The document outlines a conventional ground improvement method that includes excavating the ground to a depth of 2.0 meters, compacting the surface to a minimum of 95% of maximum dry density, and layering excavated material and road base material. It specifies the required compaction levels for granular fill and road base, as well as the need to cover the compacted surface with concrete blinding. Additionally, it includes details about the tie beam layout and staircase detail for a construction project.

Uploaded by

e.adalarasan88
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views6 pages

Merged

The document outlines a conventional ground improvement method that includes excavating the ground to a depth of 2.0 meters, compacting the surface to a minimum of 95% of maximum dry density, and layering excavated material and road base material. It specifies the required compaction levels for granular fill and road base, as well as the need to cover the compacted surface with concrete blinding. Additionally, it includes details about the tie beam layout and staircase detail for a construction project.

Uploaded by

e.adalarasan88
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

1 2 2' 3 CONVENTIOAL GROUND IMPROVEMENT METHOD:

1. EXCAVATE THE GROUND UP TO 2.0 M BELOW THE EXISTING GROUND VEVEL.


29'-4" 2. S.B.C OF SOIL TAKEN AS 132 KN/M2.
3. COMPACT THE EXCAVATED SURFACE PROPERLY USING HEAVY COMPACTOR (20 TONS)
10'-8" 5'-7" 13'-1" MAKING SURE THAT THE COMPACTION IS NOT LESS THAN 95% OF THE MAXIMUM DRY DENSITY.
4. PLACE LAYERS OF EXCAVATED MATERIAL IN A COMPACTED THICKNESS OF NOT
6' MORE THAN 250 MM TILL THE LEVEL REACHES TO THE PROPOSED FOUNDATION LEVEL.
4' 4' 5. FINALLY PLACE A LAYER OF ROAD BASE MATERIAL IN A COMPECTED THICKNESS
OF NOT MORE THAN 200 MM
E E 6. THE COMPACTION FOR THE GRANULAR FILL MARERIAL AND THE ROAD BASE SHOULD
2"

6'
4'

4'
2'-1"

2'-1"

NOT BE LESS THAN 95% AND 98% OF MMD RESPECTIVELY


2'-10"

7. THE COMPACTED SURFACE SHOULD THEN BE PROTECTED BY IMMEDIATELY COVERING.


2' 2' WITH A LAYER OF CONCRETE BLINDING
3'
12'-1"

7'-5"
2'-6" 2'-6"
3'-1"
2'-6"

2'-6"

3'-8"
D D
2"
5'

5'
7'

3'-5"
7'-4"

5' 5'
5'
3'-3"
3'-4"

2"
1'-5"

C C
6'-6"
3'-3"

1"

5'
2'-8"
45'-3"

1'-7"
6'-6" 2'-6"
9'-7"

9'

2'-10" 6'
1'-8"
3'-1"

4" 5"
1'-7"

B B
3'-3"

6'-6"

2"

2"
6'

3'-2"
3'-3"
6'-6" 3'
16'-3"

2'-6" 2'-6"
2'-6"

2'-6"
A A

5'

5'
5' 5'
10'-8" 18'-8"
29'-4"
1 2 2' 3
PROJECT:
CLIENT NAME:
PLOT NO:
LOCATION:
DRWG. TITLE: TIE BEAM LAYOUT
SCALE 1/8"=1'-0" JOB NO.
DRAWN BY:
DESIGNED BY: DRAWING NO.
CHECKED BY: -
APPROVED BY: SHEET NO.
REVISED BY:
1 2 2' 3
29'-4"
10'-8" 5'-7" 13'-1"
E E
12'-1"

D D
"
12
7'-4"

C C
45'-3"

9'-7"

B B
16'-3"

A A
10'-8" 18'-8"
29'-4"
1 2 2' 3
PROJECT:
CLIENT NAME:
PLOT NO:
LOCATION:
DRWG. TITLE: TIE BEAM LAYOUT
SCALE 1/8"=1'-0" JOB NO.
DRAWN BY:
DESIGNED BY: DRAWING NO.
CHECKED BY: -
APPROVED BY: SHEET NO.
REVISED BY:
1 2 2' 3
29'-4"
10'-8" 5'-7" 13'-1"
E E
12'-1"

D D
7'-4"

TYPICAL DETAIL OF ENTRANCE STEPS


C C
45'-3"

9'-7"

B B
16'-3"

A A
10'-8" 18'-8"
29'-4"
PROJECT:
1 2 2' 3 CLIENT NAME:
PLOT NO:
LOCATION:
DRWG. TITLE: TIE BEAM LAYOUT
SCALE 1/8"=1'-0" JOB NO.
DRAWN BY:
DESIGNED BY: DRAWING NO.
CHECKED BY: -
APPROVED BY: SHEET NO.
REVISED BY:
1 2 2' 3
29'-4"
10'-8" 5'-7" 13'-1"
E E
12'-1"

D D
7'-4"

C C
45'-3"

9'-7"

B B
16'-3"

A A
10'-8" 18'-8"
29'-4" PROJECT:
CLIENT NAME:
1 2 2' 3
PLOT NO:
LOCATION:
DRWG. TITLE: TIE BEAM LAYOUT
SCALE 1/8"=1'-0" JOB NO.
DRAWN BY:
DESIGNED BY: DRAWING NO.
CHECKED BY: -
APPROVED BY: SHEET NO.
REVISED BY:
1 2 2' 3
29'-4"
10'-8" 5'-7" 13'-1"
E E
12'-1"

D D
7'-4"

C C
45'-3"

9'-7"

B B
16'-3"
A A
10'-8" 18'-8"
29'-4"
PROJECT:
1 2 2' 3 CLIENT NAME:
PLOT NO:
LOCATION:
DRWG. TITLE: TIE BEAM LAYOUT
SCALE 1/8"=1'-0" JOB NO.
DRAWN BY:
DESIGNED BY: DRAWING NO.
CHECKED BY: -
APPROVED BY: SHEET NO.
REVISED BY:
FIRST F.F.LVL
+16'-0"
DR
SCHEDULE&LAYOUT
Y12@6"C/C TOP&BOTT
Y10@8"C/C TOP&BOTT
Y12@6"C/C TOP MID LANDING LVL
+11'-0" F.FLVL
Y12@6"C/C
Y10@6"C/C
SCALE 1=1/2"
Y12@3"C/C
ARCH (OP2) PROJECT:
AS / ARCHITECTURE
CLIENT NAME:
PLOT NO:
LOCATION:
DRWG. TITLE: STAIRCASE DETAIL
SCALE 1/8"=1'-0" JOB NO.
DRAWN BY:
DESIGNED BY: DRAWING NO.
CHECKED BY: -
APPROVED BY: SHEET NO.
REVISED BY: