0% found this document useful (0 votes)
26 views1 page

ETAP Direct2D Printing2

The document presents a one-line diagram for load flow analysis of an electrical system, detailing various components including transformers, reconectadores, and buses with their respective power ratings and power factors. It includes information on the electrical loads, voltage levels, and current measurements throughout the system. The diagram serves as a comprehensive overview for analyzing the electrical distribution and performance of the system.

Uploaded by

quijadanoelyinq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

ETAP Direct2D Printing2

The document presents a one-line diagram for load flow analysis of an electrical system, detailing various components including transformers, reconectadores, and buses with their respective power ratings and power factors. It includes information on the electrical loads, voltage levels, and current measurements throughout the system. The diagram serves as a comprehensive overview for analyzing the electrical distribution and performance of the system.

Uploaded by

quijadanoelyinq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

One-Line Diagram - OLV1 (Load Flow Analysis)

1000 kW
Cummins
1730 kW 1730 kW
Mitshuvichi#1 Mitshuvichi#3.

Reconectador1. Reconectador3
Reconectador2 O-->I
1742 kVA O-->I

34,5 kV Por2co
2095 A Open
O-->I
0,48 kV 95,22% PF Barra principal
1277 kVA
Open
1817 kVA 175 kVA 35 kVA 22,1 A
CB2 CB14 O-->I
95,36% PF
2185 A 210,5 A 42,1 A
Reconectador5
91,28% PF 0% PF 0% PF Open
Tx 2000kva TX3000
CB16
2000 kVA 3000 kVA
Banco 5 selectores Banco 3 selectores
175 kvar 105 kvar 1262 kVA
0,251 V Vd,ln Banco 2 selectores
183,4 A Celda Diasa
35 kvar
4,16 kV 96,21% PF
78,5 kVA 1756 kVA 1275 kVA
Bus3 994,5 kVA o
282,2 kVA
P9 1,4 A 30,4 A 22,1 A o 144,6 A 41 A R
34,5 kV 89,96% PF 34,5 kV 93,48% PF 95,54% PF 4,3 V Vd,ln R
93,7% PF -99,99% PF
CB5
81,2 kVA 0,223 V Vd,ln 208,7 kVA 204,3 kVA 1000 kVA
3,6 A 3,5 A TX300kva2 Cable 4/0 5Kv
1,4 A
TX300kva 87,84% PF 83,24% PF TX 1000kva Su. CB7 20 m
86,94% PF
300 kVA 300 kVA Bus49 0,171 V Vd,ln
201 kVA 196,3 kVA CB 1000Amp
253,2 A 247,8 A 0,48 kV O-->I
TX2000
Bus4 89,53% PF 85% PF Bus5 Open Bus7
0,48 kV Cable 350MCM
0,48 kV 201 kVA 196,3 kVA 0,48 kV
253,2 A 247,8 A 281,8 kVA 281,8 kVA
Subestacion Emilia
89,53% PF 85% PF 355,4 A 355,4 A 2000 kVA
260 m
34,5 kV 0,196 V Vd,ln -99,98% PF 150 m -99,98% PF
83,3 kVA
Bus9 CB10 CB12
1,4 A oficina y bombas capa.compresor Cable 4/0 5Kv2 0,48 kV
84,76% PF 1x50 kvar
200 kVA compresor GA315 133,1 kVA 76 kVA 76 kVA 76 kVA 76 kVA
TX 3x333Kva 8,8 V Vd,ln
compresor GA160 servicios 350 HP CB4 169,9 A 97 A 97 A 97 A 97 A
999 kVA
83 kVA 201 kVA 0% PF 91,51% PF 91,51% PF 91,51% PF 91,51% PF
101,1 A
Bus32 85% PF 3,3 V Vd,ln
Mtr1 Mtr3 Mtr4
