Merging Section 01
Merging Section 01
METAGAL CROSS
Right of way
H H
20720 to 9000 20720 to 9000
Left Carriageway 1500 to 4500 Right Carriageway
2000 2000
Median
Gore Area With Chevron Markings CL Gore Area With Chevron Markings Start of Improvement
6000 to 0 6000 to 0
387500 CH : 387+500
MERGING
Footpath Footpath
Cum Drain Cum Drain
SECTION
Granular Sub base (GSB)
G Subgrade
387550 G
- 110.00M
METAGAL CROSS
Right of way
387600
22000 to 20720 22000 to 20720
Left Carriageway 1500 Right Carriageway
2000 2000
Median
Gore Area With Chevron Markings Gore Area With Chevron Markings
7.5 7.5
CL
F 7000 to 6000 7000 to 6000 F
2 1.5 1
2.5% 2.5%
Section - B
Footpath
Cum Drain
Footpath
Cum Drain 387650
Bituminous Concrete (BC) 14.5
Vehicular Drain Connecting
MCW and Service Road
Dense Bituminous Macadam (DBM)
Wet Mix Macadam (WMM)
Vehicular Drain Connecting
MCW and Service Road
14.5
Granular Sub base (GSB)
Subgrade
388250
Right of way
21770 to 19370
2000 to 2250
21770 to 19370
14.5 14.5
Median
2000
Left Carriageway Right Carriageway
2000 7.5 7.5
CL
Gore Area With Chevron Markings
7000 to 5000
Gore Area With Chevron Markings
7000 to 5000 2 1.5
1
Section - B
2.5% 2.5%
388300
Footpath Footpath
D D
Cum Drain Cum Drain
MERGING SECTIO
C
C
Right of way
180.0M N-
Footpath Footpath
Cum Drain Cum Drain
388450
Bituminous Concrete (BC) B
B Dense Bituminous Macadam (DBM)
Wet Mix Macadam (WMM)
Granular Sub base (GSB)
Subgrade