0% found this document useful (0 votes)
38 views3 pages

IV Priming Checklist Retdem

The document outlines the procedure for priming IV tubing as part of a Bachelor of Science in Nursing program. It includes sections on definition, purpose, equipment needed, considerations before and after the procedure, and documentation requirements. A detailed step-by-step procedure is provided, emphasizing hand hygiene and the importance of maintaining sterility throughout the process.

Uploaded by

maxiabdulahmaxi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views3 pages

IV Priming Checklist Retdem

The document outlines the procedure for priming IV tubing as part of a Bachelor of Science in Nursing program. It includes sections on definition, purpose, equipment needed, considerations before and after the procedure, and documentation requirements. A detailed step-by-step procedure is provided, emphasizing hand hygiene and the importance of maintaining sterility throughout the process.

Uploaded by

maxiabdulahmaxi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

JAMIATU DANSALAN AL-ISLAMIA FOUNDATION

Jims Café, Panggao Saduc, Marawi City

BACHELOR OF SCIENCE IN NURSING

NAME: ___________________________________ DATE: __________

PRIMING IV TUBING

DEFINITION:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

PURPOSE:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

EQUIPMENT:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

CONSIDERATION BEFORE, DURING AND AFTER THE PROCEDURE:


______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

THINGS TO DOCUMENT AFTER THE PROCEDURE:


______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
PROCEDURE RATIONALE 3 2 1 0

1. 1. Perform hand hygiene.

2. 2. Check order to verify solution,


rate, and frequency.

3. 3. Gather supplies.

4. 4. Remove IV solution from outer


packaging and gently squeeze.

5. 5. Remove primary IV tubing


from outer packaging.

6. 6. Move the roller clamp about 3


cm below the drip chamber and
close the clamp.

7. 7. Remove the protective cover


on the IV solution port and keep
sterile. Remove the protective
cover on the IV tubing spike.

8. 8. Without contaminating the


solution port, carefully insert the
IV tubing spike into the port,
gently pushing and twisting.

9. 9. Hang bag on IV pole.

10. 10. Fill the drip chamber one-


third to one-half full by gently
squeezing the chamber. Remove
protective cover on the end of
the tubing and keep sterile.

11. 11. With distal end of tubing over


a basin or sink, slowly open roller
clamp to prime the IV tubing.
Invert backcheck valve and ports
as the fluid passes through the
tubing. Tap gently to remove air
and to fill with fluid.

12. 12. Once IV tubing is primed,


check the entire length of tubing
to ensure no air bubbles are
present.

13. 13. Close roller clamp. Cover end


with sterile dead-ender or sterile
protective cover. Hang tubing on
IV pole to prevent from touching
the ground.
14. 14. Label tubing and IV bag with
date, time, and initials.

15. 15. Perform hand hygiene.

TOTAL: _______________________

You might also like