0,48 kV Caja de paso 416v P1125 Mt2
83 kVA 125 HP 125 HP CB vent4
125 HP
CAP2 125 HP
101,1 A Cable 4/0 5Kv10 150 kvar
85% PF
100 m 989,2 kVA
144,6 A Ven2lador 50hpRP/SrFael
Emilia Celda -12 50 HP
83 kVA 93,72% PF
4,16 kV
227,5 kVA 3,4 V Vd,ln 761,8 kVA
33,2 A 111,3 A 0,48 kV Cable 4/0 2Kv8 37,4 kVA Ven2lador 50hpRp/SRFael
93,84% PF 93,69% PF
TX600 0,48 kV Bus54 47,5 A 50 HP
600 kVA Cable 4/0 5Kv4 250 m 91,51% PF
224,6 kVA 80 m Bus52 37,4 kVA
TX 650Kva -100 166,4 kVA
276,6 A Cable 4/0 5Kv12 4,16 kV 650 kVA 47,5 A
1 V Vd,ln 201,5 A
Bus11 94,46% PF 91,51% PF
Caja de paso 416v #2 -82 88,37% PF Cable 4/0 2Kv26
0,48 kV Caja de paso 416v -82 220 m 180 m Bus56 M-Jumbo
119,6 kVA 112,6 kVA
Cable 4/0 2Kv 150,6 kVA 150,6 kVA 149,8 kVA
147,2 A 138,6 A 1,3 V Vd,ln 100 HP
99,62% PF 60 m 82,68% PF 22 A 22 A 181,4 A 12,5 V Vd,ln 84,3 kVA 0,48 kV
3,6 V Vd,ln 100 m 97,93% PF 98,16% PF
3 V Vd,ln Cable 4/0 5Kv6 60 m 97,93% PF Bus53 107 A cbjumbo 82,8 kVA
Bus17 4,7 V Vd,ln
Bus12 84,59% PF 107 A
0,48 kV Cable 4/0 2Kv2 612,6 kVA 1,1 V Vd,ln CB Cap9
0,48 kV Caja de paso 416v -127 CAP8 84,39% PF
118 kVA Bus10 89,6 A
Cable 4/0 2Kv25 147,2 A TX300Kva-127 4,16 kV 92,31% PF 100 m 49,3 kVA
39,5 kVA 32,7 kVA 39,5 kVA Cable 4/0 5Kv21 59,7 A 50 kvar
99,65% PF 300 kVA
0,142 V Vd,ln 49,1 A 40,7 A 49,1 A 195,2 kVA 417,6 kVA Bus43 0% PF
1,6 V Vd,ln
4m 79,93% PF 88,11% PF 79,93% PF 191,2 kVA 28,6 A 61,1 A 4,16 kV 416,9 kVA
46,4 kVA 247,5 A 90,55% PF 93,08% PF 61,1 A Bomba 40Hp -205
Bus57 Cable 4/0 5Kv8
58 A Bomba 50Hp -127 91,71% PF 417,2 kVA 93,08% PF TX1500Kva NIVEL -163 40 HP
150 m 1500 kVA
0% PF Bomba 50Hp -82 50 HP 0,48 kV CB vent2 61,1 A
CB Cap3 0,48 kV 200 m 191,2 kVA 93,08% PF 413,6 kVA 29,4 kVA
50 HP Bus18
130,3 kVA Cable 2/0 2Kv4 247,5 A 508,3 A 36,2 A
Bus44 4,16 kV
CAP1 162,6 A 91,71% PF 0 kVA 2,1 V Vd,ln Bus26 93,6% PF 89,85% PF
90,21% PF 0A 0,48 kV
50 kvar Bus13 TX 1000kva-146 47,9 kVA 120 kVA 89,8 kVA 95,8 kVA 99,1 kVA 6,1 V Vd,ln
0% PF
Reise Boring 58,9 A 147,5 A 110,4 A 117,7 A 121,8 A 200 m
0,48 kV 9,83 kVA 22,5 kVA 1000 kVA 4,3 V Vd,ln
Bomba 200Hp -10 0,424 V Vd,ln 200 HP 0% PF 82,92% PF 92,1% PF 91,51% PF 91,56% PF Cable 4/0 2Kv17
200 HP 12,4 A 28,4 A 0 kVA
85% PF 89,18% PF CB Cap5 Cable 4/0 2Kv12 120 mCable 4/0 2Kv19
0A 96,9 kVA
Taller mecanico 60 m 3 V Vd,ln 0% PF CAP5 Bus28 350 m
Bus19 CB ven 121,8 A
10 kVA Cable 4/0 2Kv6 50 kvar
0,48 kV 91,51% PF
CB Cap7 0,48 kV 80,1 kVA 38,1 kVA
22,5 kVA 100 A 47,6 A 9,7 V Vd,ln 125 HP CB vent
28,4 A Cable 4/0 2Kv14 84,19% PF 79,41% PF
89,17% PF 220 m
86,6 kVA ven2lador 125hp -175
Bomba 50Hp -173 110,4 A
Bomba -110 cb 50 HP 92,04% PF Ven2lador 125hp -163
30 HP
CB. 125 HP
78,5 kVA 5,4 V Vd,ln
100 A M-Jumbo RP Placer -215
83,95% PF 100 HP
100 HP
M-Jumbo RP Placer

page 1 17:50:42 nov. 10, 2024 Project File: plano unifilar MSB~~~~