMU-300
CMU-300 ELEV. PIT 900 1250 900 850 1250 950 6th FLOOR LEVEL
900 1250 800 100 AT -9.35 M 2950 100 2950 100 F.F.L 24800
67350
67350
1800
2950 100 3050 3050
4000
4000
3050
2200
5th FLOOR LEVEL
F.F.L 20800 LEGEND
7 14 7 14 7 14
1800
405.00 405.00 405.00
4000
4000
2200
4th FLOOR LEVEL
F.F.L 16800
1800
1 ELEV.06-BASEMENT 02FLOOR LAYOUT PLAN 2 ELEV.06-BASEMENT 01FLOOR LAYOUT PLAN 3 ELEV.06-GROUNDFLOOR LAYOUT PLAN
4000
4000
2200
SCALE 1 : 50 SCALE 1 : 50 SCALE 1 : 50 PART 02
PART 01 3rd FLOOR LEVEL
F.F.L 12800
1800
4000
4000
2200
2nd FLOOR LEVEL
F.F.L 8800
1800
4000
4000
2200
1st FLOOR LEVEL
F.F.L 4800
1800
4000
4000
2200
GROUNDFLOOR LEVEL
F.F.L 800
800
800
2500
17 7 ZERO LEVEL
7
405.01
405.00 14 405.00 14 14 F.F.L 0
405.00
4000
4000
2200
3050 3050 3080 BASEMENT 01 FLOOR LEVEL
F.F.L -4000 01 ISSUED FOR CONSTRUCTION SUBMISSION REV.01 11/01/2024
2950 100 2950 100 2950 120
1800
00 ISSUED FOR CONSTRUCTION SUBMISSION 06/12/2023
200 2550 330
200 2550 300 200 2550 300 01 TECHNICAL DESIGN SUBMISSION 26/10/2023
4000
4000
00 TECHNICAL DESIGN SUBMISSION 31/08/2023
CMU-300
2200
CMU-300 01 DESIGN DEVELOPMENT SUBMISSION REV.01 22/06/2023
BASEMENT 02 FLOOR LEVEL 00 DESIGN DEVELOPMENT SUBMISSION 18/05/2023
F.F.L -8000 REV. REVISIONS DATE
200
200
200
200
230
230
230
230
1650
1650
300
300
300
300
B B B B B B
PRES.SHAFT THIS DRAWING IS THE PROPERTY OF ABDULMOHSIN ALTHEYAB & PARTNERS
680
680
PRES.SHAFT
600
600
600
600
600
600
580
PRES.SHAFT 2550
AND SHALL NOT BE COPIED OR REPRODUCED IN ANY MANNER WITHOUT
CO-300 CO-300 THE WRITTEN CONSENT OF ABDULMOHSIN ALTHEYAB & PARTNERS.
180
230
300
300
300
300
PROJECT
CO-300 CMU-200 CO-300 7 ELEV.06-OVERALL
SCALE 1 : 200
SECTION
CMU-200 GN-8
503.00 ZOOD RESIDENTIAL
4100
4100
4100
4100
4150
4150
TOWER 2
3900
3900
3900
3900
3900
FIRE ELEV.06
3930
2750
2700
2700
FIRE ELEV.06 FIRE ELEV.06 F.F.L. +57.70
2600
2600
2600
2600
2600
2600
S.S.L. +52.80
ACCESS SHEET INFORMATION
2550 HATCH Elevator Level Schedule DISCIPLINE ARCHITECTURE
2550 650 1250 650
650 1250 650
Name F.F.L S.S.L STAGE IFC
300
300
300
330
330
GN-2
500.00 2nd FLOOR LEVEL +8.80 +8.65 CHECKED NESMA ABOBAKR
CMU-300 SLAB OPEN
CMU-300 850 1250 950 850 1250 950 ABOVE 3rd FLOOR LEVEL +12.80 +12.65 APPROVED MOHAMED ALAA
SHEET NUMBER
C B
1 / 405.01
1800
2. THIS DRAWING IS NOT TO BE SCALED. ONLY FIGURED DIMENSIONS
AND LEVELS ARE TO BE USED.
3. ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS MUST BE
CHECKED ON SITE BEFORE COMMENCEMENT OF
3rd FLOOR LEVEL
4. CONSTRUCTION WORK. ANY DISCREPANCIES ARE TO BE REPORTED
F.F.L 12800 GN-2 TO A.T.A. IMMEDIATELY.
500.00
GN-5 ALL MATERIALS AND PRODUCTS SPECIFIED ON THIS DRAWING,
WHETHER BY BRANDED NAME OR GENERIC DESCRIPTION, ARE TO
4000
4000
T.O.P. +57.70 BE CONSTRUCTED STRICTLY ACCORDING TO THE MANUFACTURERS
3600
RECOMMENDATIONS AND SPECIFICATIONS. A.T.A. TAKES NO
5. RESPONSIBILITY SHOULD THE CONTRACTOR DEVIATE FROM THIS
INSTRUCTION.
1800
ELEVATOR LOBBY T.O.P. +57.20 ALL REPRESENTATIONS ON THIS DRAWING ARE THE PROPERTY OF
900
T2 L08 15 A.T.A.
AND PROTECTED BY COPYRIGHT AND MAY THEREFORE NOT
ROOF DECKFLOOR LEVEL BE REPRODUCED.
F.F.L 56800 6. CONTRACTORE IS RESPONSIBLE TO CHECK &VERIFY WALL TYPES TO
ACHIEVE THE REQUIRED FIRE RATING ACCORDING TO THE (FIRE &LIFE
DOOR STRUCTURAL OPENING= 2200
4000
7. THE ZERO LEVEL IS +666.717 ACCORDING TO THE TOPOGRAPHIC SURVEY
3600
(DLTM).
2150
8th FLOOR LEVEL
F.F.L 32800 PROJECT NORTH
ELEVATOR LOBBY
T2 L02 19
1800
4000
4000
3450
2nd FLOOR LEVEL ELEV. 01 ELEV. 06
F.F.L 8800
ELEVATOR LOBBY
4000
4000
T2 RA 18
3600
PRES.SHAFT
1800
PRES.SHAFT
ELEVATOR LOBBY
T2 L07 15
ROOF ANNEX FLOOR LEVEL
F.F.L 52800
DOOR STRUCTURAL OPENING= 2200
4000
4000
3750
1800
F.F.L 28800
ELEVATOR LOBBY
T2 L01 20
LEGEND
1800
4000
3600
1st FLOOR LEVEL
F.F.L 4800
3600
4000
4000
T2 L12 15
ELEVATOR LOBBY
1800
T2 L06 09
FIRE ELEV.06
24000
12th FLOOR LEVEL
F.F.L 48800
DOOR STRUCTURAL OPENING= 2200
4000
4000
3600
20800
20800
1800
F.F.L 24800
ELEVATOR LOBBY FIRE ELEV.06
T2 GR 20
1800
20000
4000
4000
3600
GROUNDFLOOR LEVEL
F.F.L 800
800
4000
T2 L11 15
3600
ZERO LEVEL
F.F.L 0
2500
1800
4300
F.F.L 20800
DOOR STRUCTURAL OPENING= 2200
4000
4000
B01 25 PROJECT
4000
3600
ZOOD RESIDENTIAL
TOWER 2
DOOR STRUCTURAL OPENING= 2200
ELEVATOR LOBBY
4000
4000
F.F.L. -3.90
T2 L10 15
3600
1800
F.F.L 16800 CHECKED NESMA ABOBAKR
DOOR STRUCTURAL OPENING= 2200
LOBBY
4000
4000
B02 11
SCALE 1 : 50
1800
FORMAT A1
4000
3600
CLIENT
ELEVATOR LOBBY
ZOOD REAL ESTATE
DOOR STRUCTURAL OPENING= 2200
4000
4000
ELEVATOR 01&06-DETAILS
1600
SHEET NUMBER